Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

REPAIRS TO UPH 23, F-171

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Far EastView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Far East
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Far East
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Scope of work were based on ICAP inspection and Builder Generated Requirements deficiencies of the facility. Project will perform the following; 1] Replace the entire 1-double aluminum doors Mech. room, 6-ft x 7-ft including frame, and materials accessories; 2] Replace the entire 3-interior single door, 3-ft x 7-ft launge, loundry and storage area including frame, and materials accessories; 3] Replace the entire 6-exterior single aluminium door,3-ft x 7-ft including frame, and materials accessories; 4] Remove the entire 48-interior single door, 3-ft x 7-ft including frame, and materials accessories; 5] Remove the exterior 27-glass windows with frame, 4-ft x 4-ft including frame, and accessories; 6] Remove the exterior 6-glass windows with frame, 3-ft x 4-ft including frame, and accessories; 7] Replace entire acoustical tile ceiling system with gypsum board ceiling system (9652-sf) at various rooms and other related accessories; 8] Replace floor ceramic tiles system bathrooms 9] Replace existing carpet covering composition at various room suites with new vinyl composition tiles; 10] Replace laminate plastic wall around bathroom areas; 11] Repair/ re-plaster damaged / spalled concrete at beams, slab, walls, and roof;12] Prepare roof surfaces, then install smooth surface built-up roofing system complete with asphalt primer, roof insulation with SBS-base interplay, modified bitumen, fiberglass roofing felt and cap sheets, and other required / related accessories; 13] Install new cross main and branch line piping's complete with fittings, pipe support/hanger, brackets and all required accessories for approx. 14,054-sf building; 14 ] Install new toilet with wall mounted flush valve water closet (25-ea), kitchen sink (7-ea), service sink (1-ea), lavatory (25-ea), shower (24-ea), complete with all required accessories; 15 ... NOTE: description has been truncated, please see Project Note for full description.