Replace/install new transportation management systems in AMA, CAL, MPA, MER, SJ, and TUO counties on routes 48, 88, 99, 108, 120 & 140

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Transportation (Caltrans) District 10 in Stockton is implementing project 10-1K670 to replace and install new Traffic Management System (TMS) elements and construct maintenance vehicle pullouts (MVP) across 12 locations. The work is situated within existing Caltrans right of way on Routes 49, 88, 99, 108, 120, and 140, covering Tuolumne, Amador, Calaveras, Merced, Mariposa, and San Joaquin counties. Key deliverables include the removal of existing Hazard Advisory Radio (HAR) components and the installation of new units. Construction activities involve ground disturbance up to a maximum depth of 10 feet, potential vegetation clearing, and the reuse of excess soil for the development of the maintenance vehicle pullouts. The project is classified as a categorical exemption under CEQA and NEPA, as it is determined to have no significant environmental impact on protected species, historic properties, or hazardous materials. Operational requirements include the performance of night work and strict adherence to Caltrans Standard Specifications regarding air pollution, dust control, noise control, and bird protection. The project is managed by the Stockton office, with environmental oversight provided by the Senior Environmental Planner and Project Manager to ensure compliance with all state and federal environmental regulations.

General Info

Replace traffic management systems and build pullouts on six highways across six California counties with night work and soil reuse.

Agency

California → Caltrans, District 10 - Stockton

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(2)

Notice of Exemption for Caltrans TMS Replacement Project

PDFnotice-of-exemption

CEQA Exemption and NEPA Categorical Exclusion Determination Form for Project 10-1K670

PDFcategorical-exclusion-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 10 - Stockton
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 10 - Stockton
Office AddressN/A
Contacts
Elizabeth LorzEnvironmental Scientist (Generalist)

Full Description

Show more
The California Department of Transportation (Caltrans) proposes in Tuolumne, Amador, Calaveras, Merced, Mariposa, and San Joaquin counties, on Routes 49, 88, 99, 108, 120 and 140 at various locations, to replace existing and install new Traffic Management System (TMS) elements, and construct maintenance vehicle pullouts. Ground disturbance will occur with a maximum depth of 10ft and may require vegetation clearing at each location. Excess soil produced from construction activity will be reused as much as possible in the development of the maintenance vehicle pullouts (MVP). Construction will include night work. All locations are within existing right of way as they are established TMS areas and heavily disturbed roadways.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Peninsula Avenue And Delaware Street Traffic Signal Modification Project
Solicitation # 46R031
The Peninsula Avenue and Delaware Street Traffic Signal Modification Project (Project No. 46R031) is a public works solicitation issued by the City of San Mateo, California. The project involves modifying the street lighting system to ensure full functionality and operational capacity, with a scope of work that includes mobilization, temporary traffic and pedestrian control, asphalt paving and base removal, and the installation of various concrete structures, pavement markings, and electrical components. The estimated construction cost is 533,325 dollars, and the project must be completed within 45 working days. Bids are due by 2:00 p.m. on October 15, 2026, and must be submitted as sealed bids to the City Clerk. The contract will be awarded to the lowest responsive and responsible bidder who possesses a Class A contractor's license and the necessary capacity to perform the work. Award criteria include the bidder's experience, the quality of previous work and materials, and the ability to meet the project timeline. Requirements for the winning contractor include providing a bid bond of at least 10 percent of the aggregate bid, as well as performance and payment bonds equal to the full contract price. Additionally, the contractor must comply with California Prevailing Wage Law, ADA accessibility standards, and provide a one-year warranty against latent faults or defective materials. All work must adhere to the 2018 Caltrans Standard Plans and the April 15, 2022, Caltrans Revised Standard Specifications.
CITY OF SAN MATEO, CALIFORNIA

POSTED

about 11 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 11 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS