Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on May 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Request for Information (RFI) for Request for Information (RFI) For B-52 Advanced Wing Weapons Pylon (AWWP)

Closed
FA8628-27-R-B001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Department of the Air Force is seeking industry input through a Request for Information to identify qualified partners capable of accelerating the Engineering and Manufacturing Development of a new Advanced Wing Weapons Pylon for the B-52 aircraft. The goal is to field a modern pylon that meets MIL-STD-1760 series standards and supports heavy weapons exceeding 5,000 pounds in capacity, addressing urgent operational requirements. The program aims to complete the EMD phase within 36 months, culminating in a Critical Design Review, followed immediately by production of 20 to 24 units, with at least 12 delivered in the first year. The Government is evaluating industry feasibility around this aggressive timeline and seeking vendors with proven expertise in designing and manufacturing high-capacity weapons carriage systems. This solicitation is open to all capable industry participants, with particular encouragement for small businesses to respond. Physical work locations may differ, and contractors must be prepared to travel as needed. Responses are due by July 6, 2026, under solicitation number FA8628-27-R-B001, issued by the Air Force Life Cycle Management Center at Wright-Patterson AFB, Ohio, with performance expected to occur in Edwards, California. Interested parties should reach out to the point of contact listed—Ashley Gray and Matthew Lesko—for further details or clarification. This RFI is designed to inform the Government’s broader acquisition strategy and does not constitute a commitment to award a contract.

General Info

Air Force seeks industry partners for B-52 weapons pylon development, production, and heavy load expertise.

Agency

Department Of Defense → FA8628 Aflcmc Wbdk B52View Agency

NAICS

336413 - Other Aircraft Parts and Auxiliary Equipment ManufacturingView NAICS

Place of Performance

Edwards, CA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8628 Aflcmc Wbdk B52
Contacts2 people available
OfficeWRIGHT PATTERSON AFB, OH, 45433-7148, USA
Organization / Agency
Department Of Defense → FA8628 Aflcmc Wbdk B52
View Agency Profile
Office AddressWRIGHT PATTERSON AFB, OH, 45433-7148, USA
Contacts

Full Description

Show more

The Department of the Air Force is issuing this Request for Information (RFI) to conduct market research and identify qualified industry partners capable of supporting an accelerated Engineering and Manufacturing Development (EMD) phase and subsequent production of a replacement external weapons release pylon for the B-52 aircraft.


To meet emerging mission needs, the Government requires a newly designed Advanced Wing Weapons Pylon (AWWP) that incorporates MIL-STD-1760 series heavy weapon capability.


The anticipated acquisition strategy targets a 36-month EMD phase culminating in a Critical Design Review (CDR). Upon successful completion of the EMD phase, the design must be ready for integration with required support equipment, transitioning immediately into the production of 20 to 24 pylons (with a minimum delivery of 12 pylons in the first year).


Key Objectives for Industry Feedback:


  • Assess the feasibility of the proposed 36-month EMD timeline to CDR and production timeline.

  • Identify vendors with the engineering expertise to design and manufacture heavy weapons carriage systems (>5,000 lbs capacity).

  • Inform the Government's overall Acquisition Strategy.


Note: Physical work locations may vary, and interested parties must be willing and able to travel. Small businesses are highly encouraged to participate and respond to this RFI.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS