Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Alabama was posted on November 25, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

REQ #260194- Remarkable for TECH Report

Closed
SRC0000032057State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423420
New
International
Adquisicionde equipo de videoconferencia y UPS para rack para las oficinas de UNOPS en Honduras This tender has been posted through the UNOPS eSourcing system. / Cet avis a été publié au moyen du système eSourcing de l'UNOPS. / Esta licitación ha sido pub
Solicitation # RFQ/2026/65434
UNOPS is soliciting the acquisition of videoconferencing equipment and rack-mounted UPS systems for its offices in Tegucigalpa, Honduras, under solicitation RFQ/2026/65434. The procurement is divided into two distinct lots: Lot 1 includes one interactive screen, one modular intelligent videoconferencing system with a robotic mobile camera, and two videoconferencing televisions; Lot 2 consists of one rack-mounted UPS with a minimum apparent capacity of 1.5 kVA and real power of 1.35 kW. To ensure interoperability and avoid shared implementation responsibilities, Lot 1 will be awarded to a single provider. The scope of work extends beyond delivery to include full integration, configuration, validation, and training for 30 users and two administrators. The contract operates under DAP 2020 Incoterms, with the contractor responsible for all loading, unloading, and internal transfers at the destination site. The total period for delivery, installation, and commissioning is 70 calendar days from the date of contract signing, though priority deliveries may be coordinated within the first 15 to 20 days if local inventory is available. Payments are processed via bank transfer within 30 days of receiving the goods and required documentation. Bidders must submit technical offers using the specified technical form and data sheets, and the successful bidder must provide a Manufacturer Authorization Letter to verify official warranty and technical support. All equipment must be new and subject to functional testing at the delivery site before the issuance of a final acceptance act.
UNOPS

POSTED

6 days ago

DEADLINE

N/A

General Info

Place of Performance

AL, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this first4 pages · standard-terms-and-conditions
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • High-Capacity PrinterOpen now, due in 12 days
  • RTD's Print Shop Production PrintersOpen now, due in 30 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyAlabama → IT - Tech Report
Contacts1 person available
OfficeAL, USA
Organization / AgencyAlabama → IT - Tech Report
Office AddressAL, USA
Contacts
Allison Robison

Full Description

Show more
The quoting vendor will need to provide a quote for QTY (3) reMarkable 2 tablets with black marker plus and book folio in black premium leather . This quote will also need to include shipping to the below address.Alabama Department of Insurance201 Monroe streetSuite: 502Montgomery, AL 36104Tablet: reMarkable 2, Pen: Model Marker Plus and Case: Book FolioTablet SpecsSize and weight 187 x 246 x 4.7 mm Approximately 403.5 g (.88 lb) Processor 1.2 GHz dual core ARM Storage and RAM 1 GB LPDDR3 SDRAM 8 GB internal storage Second-generation CANVAS display 10.3” monochrome digital paper display (no colors) 1872 x 1404 resolution (226 DPI) Partially powered by E Ink Carta technology Multi-point capacitive touch Marker No charging, setup, or pairing required Special high-friction pen tip Tilt detection 4096 levels of pressure sensitivity Connectivity Wi-Fi 2.4GHz and 5GHz USB-C Accessory port Battery Rechargeable (Li-ion) battery USB-C charging 3000 mAh Operating system Codex — A purposely designed Linux-based operating system for low-latency digital paper displays Document support PDF and ePUB Other Menu language: English only Note and file syncing between reMarkable tablet and reMarkable apps for MacOS, Windows 10, iOS, and Android Handwriting Conversion feature powered by

More opportunities from Alabama → IT - Tech Report

Same awarding agency

NAICS: 519290
New
SLED
REQ #270010- Westlaw Print Renewal
Solicitation # SRC0000037678
This subscription agreement for Westlaw computer services and hard copy legal publications, specifically updates to the Code of Alabama, covers the term from October 1, 2026, through September 9, 30, 2027. The service includes on-demand online access and periodic print deliveries, both utilizing the Key Numbers system. While pricing is structured on a monthly basis, the total contract cost, including any subsequent renewals, is capped at 25,000 dollars. The contract allows for annual renewals by mutual written agreement, with a maximum total duration of five years from the effective date. Administered by the State of Alabama, the contract is governed by the Quick Quote Standard Boilerplate and incorporates the Department of Finance Administrative Code and the Code of Alabama 1975. Key legal stipulations include the requirement for E-Verify enrollment, registration of foreign corporations with the Alabama Secretary of State, and a sales tax exemption under Section 40-23-4 (a)(11). The State maintains the right to inspect all products before acceptance per the Universal Commerce Code, and any monetary disputes are subject to the sole remedy of filing a claim with the Board of Adjustment of the State of Alabama. Payments must be accepted via electronic methods, such as P-cards or EFT, at no additional cost to the State.
Web Search Portals and All Other Information Services

POSTED

2 days ago

DEADLINE

in 1 day
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS