Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Vermont was posted on June 17, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Request for Bid - Hands Mill Dam Removal and Floodplain Restoration

Closed
61302State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between $80,000,000 and $100,000,000, with a solicitation expected around March 15, 2027. Construction is scheduled to begin in September 2027 and last approximately two years, spanning two dredging seasons from September 1, 2027, to August 31, 2029. The work is divided into two primary sequences: the construction of a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, including an access channel, and the subsequent maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth. The total scope involves mechanically dredging approximately 5,500,000 cubic yards of material using closed clamshell buckets. Specifically, 3,200,000 cubic yards will be removed to create the CAD cell, with material placed at Port Edgewood Basin, Fox Point Reach CAD cells, Prudence Island, and the Rhode Island Sound Disposal Site. The remaining 2,300,000 cubic yards of maintenance material will be placed within the newly constructed Edgewood Shoals North CAD cell. To meet strict environmental windows and project timelines, the contractor must maintain a production rate of at least 300,000 cubic yards every 30 calendar days, operating 24 hours a day, 7 days a week. Interested firms must submit a capabilities package by November 26, 2026, demonstrating experience with these production rates and open water placement in New England during winter months.
W2SD Endist New England

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica Public Works Engineering Division. The project involves comprehensive upgrades and improvements to the San Vicente and Mt. Olivette reservoirs, with an estimated contract value of $27,344,000. Bidders are required to hold a Class A General Engineering license. The scope of work includes civil, structural, and electrical improvements, such as the installation of flexible expansion joints, meter and valve vaults, and concrete-lined swales, as well as cathodic corrosion protection and SCADA integration. The contract specifies a performance period of 730 calendar days, though the sample contract mentions substantial completion within 520 calendar days from the Notice to Proceed. Bids must be submitted electronically via the OpenGov portal by November 5, 2026, at 3:00 pm. Key requirements include the provision of Labor and Material Payment and Performance Bonds for 100% of the contract sum, compliance with prevailing wages, and adherence to the Santa Monica Living Wage Ordinance. Liquidated damages for delays are set at $13,200 per day. The project is subject to rigorous inspection standards, including ASTM and CBC requirements, with the Prime Contractor responsible for contracting and billing Enterprise Automation for specific integration services.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 15 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

Stone Environmental, Inc. and the Winooski Natural Resources Conservation District are soliciting bids for the removal of the Hands Mill Dam and the restoration of floodplain areas along the Jail Branch in Washington, Vermont. The project involves the complete removal of the existing concrete and rock dam, which was breached in July 2023, as well as the removal of remaining impounded sediment. Key activities include channel realignment, floodplain creation, site stabilization through planting and mulching, riverbank and toe stabilization, and the installation of rootwad structures to enhance stream and floodplain restoration along two tributaries, the East Branch and an unnamed tributary. A pre-bid meeting is scheduled on-site for June 21, 2024, at 2 pm, and interested bidders are encouraged to attend, though attendance is not mandatory. Bidders must request the contract drawings and bid form via email to Branden Martin, PE, and submit their responses by July 3, 2024. The project is estimated to cost between $500,000 and $1,500,000, and the solicitation is managed under NAICS code 237990, focusing on heavy and civil engineering construction within Vermont.

General Info

Agency

Vermont → Stone Environmental Inc.

Place of Performance

VT, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Stone Environmental Inc.
Contacts1 person available
OfficeN/A
Organization / Agency
Vermont → Stone Environmental Inc.
Office AddressN/A
Contacts

Full Description

Show more
Stone Environmental, Inc. (Stone) and Winooski Natural Resources Conservation District (WNRCD) is requesting bids for the Hands Mill Dam Removal and Floodplain Restoration at the Jail Branch in Washington, Vermont. Please find the Instructions to Bidders attached. There will be a pre-bid meeting held on site Friday, June 21, at 2pm. Please Email Branden Martin, PE to be in receipt of the Contract Drawings and Bid Form. Please also indicate whether you will attend the pre-bid meeting. Attendance of the pre-bid meeting is not a requirement to qualify a prospective bidder, but it is recommended that prospective bidders attend. The Hands Mill dam breached in July, 2023, but much of the dam and impounded sediment remain. Work includes removal of the concrete and rock/boulder dam, channel realignment and restoration, impounded sediment removal, floodplain creation, site stabilization (plantings, seed, mulch, etc.), riverbank and toe stabilization, installation of rootwad structures, and stream and floodplain restoration along two tributaries to the Jail Branch (East Branch and Unnnamed Tributary)

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS