This Solicitation opportunity from Arizona was posted on February 27, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for EMC2 Project 12023968.00 - Addendum No. 01: Addendum No. 01 dated March 6, 2024, for the San Simon - South Septic System Replacement project (EMC2 Project No. 12023968.00). This document modifies the original bid documents dated January 29, 2024, adding requirements for the removal of two mature trees, protection of a flagpole base, and the reworking of irrigation systems and resodding of affected areas.
PDF
PDF, High priority: read this firstifb
HighAI Summary for IFB 24-003-24: Replacement of Campus South Septic Tank System: Invitation for Bid (IFB 24-003-24) issued by San Simon Unified School District #18 for the replacement of the Campus South Septic System, including underground piping, manholes, clean outs, and a new grease separator. The document outlines the project scope, submission deadlines (March 26, 2024), evaluation criteria, and construction instructions. Funding is provided by the Division of School Facilities (DSF).
PDF
PDF, High priority: read this firstifb
HighAI Summary for IFB 24-003-24: Replacement of Campus South Septic Tank System: Invitation for Bid (IFB 24-003-24) issued by San Simon Unified School District, #18 on February 27, 2024. The project involves the replacement of the Campus South Septic System, including underground piping, manholes, clean outs, and a new grease separator. Bids are due electronically by March 20, 2024, at 1:31 pm. The contract will be awarded to the lowest responsive and responsible bidder.
PDF
PDF, High priority: read this first1 page · contract-document
HighAI Summary for Offer and Acceptance Document: This document titled 'Offer and Acceptance' outlines the offeror's agreement to furnish materials, services, or construction in compliance with solicitation terms and conditions. It includes a certification section where the offeror affirms compliance with various legal and regulatory requirements, including anti-collusion, non-discrimination, immigration laws, and export restrictions. The acceptance section binds the contractor to the contract upon acceptance by the school district, specifying that work should not commence until official notice is received. The document is essential for formalizing the contract agreement and ensuring legal compliance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for San Simon School Campus South Septic System Improvement Plans: Technical onsite improvement plans and stamped drawings for the San Simon School Campus South Septic System. The document includes a sheet index covering the cover sheet, sewer plan, septic plan and profile, and plumbing plans, with project contacts from Larson Design Group and EMC2 Architects Planners.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for San Simon USD #18 South Septic Design Project Manual: Project Manual dated January 29, 2024, for the San Simon USD #18 South Septic Design Project (SFB Project No. BRG-004401). The document includes a detailed table of contents covering procurement requirements, general requirements (Division 01), and technical specifications for site work, concrete, metals, and utilities. It also contains geotechnical data and site investigation reports from ACS Services LLC.
XLSX
XLSX, High priority: read this first5 pages · schedule-of-values
HighAI Summary for Schedule of Values for School District Project: This document is a Schedule of Values for a school district project, detailing various construction divisions and associated cost categories. It includes line items for general requirements, existing conditions, concrete, masonry, metals, woods/plastics/composites, thermal/moisture protection, openings, finishes, specialties, equipment, furnishings, special construction, conveying, fire suppression, plumbing, mechanical, integrated automation, electrical, communications, safety and security, earthwork, and exterior improvements. Each division lists specific work elements with corresponding cost placeholders, intended for contractor cost tracking and payment applications. The document is structured as an Excel spreadsheet and serves as a critical financial and project management tool for construction contract administration.
PDF
PDF, Low priorityq-and-a
LowAI Summary for Bid No. 24-003-24 - Replacement of Campus South Septic Tank System Q&A: Question and Answer report dated March 13, 2024, for San Simon Unified School District Bid No. 24-003-24 regarding the Replacement of Campus South Septic Tank System. The document provides clarifications on site visits, temporary fencing, security, road plates, traffic control, work hours, and the 120-day substantial completion timeline.
PDF
PDF, Low priority1 page · other
LowAI Summary for Familial Relationship Disclosure Statement: This document is a Familial Relationship Disclosure Statement required to accompany responses to a solicitation. It mandates that the offeror disclose any familial relationships or conflicts of interest between the firm's owners or employees and members of the Governing Board, Superintendent, or employees of the School District. The statement must be sworn and notarized, affirming the absence or presence of such relationships, with details provided if applicable.
PDF
PDF, Low priority1 page · other
LowAI Summary for Non-Collusion Statement Attachment: This document is a Non-Collusion Statement Attachment affirming that the offeror's submittal is genuine and not made in collusion with others. It includes a sworn affidavit by the offeror, certifying no sham submittals or collusive practices, and compliance with relevant Arizona statutes and administrative codes regarding ethical conduct in contracting. The statement is to be notarized, confirming the authenticity of the affidavit.
PDF
PDF, Low priorityreferences
LowAI Summary for References Attachment for Construction Project: This document is a References Attachment for a construction project bid. It requires a minimum of three references for projects of similar scope in Arizona, including details such as owner, contact person, cell phone number, email address, project value, project dates, and subcontractor information. The references should closely match the project being bid on in terms of bid value, number of subcontractors, and trades needed.
PDF
PDF, Low priority1 page · subcontractors-list
LowAI Summary for Subcontractors List for Project Work: This document is a Subcontractors List submitted in compliance with the Special Terms and Conditions to Bidders and the Contract and General Conditions. It requires the successful bidder to provide the Arizona contractor's license number for each listed subcontractor, with only one subcontractor allowed per portion of the work. The list is based on the Base Bid scope of work and includes instructions for listing asbestos abatement firms if applicable. Failure to comply may result in bid rejection by the Owner.
San Simon Unified School District, #18 is in Cochise County serving our K-12 Community. This is for replacement of Campus South Septic System including all underground piping, manholes, clean out, new grease separator per project construction manual, drawings, and other requirements specified. This project will be funded by the Division of School Facilities (DSF).