This Sources Sought opportunity from Department Of Defense was posted on December 18, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

REQUEST FOR INFORMATION: INSTALLATION OF STEAM GENERATOR

Closed
12182024Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 335312
New
DIBBS
RECTIFIER, METALLIC
Solicitation # SPE7L4-27-T-0458
Solicitation SPE7L4-27-T-0458 is a Request for Quotations issued by the DLA Weapons Support LSO Combat Vehicles and Armament for the procurement of three metallic rectifiers, identified by NSN 6130-01-180-8388. The requirement is classified under NAICS code 335312. Key delivery milestones include a need ship date of March 3, 2026, and an original required delivery date of May 2, 2026, with a delivery window of 84 days after receipt of order. Shipping is designated as FOB Origin, with the final destination being DLA Distribution San Joaquin in Tracy, California. The contract mandates strict adherence to MIL-STD-2073-1E for packaging and MIL-STD-129 for marking, alongside DLA packaging requirements RP001. Technical and quality standards are governed by the DLA Master List of Technical and Quality Requirements. Notably, the contract prohibits the intentional addition of mercury or mercury-containing compounds unless specifically exempted for functional use. Administrative requirements include the use of the Wide Area WorkFlow system for electronic invoicing and payment. Compliance with various FAR and DFARS clauses is required, including the Buy American Act, cybersecurity safeguarding under DFARS 252.204-7012, and the prohibition of covered defense telecommunications equipment. Quotations are due by October 30, 2026.
DLA WEAPONS SUPPORT LSO COMBAT VEHICLES AND ARMAMENT

POSTED

about 24 hours ago

DEADLINE

in 10 days

General Info

Agency

Department Of Defense → FA9300 Aftc Pzr

NAICS

335312 - Motor and Generator Manufacturing

Place of Performance

Edwards, CA, 93524, USA

Set-Aside

NONE

Documents

4

AFRL Area 1-42 Steam Generator Statement of Work

PDF, High priority: read this firstsow
High

RFI - Steam Generator Installation at Area 1-42

PDF, High priority: read this firstrfi
High

SOW New Steam Generator Installation at Area 1-42

PDF, High priority: read this firstsow
High

AFRL Visitor Pre-Announcement Notification

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA9300 Aftc Pzr
Contacts2 people available
OfficeEDWARDS AFB, CA, 93524-1185, USA
Organization / Agency
Department Of Defense → FA9300 Aftc Pzr
Office AddressEDWARDS AFB, CA, 93524-1185, USA
Contacts
Suzanna Kussman
Tyler Pittmon

Full Description

Show more
REQUEST FOR INFORMATION (RFI) - Steam Generator Installation at Area 1-42 This Request for Information (RFI) is issued as market research. All requirements identified in this RFI are tentative and will be finalized prior to the release of any request for proposal (RFP). This RFI is for planning purposes only and shall not be considered a request for proposal (RFP), request for quote (RFQ), or as an obligation on the part of the Government to acquire any products or services. The information provided may be utilized by the Air Force Research Laboratory (AFRL) in developing its acquisition strategy should a decision be made to proceed with acquiring the items/services listed in this RFI. The information received in response to this RFI may be included in one or more future solicitations. No reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow-up information requests. The purpose of this RFI is to gain knowledge of potentially qualified sources and their size classifications (Small Business, Large Business, Etc.). The information provided is entirely voluntary and will not impact the ability to bid on future requirements. Requested Information. The Government requests interested offerors who believe they can fully support this requirement furnish the following information: 1. Company name, CAGE Code and UEI number, address, points of contact, phone numbers and e-mail addresses. 2. Information should include a brief description of experience in providing the type of support described in the requirements. The information package must be clear, concise, and complete. The Air Force is under no obligation to provide feedback to the company, or to contact the company for clarification of any information submitted in response to this request. 3. Identification of business size (small or large) and identify the socioeconomic disadvantaged category, as defined the Federal Acquisition Regulation FAR Part 19 and also currently listed in the System for Award Management (SAM). Small business size standards are published by the U.S. Small Business Administration (SBA) and may be found at www.sba.gov/size/sizetable2002.html. The potential North American Industry Classification System (NAICS) codes assigned to this procurement is 335312 - Motor and Generator Manufacturing and the Small Business Size Standard is 1,250 employees. The potential Product Service Code assigned to this procurement is 6115 - Generators and Generator Sets. 4. Details regarding the requirements your company is able to provide and any applicable restrictions. 5. An Industry Day will be held 22 January 2025 for interested contractors to view the site. If you would like to participate, please complete the document entitled - AFRL Visitor Pre-Announcement for each individual who will attend in order to gain access to Edwards Air Force Base. - REQUIREMENTS - Steam Generator Installation *** Please review BOTH attached Statement of Work documents for complete requirement information. Please note the document titled Single Steam Generator-SOW covers the specifications for the current requirement of the single steam generator, while the document titled Complete Steam Generator Project-SOW is for the entire anticipated project. The contractor shall reference and work the documents together to understand the scope of work. *** The Government is seeking to identify qualified, experienced, and interested firms, who can perform in accordance with the requirements described in the attached Statement(s) of Work for the installation of one (1) Steam Generator which will be used to replace an aging steam generation system in use at AREA 1-42 that includes large spherical saturated steam storage vessels, heat exchangers, process heaters, pumps, supply and return piping and other hardware to generate and provide the required mass quantity of steam at specified pressure and temperature. The intent of this project is for the Contractor to provide the Air Force Project Manager one (1) safe, complete, fully functional and operable steam generator to be used to supply saturated steam for the AFRL Area 1-42 Steam Plant. NOTE: The Air Force is planning to install a total of three (3) identical steam generators, starting with the single generator being acquired with this requirement and the other two (2) steam generators which will be installed as part of the overall system in the future. The scope of work for this acquisition includes ONLY the first, single steam generator at this time. The Air Force Project Manager has made a good faith effort to update all relative project documents to address the inclusion of ONLY the single steam generator and clearly identify other two (2) steam generators are intended for installation in the future but are NOT included as part of the current scope of work. Likewise, the Air Force Project Manager has endeavored to identify interface points on piping, platforms, conduit and other systems where connections to provide service to the future steam generators will be required. If the Contractor identifies ANY scope, interfaces or other items that are not clear as to the intent of what is to be included in the current scope of work and what is intended future installation, the Contractor shall bring this to the attention of the Air Force Project Manager immediately. Technical Requirements: Built in accordance with ASME B&PVC Section I, 2023 Volume: Approx. 12,400 cubic feet Pressure: Maximum Working Pressure: 600 psi; Maximum design pressure: 620 psi Temperature: Maximum working temperature: 500F Steam Generation and Pressure: 110 lbm/sec @ initial temperature 500F for 12 min total o Yields 79,200 lbs of steam at ~600 PSIG Minimum Pressure after release is 100 PSIG Minimum 3 runs before make-up water is required Steam reheats at maximum 20 hrs The steam generator shall be designed, fabricated, tested, inspected and stamped in accordance with the requirements of the ASME B&PVC Section I, Rules for Construction of Power Boilers, Latest Edition. The steam generator shall be stamped with an ASME B&PVC Section I. - ASME and - S Certification mark as noted in PG-105 of ASME B&PVC Section I. The Contractor shall be authorized by ASME to perform the identified code construction and shall have the appropriate - S stamp. The steam generator shall be a fire tube type boiler and meet requirements for the same. The Contractor shall provide a Manufacturer's Data Report Form, Form P-2 for the steam generator. All required documentation, including, but not limited to, calculations, welding certifications, non-destructive testing (NDE) records, Certified Material Test Reports (CMTRs), pressure testing, Master Data Report Form and all other documentation as required by ASME B&PVC Section I for the design, fabrication, welding, inspection, NDE, testing and any other activities shall be furnished as part of the code package for the steam generator. The steam generator shall meet the requirements of ASME B&PVC Section I, Part PG General Requirements for all Methods of Construction, Part PW Requirements for Boiler Fabricated by Welding, PFT Requirements for Fire Tube Boilers. The Contractor shall determine, depending on the specific design and methods selected to design and fabricate the steam generator, other parts and appendices of ASME B&PVC Section I that are applicable to the scope of this project. All pressure boundary materials used in the fabrication of the steam generator shall be provided with Certified Material Test Reports (CMTRs) as required in ASME B&PVC Section II. All pressure boundary materials shall be clearly stamped or otherwise marked with the corresponding heat number from the CMTR. Any requirements for marking or stamping plates or other pressure boundary materials identified in ASME B&PVC Section I that are in addition to any marking or identification of materials noted in ASME B&PVC Section II shall be met. The Contractor's Quality Control Plan shall address transfer of heat numbers and traceability for individual pieces and parts cut or altered. Six Major Tasks Include: Design and Engineering Procurement of Materials, Parts, Equipment for Fabrication Fabrication of Steam Generator at AFRL Staging Area Transport and Placement of the Steam Generator Final Installation of Generator and Periphery Systems, Piping, Insulation, Blowers and other Parts and Equipment Final Acceptance Testing and Training Anticipated Period of Performance: 1 June 2025 - 31 May 2027 FOB Destination: Edwards AFB, CA 93524. Responses. AFRL is seeking U.S. sources with the capability to provide the items/services listed in this RFI. All replies are to be provided to the Contracting Officer, Tyler Pittmon tyler.pittmon@us.af.mil and Contract Specialist, Suzanna Kussman, suzanna.kussman@us.af.mil All responses to this RFI must be received NO LATER THAN 10 January 2025 at 4:00 p.m. PST.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS