Replacement of Conference Room, and Command Suite Windows.
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
168 CES is seeking proposals to replace and upgrade windows and screens in the third floor command suite and conference room of Building 3127 at Eielson Air Force Base, Alaska. The new windows must be triple pane glass with a minimum thickness of 1-3/4 inches and achieve a Sound Transmission Classification (STC) of at least 40. Frames and casements must be fiberglass, with color options subject to approval by 168 CES prior to purchase. The replacement windows must replicate the existing operational functions including opening and closing mechanisms. Existing blinds will be carefully removed during demolition and reinstalled after new window installation. Matching interior and exterior paint will be applied to areas disturbed during the work. Exterior windows will be treated with reflective film to align with the existing film on the south side of the building. The solicitation, numbered W50S6K-26-Q-A001, is a total small business set-aside under NAICS code 236220 with a response deadline of August 10, 2026, and was posted on July 9, 2026. Proposals must be submitted through the SAM.gov portal with Point of Contact Daniel Pankratz and Nicholas Rogers available for inquiries.
General Info
Agency
NAICS
Place of Performance
Eielson AFB, AK, 99702, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
168 CES requests the replacement/upgrade of the existing windows and screens inside Bldg. 3127, third floor command suite and conference room. Replacement windows shall have a minimum Sound Transmission Classification (STC) of 40. The new replacement windows shall be triple pane glass with a thickness of 1-3/4”. The new windows casement/frame shall be fiberglass, and the color selections shall be submitted to 168 CES for final approval prior to purchasing. The new windows shall have the same opening and closing functions/operations as the existing windows. The existing blinds shall be removed during demolition and reinstalled after the new windows have been installed. Paint used shall match any existing interior/exterior colors in the areas of disturbance by window replacement, as needed. The new exterior windows shall have proper reflective window film to match existing windows on the south side of the bldg. 3127. Please see the Statement of Work (SOW) for the full requirement description.
