This Solicitation opportunity from Department Of The Interior was posted on August 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Z--REPLACE ELLIOT KEY BUILDINGS FAILING ROOFS AT BISC
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the complete roof replacement on five structures located on Elliott Key within Biscayne National Park, Florida, under a Firm Fixed Price Construction contract with the U.S. Department of the Interior, National Park Service, through the South MABO office in Homestead. The work encompasses demolition of existing roofs, installation of new hurricane-rated, solar-ready metal roofing systems, and full compliance with federal, state, and local regulations including OSHA, NFPA, ANSI A10.6, and National Park Service standards. The roofing must be Miami-Dade approved 5V crimp panel metal with a minimum 150+ mph wind resistance, backed by a 30-year manufacturer warranty and a 2-year workmanship warranty. Performance is scheduled to begin October 5, 2026, and must be completed within 150 calendar days, including a 30-day weather contingency buffer, ending March 4, 2027. The Government will provide barge transport for materials to the remote site, but the contractor is responsible for all other logistics, handling, storage, and adherence to environmental protections. The place of performance is Elliott Key, and all inspection and acceptance occur on-site by the Contracting Officer’s Representative. The solicitation is a Total Small Business Set-Aside under FAR 19.5, requiring offerors to be certified as small businesses in SAM.gov and to include their UEI number on the proposal. Proposals must be submitted as a single PDF via email to the contracting officer by August 21, 2026, at 1:00 p.m. Eastern Time, and must include a technical proposal not exceeding 20 pages with detailed methodology, a past performance questionnaire, and a comprehensive cost breakdown covering labor, materials, overhead, profit, bonding, and insurance. Evaluation is based on a trade-off process, where non-cost factors—technical approach and past experience in remote, logistically complex environments—are significantly more important than cost, which only becomes decisive if proposals are substantially equal in technical merit. The contractor must comply with numerous FAR clauses related to labor standards, equal opportunity, trafficking prevention, wage requirements, environmental protections, and Buy American provisions, many with deviations. Payment must be submitted electronically through the Treasury’s Invoice Processing Platform, and the contractor is required to furnish performance and payment bonds. The same individual serves as both Contracting Officer and Contracting Officer’s Representative, overseeing compliance, inspections, and acceptance of work, with additional coordination
General Info
Agency
NAICS
Place of Performance
FLSet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from Department Of The Interior → Ser South Mabo (54000)
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
