Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from North Carolina was posted on February 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

REPLACEMENT OF 3.0-MILLION-GALLON RAW WATER TANK AT THE CITY’S WATER TREATMENT PLANT Addendum - 1 & 2

Closed
498-12192026RWR/2State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open-cut installation of PVC and DIP sewer lines ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, a CSO regulator fit out, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional project deliverables include the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass for all pipes and manholes during construction. General project requirements include clearing and grubbing of wooded areas, seeding, fine grading, and select tree removal. Due to the project location and nature, contractors must provide railroad insurance. The bid schedule further accounts for extra depth excavation and the abandonment of existing pipes and manholes. All inquiries and quotations should be directed to John Connelly at Cleary Construction.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the construction of a new wet well and valve vault, the demolition of existing pumps and piping, and the delivery of a fully operating facility equipped with mechanical and electrical systems, a generator, odor control equipment, and stormwater facilities. The project also requires associated site work, including exploratory drilling, rock excavation, and grading. The contract is governed by EJCDC standard general and supplementary conditions, with technical specifications spanning divisions 00 through 44. Award will be granted to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and adherence to submission requirements. Bidders must provide a signed bid form, bid security, and mandatory MWBE documentation, including a Good Faith Efforts Form and Table A, to meet participation goals of 10.9 percent for EPA MBE and 10 percent for the State of North Carolina. Contract administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with a 30-day payment term following the engineer's recommendation.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The contract involves the complete replacement of a 3.0-million-gallon raw water reservoir tank at the City of Elizabeth City's Water Treatment Plant in North Carolina. The project includes all necessary work to ensure the new tank is fully operational, tested, and accepted by both the Owner and Engineer. The contract scope emphasizes that the description provided is not exhaustive, implying additional related tasks may be required to fulfill the project comprehensively. Bidding for the project has been adjusted following multiple inquiries, with the original bid opening date postponed pending further clarification through Addenda 1 and 2. Requests for Information submitted on January 20, 2026, will be addressed fully in the subsequent addendum. The solicitation, issued by the City's local government entity, has a response deadline set for March 12, 2026, and the primary contact for this contract is Randy Lassiter. The contract details and updates are accessible through the state's electronic procurement platform.

General Info

Replace 3-million-gallon reservoir tank at Elizabeth City Water Plant; bids due March 12, 2026.

Documents

5

City of Elizabeth City - Replacement of 3.0-Million-Gallon Raw Water Tank

PDF, High priority: read this firstifb
High

Elizabeth City SRP-D-134-0076 3MG RWR Project - Final Specifications

PDF, High priority: read this firstifb
High

Project 60708836 - Addendum No. 1

PDF, High priority: read this firstamendment
High

Project 60744999 Elizabeth City RWR - Addendum No 2

PDF, High priority: read this firstamendment
High

SRP-D-134-0076: 3MG Raw Water Reservoir Replacement - Final Drawings

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Carolina → City of Elizabeth City
Contacts1 person available
OfficeNC, USA
Office AddressNC, USA
Contacts
Randy Lassiter

Full Description

Show more
The Project consists of Replacement of 3.0-million-gallon Raw Water Reservoir Tank, and all else required, complete in every respect, tested and accepted, placed into operation, to the satisfaction of the Owner and Engineer. The foregoing description shall not be construed as a complete description of all work required. Addendum 1 Issued 01.26.2026 1.) Due to the volume of questions received, the bid opening date will be moved to a new date that will be issued in Addenda 2. 2.) RFIs submitted on January 20th, 2026 will be addressed in Addendum 2. Addendum 2 Issued 02.06.2026

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS