REPLACE UNDERSIZED BRIDGE CRANE, F-730

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Far EastView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Far East
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Far East
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Project will perform the following: 1]. Install new 32-ton bridge crane according to manufacturer's instruction complete with parts /accessories, 2]. Remove/ re-install existing hooded roof propeller exhaust fan including its controls, roof curb, auto belt tensioner, backdraft damper, bird screen and safety guard prior for the replacement of existing bridge crane, 3]. Remove/ re-install all branch line pipings, fittings, brace/support, hanger, sprinkler heads and all supported accessories for approx. 13,298-sf building in a way of replacement of bridge crane, 4]. Install new rails for the new 32-ton bridge crane complete with all associated accessories, 5]. Remove and re-install all affected LED Floodlights, exhaust fan, conduits, wires, fittings and accessories (additional electrical materials are required), 6]. Replace existing disconnect switch of Overhead Crane complete with power supply, 7]. Removal and reinstallation of all affected roofing system, and 8]. Installation of metal plate support to existing columns to increase capacity.