Request for Information (RFI): National Park Service (NPS) Rehabilitate Marina Bulkheads at Flamingo

Closed
W912EP24Z0047Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 17 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 17 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 17 hours ago

DEADLINE

in about 13 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 17 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 22 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Homestead, FL, 33034, USA

Set-Aside

NONE

Documents

15

501904_ENPFMBR_03_Structural_08.02.2024

PDF, High priority: read this firstspecifications
High

501904_ENPFMBR_04_Mechanical_08.02.2024

PDF, High priority: read this firstspecifications
High

501904_ENPFMBR_05_Electrical_08.02.2024

PDF, High priority: read this firstspecifications
High

501904_ENPFMBR_06.1a_Resource_08.02.2024 - Bulkhead Plan Layouts

PDF, High priority: read this firstspecifications
High

Demolition Plan - Florida Bay, Whitewater Bay, and Maintenance Marina Bay

PDF, High priority: read this firstspecifications
High

Everglades National Park Flamingo Marina Bulkhead Rehabilitation - Sheet List

PDF, High priority: read this firstspecifications
High

Flamingo Marina Bulkhead Rehabilitation - Section 02 65 00 Underground Fuel System Components Removal

PDF, High priority: read this firstspecifications
High

Flamingo Marina Bulkhead Rehabilitation - Structural Metal Fabrications

PDF, High priority: read this firstspecifications
High

Market Research Technical and PLA Questionnaire

DOCX, High priority: read this first3 pages · rfi
High

Flamingo Marina Bulkhead Rehabilitation Industry Day

PDF, Low priority44 pages · industry-day
Low

Flamingo Marina Bullichead Rehabilitation Industry Day Sign-in Sheet

PDF, Low priorityindustry-day
Low

501904_ENPFMBR_01_Specifications_08.02.2024.pdf

PDF

501904_ENPFMBR_03_Specifications_08.02.2024.pdf

PDF

501904_ENPFMBR_06.1b_Resource_08.02.2024.pdf

PDF

501904_ENPFMBR_06.2_Resource_08.02.2024.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

7 updates
PhaseClosed
Posted

Sources Sought

Notice updated

Set-aside added: Total Small Business Set-Aside (FAR 19.5). The notice description changed.

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Aug 15, 2025 to Aug 15, 2024.

Notice updated

Notice type changed from Sources Sought to Special Notice. Response deadline changed from Aug 15, 2024 to Oct 4, 2024. The notice title changed. NAICS code changed from 337211 to 237990. Set-aside removed. The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Oct 4, 2024 to Nov 1, 2024. The notice description changed.

Deadline changed

Response deadline changed from Nov 1, 2024 to Nov 15, 2024.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
Contacts2 people available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA

Full Description

Show more
This announcement constitutes a Request for Information (RFI). This announcement seeks information from industry and will only be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS RFI. Respondents will not be notified of the results of the evaluation. The U.S. Army Corps of Engineers, Jacksonville District is now soliciting comments from the construction community to specifically address technical questions and potential use of Project Labor Agreements (PLAs) for this large-scale construction project for potential award in fiscal year (FY) 2025. The U.S. Army Corps of Engineers, Jacksonville District is planning an Industry Day/Site Visit event (1st quarter FY25) as a means of conducting market research to gauge the interest, capabilities, and qualifications of various members of the Construction Community, to include Small Businesses, as the Government must ensure there is adequate competition amongst the potential pool of responsible contractors. *Note: Additional information for the Industry Day/Site Visit will be available at a later time: Event Date: November 6, 2024 Event Location: Flamingo Lodge, Flamingo Marina, Everglades National Park Site Visit: Everglades National Park Event Schedule: TBD Event Registration: Please click the link below and register by November 1, 2024. https://www.eventbrite.com/e/industry-day-flamingo-marina-bulkhead-rehabilitation-tickets-1004565009987?aff=oddtdtcreator There is no solicitation currently. This request for capability information does not constitute a request for proposals and submission of any information in response to this market survey is purely voluntary. No reimbursement will be made for any costs associated with providing information in response to this Special Notice or any follow-up information requested. The Estimated Magnitude of construction is between $25,000,000 and $100,000,000. The subject project has a total estimated period of performance of 895 calendar days from the date of Notice to Proceed and commencement of work would begin within 30 calendar days of receipt of the Notice to Proceed (NTP). The applicable North American Industry Classification System (NAICS) code assigned to this procurement is 237990, Other Heavy and Civil Engineering Construction. The Small Business Size Standard for this project is $45.0 million. Project Overview: The bulkhead wall system was constructed in the 1950's to create four basins within Flamingo Marina. The four basins are known as Visitor Center Bay, Florida Bay, Whitewater Bay, and Maintenance Marina Bay. The existing bulkheads were constructed in the 1950's using pre-cast concrete panels located between soldier piles with steel tie rods anchoring the wall to creosote-treated piles which act as deadmen. The piles and panels were embedded approximately two feet below the mudline. Cast in place concrete caps were placed above the panels and piles. Sections of all the existing bulkhead caps, panels and piling show evidence of corrosion of the reinforcing steel. Cracks and spalls are visible on the top of the concrete cap and in some cases create potential tripping hazards for visitors and staff. Test pits performed, to the depth of the tie rods, at five locations during the design phase of this project did not identify any significant corrosion of the tie rods anchoring the wall nor any degradation of the tops of treated timber piling. However, based on information provided by the park personnel, USACE understands a similar bulkhead system, located at the Everglades City - Everglades National Park facility, constructed during the same era, suffered a tie-rod failure in July 2005. This failure required the emergency installation of new tie rods, anchors, and concrete cap. Based on this reported failure, it is logical to infer that some of the existing steel tie rods at the Flamingo Marina may be similarly corroded, since they are also installed within the tidal zone under similar conditions. Distortions in the pavement adjacent to the bulkheads also indicates possible bulkhead distress. To replace these bulkheads, cantilevered sheet pile will be placed approximately 22 inches in front of the existing bulkhead using the Press-In method combined with pre-auguring of sheet pile installation. The Press-In method was chosen as the installation method for the following reasons: Address the NPS concerns with vibration, noise, and contractor interactions with the various protected species found in the basins. To minimize risk of damage or failure of the existing bulkhead system due to vibration. To the address the limestone layers the sheet piles will be founded in without exposing the existing concrete panels nor soldier piles to loose material. To minimize the need to place construction loads near the existing bulkhead. The need for tight vertical and horizontal construction tolerances for the sheet piles. The Government is requesting answers to the following technical questions: 1. Can you describe your current sheet pile installation equipment types and if the equipment can meet the Press-In method of installation requirements? 2. The sheet pile will require significant embedment into a hard limestone layer. We are requiring pre-auguring to break up the limestone and allow for sheet pile placement; however, the existing bulkhead panels and soldier piles are near the auguring and embedded into the same limerock layer. To minimize the risk of failure of the existing bulkhead during the auguring process, positioning of the auguring system and minimizing the time between the auguring of the rock and placement of the sheet pile will be important. Can you explain how and what type of equipment you would use to accomplish the pre-auguring? 3. The area between the new sheet pile and the existing bulkhead will be filled with CLSM, in sections, and lifts, the ends of each segment will need seals placed to prevent the CLSM from flowing into the basin. Can you explain your approach to sealing the segments to allow for CLSM to be placed? 4. As the CLSM is placed, turbid water will be displaced, if turbidity barriers do not provide sufficient protection, how would you propose meeting the turbidity requirements? 5. Do you believe baker tanks and or filtering equipment will be required to treat the displaced water if the turbidity requirements cannot be maintained? 6. For architectural and corrosion prevention reasons a precast fa'ade is to be mounted in front of the sheet pile. This precast concrete fa'ade will extend from the top of the wall to below the mean low water elevation. The gap remaining between the fa'ade panel and the sheet pile is to be filled with CLSM, how would you seal this gap at the bottom and sides to prevent CLSM from flowing into the basin? 7. As stated above, the vertical and horizontal tolerances associated with the sheet pile placement are tight to allow for fa'ade panel placement and maintain the architectural look of the bulkhead. Can you explain how you propose to maintain these tolerances throughout sheet pile placement? 8. Several outfall pipes will penetrate the existing wall. These outfall pipe will need to be extended through both the new sheet pile and the concrete fa'ade panels; can you describe how you would accomplish this? 9. Various protected and potentially dangerous species and fauna populate the project site. Can you describe any experience you have working in highly environmentally sensitive areas and how you will handle the environmental restrictions that are required by this project? A Project Labor Agreement (PLA) is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement as described in 29 U.S.C. 158 (f). Effective January 22, 2024, Final Rule (FAR Case 2022-003), implements Executive Order (E.O.) 14063, Use of PLAs for Federal Construction Projects, which requires the use of PLAs in large-scale (defined as $35 million or more) Federal construction projects within the United States. Contractors and subcontractors working on large-scale construction projects must negotiate or become party to a PLA with one or more labor organizations unless an exception is granted. This requirement applies to new solicitations, including task or delivery orders, issued on or after January 22, 2024. The Government is seeking information from both unionized and non-unionized contractors, as well as contractors familiar with the federal marketplace as well as new entrants, that may be interested in participating in competition for this procurement. Reference is made to: FAR Subpart 22.5 Use of Project Labor Agreements for Federal Construction Projects; provision, FAR 52.222-33 Notice of Requirement for Project Labor Agreement; and to clause, FAR 52.222-34 Project Labor Agreement. In consideration of the above factors and any others which may be deemed appropriate, the construction community is invited to comment on the use of PLA's as part of the Government's market research. The Government is requesting responses to the following questions: 1. Do you have knowledge that a PLA has been used in the local area on projects of this kind? If so, please provide supporting documentation. Project Name and Location Detailed Project Description Initial Cost Estimate vs. Actual Final Cost Was the project completed on time? Number of craft trades present on the project Were there any challenges experienced during the project? 2. Are you aware and/or are there concerns by the prime contractors of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project? If so, please elaborate and provide supporting documentation. Information may reference current apprenticeship statistics and workforce age demographics. 3. Are you aware of time sensitive issues/scheduling requirements where use of the PLA would affect the rate at which the referenced project would be completed? If so, please elaborate and provide supporting documentation. 4. Are you aware of any cost impact where the use of PLA will affect the construction cost of the referenced project? If so, please elaborate and provide supporting documentation. 5. Based on FAR 52.222-33 and alternates and 52.222-34 and alternates do you see any negative and/or positive impacts of submitting the PLA at one phase of the procurement process over another? If so, please explain. Also, provide an estimated and realistic timeframe that your company will be able to finalize a PLA. 6. Identify specific reasons why or how you believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement. 7. Identify specific reasons why you do not believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement. 8. Identify any additional information with supporting documentation/statistics that you believe should be considered on the use of a PLA on the referenced project. 9. Identify any additional information with supporting documentation/statistics that you believe should be considered on the non-use of a PLA on the referenced project. 10. Is your firm a serious interested party in that you intend to submit a proposal for this procurement? Will the use of a PLA impact your ability to bid? If so, please explain? All responses to this RFI will be evaluated and used in determining acquisition strategy. Submission Instructions: Serious interested parties who consider themselves qualified to perform the above-listed project are invited to submit your response on company letterhead no later than October 4, 2024, at 5:00PM, EST. For more information, please see the company letterhead template to submit technical questions and PLA's questions. All responses for under this notice shall be sent via email to Nicole Batista-Cruz at Nicole.M.Batista-Cruz@usace.army.mil and William Wallace at William.J.Wallace@usace.army.mil. INSTRUCTIONS FOR TECHNICAL INQUIRIES AND QUESTIONS (SPECIFICATIONS AND DRAWINGS). Technical inquiries and questions relating to the project specifications and drawings must be submitted through a Bidder Inquiry using ProjNet (https://www.projnet.org). All answers will be made available through ProjNet and will also be posted on the Sam.gov website in the form of a report generated from ProjNet. To facilitate the projects fast-paced schedule, we would appreciate your questions and feedback be submitted by 5:00 pm, EST on October 4, 2024. The Bidder Inquiry Key is: 7X5BME-F6IWN6 Specific Instructions for ProjNet Bid Inquiry Access from ProjNet home page: 1. Identify the Agency. This should be marked as USACE. 2. Email. Enter the email address you would like to use for communication. 3. Key. Enter the Bidder Inquiry Key listed above. 4. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form. 5. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system. 6. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 237990
New
Federal
Palm Beach Harbor, South Jetty Rehabilitation 2026, Palm Beach County, Florida
Solicitation # W912EP26BA019
The US Army Corps of Engineers, Jacksonville District, is soliciting bids for the rehabilitation of the South Jetty at Palm Beach Harbor in Palm Beach County, Florida. This firm-fixed-price construction project, identified by solicitation number W912EP26BA019, has an estimated magnitude between $1,000,000 and $5,000,000. The scope of work involves substantial manipulation of new and existing stones to achieve required interlocking and the execution of concrete repairs. All mobilization and construction activities must be water-based using marine construction methods and equipment, as land-based access to the project site is strictly prohibited. The project has an estimated period of performance of 330 calendar days following the Notice to Proceed, which includes 60 days to commence work. Critical environmental and safety requirements include a mandatory pre-construction benthic community survey and the relocation of corals by Florida Fish and Wildlife Conservation Commission qualified contractors prior to the start of jetty work. The project adheres to EM 385-1-1 safety standards and requires the use of Coast Guard-certified equipment. Contractual terms include liquidated damages of $2,818 per calendar day of delay and a bid guarantee of 20 percent of the bid price or $3,000,000, whichever is less. This unrestricted procurement falls under NAICS code 237990, and all eligible offerors must be registered in the System for Award Management.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS