Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on June 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Request for Information (RFI) / Sources Sought Notice Product Support and Sustainment Integration for Air Base Air Defense for Missile Defense (ABAD MD) System

Closed
FA8612Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Department of the Air Force is seeking industry input to support the sustained operation and modernization of the Air Base Air Defense for Missile Defense system, a critical, actively deployed Command and Control platform built on Tactical Operations Center – Light hardware. Current operations rely on proprietary software components from Lockheed Martin, including UCI Blaster, PIPES, UCI Blaster Manager, NKE Emulator, and Screen Watchdog/BIF Hub, for which the government does not possess source code. The program’s dual objective is to maintain uninterrupted operational readiness and cybersecurity posture for the existing legacy system while transitioning over 12 to 24 months to an open-architecture future using non-proprietary, standards-based software that eliminates vendor lock-in without degrading performance. This effort requires seamless sustainment across 15 deployed units in CONUS and OCONUS locations, supported by two 24/7/365 regional hubs handling an average of 70 sustainment tickets monthly, with strict requirements for patching across all vulnerability severities. Potential contractors must demonstrate proven ability to operate global product support hubs, deploy cleared Field Service Representatives, and manage mission-critical cybersecurity obligations, including maintaining Authority to Operate without disruption during modernization. The government will provide Interface Control Documents, hardware and software test-beds, and Risk Management Framework documentation to facilitate transition planning, but respondents must detail any additional technical data or APIs needed. Submission requirements include a comprehensive capabilities statement addressing OSA migration strategy, UCI message integration experience, continuous ATO maintenance, patch management during transition, workforce readiness with Top Secret/SCI and SAP clearances, and DoD 8140.03-certified personnel. All responses must be received by the specified deadline and are considered government property; proprietary information must be clearly marked to receive any protection, with respondents bearing full responsibility for safeguarding unmarked data. This RFI is for market research only and does not obligate the government to issue a future contract.

General Info

Seeking contractors to sustain and modernize Air Base Air Defense system with open-standard software while maintaining 24/7 operations and cybersecurity.

Agency

Department Of Defense → FA8612 Aflcmc C3BM C3View Agency

NAICS

N/A

Place of Performance

Dayton, OH, 45433, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8612 Aflcmc C3BM C3
Contacts2 people available
OfficeDAYTON, OH, 45434-7104, USA
Organization / Agency
Department Of Defense → FA8612 Aflcmc C3BM C3
View Agency Profile
Office AddressDAYTON, OH, 45434-7104, USA
Contacts
Christine Basham
Veronica Schoultz

Full Description

Show more

1.0 Introduction and Purpose 
The Department of the Air Force (DAF) is conducting market research to identify parties with the requisite capabilities, resources, and experience to provide comprehensive product support and sustainment integration for the Air Base Air Defense for Missile Defense (ABAD MD) System.  


This RFI is issued solely for information and planning purposes and does not constitute a Request for Proposal (RFP) or a promise to issue an RFP in the future. This request for information does not commit the Government to contract for any supply or service whatsoever. 


2.0 Background and Operational Posture 
The ABAD MD system is a critical, actively deployed capability for air base defense. The program is executing Phase 5, which focuses on the sustainment of currently fielded systems operating in active defense postures. Leveraging Tactical Operations Center – Light (TOC-L) hardware, these Command and Control (C2) systems are deployed in support of immediate warfighter operations. 


Historically, this system has relied on proprietary Original Equipment Manufacturer (OEM) software. The Government’s objective for the next phase of this program is twofold: 


  1. Maintain strict, uninterrupted operational readiness and cybersecurity posture for the actively fielded legacy baseline. 


  1. Execute a deliberate, phased modernization effort to replace proprietary components with open-standard, non-proprietary software, eliminating vendor lock without degrading current capabilities. 


3.0 Scope of Work and Phased Approach 
The contractor shall be responsible for activities ensuring successful continuous sustainment and modernization of the ABAD MD system. The Government anticipates the following: 


  • Core Sustainment Operations: Full assumption of ABAD MD and TOC-L Product Support Hubs, Tier I-III help desk operations, provision of cleared Field Service Representatives (FSRs) to active sites, and routine cybersecurity patching/Information Assurance Vulnerability Alerts (IAVAs). 


4.0 System Constraints and Available GFI/GFP 
The ABAD MD system’s current operational baseline relies on integrated software components proprietary to Lockheed Martin. The Government does not possess source code for these specific components: 


  • UCI Blaster: Universal Command and Control Interface (UCI) formatting/routing software. 


  • PIPES: UCI Message translation utility. 


  • UCI Blaster Manager: Management interface for UCI routing. 


  • NKE Emulator: System emulation capability. 


  • Screen Watchdog / BIF Hub: System monitoring and screen recording functionalities. 


4.1 Available Government Furnished Information/Property (GFI/GFP): 
To facilitate a competitive transition and support the OSA migration, the Government intends to provide the awardee with: 


  • System Interface Control Documents (ICDs) defining the inputs/outputs of the proprietary components listed above. 


  • Full access to ABAD MD TOC-L hardware baselines and software test-beds (SIL/ITF). 


  • The existing Risk Management Framework (RMF) package and system architecture diagrams. 


5.0 Operational Metrics and Scale 
To assist industry in formulating realistic responses and transition plans, the following program metrics are provided for context: 


  • Multiple Fielded Systems: (PLANNING NUMBERS ESTIMATED) 


15 units deployed across CONUS (account for one across country) OCONUS (PACAF & USAFE) 


  • Support Hubs:  


  • Two (1) Regional Support Hubs requiring 24/7/365 coverage. 


  • Ticket Resolution Time: Average trouble ticket resolutions from highest to lowest response: 10 Level I/ 20 Level II/ 40 Level III sustainment tickets per month, degraded to interoperable full-mission status 


  • Cybersecurity: Contractor shall support patching cadence from LOW through EMERGENCY vulnerability severity  


1.0 Introduction and Purpose 
The Department of the Air Force (DAF) is conducting market research to identify parties with the requisite capabilities, resources, and experience to provide comprehensive product support and sustainment integration for the Air Base Air Defense for Missile Defense (ABAD MD) System.  


This RFI is issued solely for information and planning purposes and does not constitute a Request for Proposal (RFP) or a promise to issue an RFP in the future. This request for information does not commit the Government to contract for any supply or service whatsoever. 


2.0 Background and Operational Posture 
The ABAD MD system is a critical, actively deployed capability for air base defense. The program is executing Phase 5, which focuses on the sustainment of currently fielded systems operating in active defense postures. Leveraging Tactical Operations Center – Light (TOC-L) hardware, these Command and Control (C2) systems are deployed in support of immediate warfighter operations. 


Historically, this system has relied on proprietary Original Equipment Manufacturer (OEM) software. The Government’s objective for the next phase of this program is twofold: 


  1. Maintain strict, uninterrupted operational readiness and cybersecurity posture for the actively fielded legacy baseline. 


  1. Execute a deliberate, phased modernization effort to replace proprietary components with open-standard, non-proprietary software, eliminating vendor lock without degrading current capabilities. 


3.0 Scope of Work and Phased Approach 
The contractor shall be responsible for activities ensuring successful continuous sustainment and modernization of the ABAD MD system. The Government anticipates the following: 


  • Core Sustainment Operations: Full assumption of ABAD MD and TOC-L Product Support Hubs, Tier I-III help desk operations, provision of cleared Field Service Representatives (FSRs) to active sites, and routine cybersecurity patching/Information Assurance Vulnerability Alerts (IAVAs). 


4.0 System Constraints and Available GFI/GFP 
The ABAD MD system’s current operational baseline relies on integrated software components proprietary to Lockheed Martin. The Government does not possess source code for these specific components: 


  • UCI Blaster: Universal Command and Control Interface (UCI) formatting/routing software. 


  • PIPES: UCI Message translation utility. 


  • UCI Blaster Manager: Management interface for UCI routing. 


  • NKE Emulator: System emulation capability. 


  • Screen Watchdog / BIF Hub: System monitoring and screen recording functionalities. 


4.1 Available Government Furnished Information/Property (GFI/GFP): 
To facilitate a competitive transition and support the OSA migration, the Government intends to provide the awardee with: 


  • System Interface Control Documents (ICDs) defining the inputs/outputs of the proprietary components listed above. 


  • Full access to ABAD MD TOC-L hardware baselines and software test-beds (SIL/ITF). 


  • The existing Risk Management Framework (RMF) package and system architecture diagrams. 


5.0 Operational Metrics and Scale 
To assist industry in formulating realistic responses and transition plans, the following program metrics are provided for context: 


  • Multiple Fielded Systems: (PLANNING NUMBERS ESTIMATED) 


15 units deployed across CONUS (account for one across country) OCONUS (PACAF & USAFE) 


  • Support Hubs:  


  • Two (1) Regional Support Hubs requiring 24/7/365 coverage. 


  • Ticket Resolution Time: Average trouble ticket resolutions from highest to lowest response: 10 Level I/ 20 Level II/ 40 Level III sustainment tickets per month, degraded to interoperable full-mission status 


  • Cybersecurity: Contractor shall support patching cadence from LOW through EMERGENCY vulnerability severity  


6.0 Information Requested from Interested Parties (Capabilities Statement) 
To assess industry capability to execute a secure transition, sustain the legacy baseline, and engineer an open-architecture future, interested parties must provide a capabilities statement that directly addresses the following areas: 


Evaluation Area 


Requested Vendor Response & Strategy Details 


1. Open Systems Architecture (OSA) Migration Plan 


Modernization Strategy: Provide a technical concept for replacing the proprietary components listed in Section 4.0 (e.g., UCI Blaster, PIPES) with open-standard, non-proprietary software over a 12-to-24-month period. 


UCI Integration:  


Describe your firm’s specific experience integrating and translating Universal Command and Control Interface (UCI) messages across disparate C2 sensors and effectors. 


2. Risk Management Framework (RMF) & Cyber Security 


Continuous ATO: Describe your approach to achieving and maintaining an Authority to Operate (ATO) for newly developed open-architecture components without disrupting the operational ATO of the actively deployed legacy baseline.  


Patch Management: How will your firm manage Information Assurance Vulnerability Alerts (IAVAs) and routine patching during the transition phase before fully replacing the proprietary software? 


3. Government Furnished Information (GFI) Needs 


Required Government Support: Based on the GFI listed in Section 4.1, explicitly list any additional GFI, Application Programming Interfaces (APIs), or technical data your firm would require from the Government to successfully execute your proposed transition and migration plans. 


4. Global Field Support & Help Desk Operations 


Sustainment Operations: Summarize your corporate experience operating 24/7/365 Product Support Hubs and dispatching Field Service Representatives (FSRs) for complex, actively fielded Command and Control (C2) systems. Incumbent Capture: Briefly describe your strategy for recruiting, clearing, and transitioning incumbent personnel to maintain continuity of tactical knowledge. 


5. Clearances & Personnel Qualification 


Workforce Readiness: Verify your firm’s ability to staff and maintain personnel with Top Secret/Sensitive Compartmented Information (TS/SCI) clearances, Special Access Program (SAP) eligibility, and DoD 8140.03 (DCWF) compliant cybersecurity certifications within the transition window. 



Evaluation Area Box


Requested Vendor Response & Strategy Details 


-Open Systems Architecture (OSA) Migration Plan 


Modernization Strategy: Provide a technical concept for replacing the proprietary components listed in Section 4.0 (e.g., UCI Blaster, PIPES) with open-standard, non-proprietary software over a 12-to-24-month period. 


UCI Integration:  


Describe your firm’s specific experience integrating and translating Universal Command and Control Interface (UCI) messages across disparate C2 sensors and effectors. 


-Risk Management Framework (RMF) & Cyber Security 


Continuous ATO: Describe your approach to achieving and maintaining an Authority to Operate (ATO) for newly developed open-architecture components without disrupting the operational ATO of the actively deployed legacy baseline.  


Patch Management: How will your firm manage Information Assurance Vulnerability Alerts (IAVAs) and routine patching during the transition phase before fully replacing the proprietary software? 


- Government Furnished Information (GFI) Needs 


Required Government Support: Based on the GFI listed in Section 4.1, explicitly list any additional GFI, Application Programming Interfaces (APIs), or technical data your firm would require from the Government to successfully execute your proposed transition and migration plans. 


- Global Field Support & Help Desk Operations 


Sustainment Operations: Summarize your corporate experience operating 24/7/365 Product Support Hubs and dispatching Field Service Representatives (FSRs) for complex, actively fielded Command and Control (C2) systems. Incumbent Capture: Briefly describe your strategy for recruiting, clearing, and transitioning incumbent personnel to maintain continuity of tactical knowledge. 


- Clearances & Personnel Qualification 


Workforce Readiness: Verify your firm’s ability to staff and maintain personnel with Top Secret/Sensitive Compartmented Information (TS/SCI) clearances, Special Access Program (SAP) eligibility, and DoD 8140.03 (DCWF) compliant cybersecurity certifications within the transition window. 




6.0 Information Requested from Interested Parties (Capabilities Statement) 
To assess industry capability to execute a secure transition, sustain the legacy baseline, and engineer an open-architecture future, interested parties must provide a capabilities statement that directly addresses the following areas: 


Evaluation Area 


Requested Vendor Response & Strategy Details 


1. Open Systems Architecture (OSA) Migration Plan 


Modernization Strategy: Provide a technical concept for replacing the proprietary components listed in Section 4.0 (e.g., UCI Blaster, PIPES) with open-standard, non-proprietary software over a 12-to-24-month period. 


UCI Integration:  


Describe your firm’s specific experience integrating and translating Universal Command and Control Interface (UCI) messages across disparate C2 sensors and effectors. 


2. Risk Management Framework (RMF) & Cyber Security 


Continuous ATO: Describe your approach to achieving and maintaining an Authority to Operate (ATO) for newly developed open-architecture components without disrupting the operational ATO of the actively deployed legacy baseline.  


Patch Management: How will your firm manage Information Assurance Vulnerability Alerts (IAVAs) and routine patching during the transition phase before fully replacing the proprietary software? 


3. Government Furnished Information (GFI) Needs 


Required Government Support: Based on the GFI listed in Section 4.1, explicitly list any additional GFI, Application Programming Interfaces (APIs), or technical data your firm would require from the Government to successfully execute your proposed transition and migration plans. 


4. Global Field Support & Help Desk Operations 


Sustainment Operations: Summarize your corporate experience operating 24/7/365 Product Support Hubs and dispatching Field Service Representatives (FSRs) for complex, actively fielded Command and Control (C2) systems. Incumbent Capture: Briefly describe your strategy for recruiting, clearing, and transitioning incumbent personnel to maintain continuity of tactical knowledge. 


5. Clearances & Personnel Qualification 


Workforce Readiness: Verify your firm’s ability to staff and maintain personnel with Top Secret/Sensitive Compartmented Information (TS/SCI) clearances, Special Access Program (SAP) eligibility, and DoD 8140.03 (DCWF) compliant cybersecurity certifications within the transition window. 


  


7.0 Submission Instructions 
Respondents are advised that all submissions become Government property and will not be returned. If a respondent submits proprietary, business-sensitive, or otherwise confidential trade secret information, it must be clearly and distinctly marked on a page-by-page basis. The Government will take reasonable precautions to safeguard properly marked proprietary data in accordance with applicable acquisition regulations. However, the Government assumes no liability for the loss, mishandling, or unauthorized disclosure of any proprietary information or materials that are not explicitly and properly marked, or that are submitted voluntarily in response to this notice. Respondents are solely responsible for adequately marking and protecting their intellectual property prior to submission. 

More opportunities from Department Of Defense → FA8612 Aflcmc C3BM C3

Same awarding agency

NAICS: 541715
Federal
DAF Battle Network "Megatron" MAC IDIQ
Solicitation # FA861227RB001
The DAF Battle Network (DBN) Megatron MAC IDIQ is a hybrid supply and service contract vehicle designed to support the Department of the Air Force's Portfolio Acquisition Executive Command, Control, Communications, and Battle Management (PAE C3BM) requirements. This decentralized Multiple Award Contract (MAC) will allow various DAF program offices and Department of the Air Force agencies to procure mission-critical capabilities, including digital architecture, sensor integration, secure processing, connectivity, applications, and synthetic environment development. The vehicle will feature both a small business pool and an unrestricted pool of awardees to ensure a competitive and agile framework for delivering resilient decision advantage across USAF and USSF C3 programs. The program is currently in the market research and acquisition planning phase, with the government seeking industry feedback on a draft Statement of Work (SOW) by September 30, 2026. A virtual Industry Day is scheduled for October 7, 2026, to provide mission briefings and RFP details. The acquisition will follow FAR Part 15 source selection procedures, with a draft RFP targeted for late Q4 FY26, a final RFP in mid Q1 FY27, and anticipated awards in Q3 FY27. Due to the sensitive nature of the requirements, the draft SOW is designated as Controlled Unclassified Information (CUI), requiring vetted access via SAM.gov based on CAGE code and registration status.
Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)

POSTED

8 days ago

DEADLINE

in 18 days
View Details
NAICS: 54171
Federal
Commercial Solutions Opening for Joint All-Domain Command and Control (JADC2)
Solicitation # FA8612-21-S-C001
The Joint All-Domain Command and Control (JADC2) Commercial Solutions Opening (CSO), managed by the Air Force AFLCMC/XA Architecture and Integration Directorate, serves as an umbrella solicitation designed to acquire innovative technologies that reduce kill chain and OODA timelines. This streamlined acquisition framework allows the government to solicit specific solutions through subsequent Calls, which may be either Closed or Open Period. These Calls target several Technology Focus Areas, including Digital Architecture, Sensor Integration, Data, Secure Processing, Connectivity, Applications, and Effects Integration. The CSO is open to a wide range of participants, including traditional and nontraditional defense contractors, small businesses, and research institutions, provided they are American entities performing all work within the United States. The acquisition process typically follows a two-step approach where offerors first submit a white paper with a rough order of magnitude price. Those favorably evaluated based on the merit of their concept are then invited to submit a full proposal. Awards may take the form of FAR Part 12 Firm-Fixed-Price contracts, procurements for experimental purposes under 10 U.S.C. 4023, or Other Transaction Agreements (OTAs) under 10 U.S.C. 4021. Recent specific efforts under this CSO have included the solicitation of multi-level security networks for DevSecOps, virtualized SD-WAN solutions, and Software Programmable Open Mission Systems Compliant multi-function processors. Proposed technologies generally require a Technology Readiness Level (TRL) of three or higher.

POSTED

7 months ago

DEADLINE

in about 2 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS