Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Request for Pre-Qualifications | Phase 1 | MP12 B and C - 500 South Capacity Upgrades - CMGC

Open
525003195State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Salt Lake City Department of Public Utilities is seeking a Construction Manager/General Contractor (CMGC) for the MP12B and C - 500 South Capacity Upgrades project. The scope of work involves intercepting existing 24-inch diameter 700 South force mains at Gladiola Street and extending them to a discharge point upstream of the 500 South Lift Station near Orange Street. The project includes the construction of two of three force mains, with the third added as needed, and involves critical crossings of the Surplus Canal, a railroad corridor, and I-215. The anticipated contract value is between $25 million and $35 million, with a projected construction timeline from August 2027 through August 2029. Selection is conducted via a two-step process. Step one requires the submission of a Statement of Qualifications (SOQ) via the U3P website by 2:00 PM on December 9, 2026. Qualified proposers from this stage will then be invited to submit a detailed proposal in step two. To be considered, firms must hold a current Utah Contractor’s License and demonstrate significant experience, including completing at least three urban pipeline projects valued at $20 million or more, installing 10,000 linear feet of pressurized pipeline, and completing two microtunnel installations of at least 60-inch diameter and 500 feet in length. Additionally, contractors must provide proof of unused bonding capacity of $25-35 million and meet specific general liability and workers' compensation insurance requirements.

General Info

SLC seeks a CMGC for a $25-35 million capacity upgrade pipeline project.

Agency

Place of Performance

UT, USA

Set-Aside

NONE

Documents

5
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstrfq
High

Read all 5 documents

Due in 17 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 17 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 5 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUtah
Contacts1 person available
OfficeUT, USA
Organization / AgencyUtah
Office AddressUT, USA

Interested Companies (24)

Archer WesternTampa, FL
Bellwork
BidSparq

See All 24 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Salt Lake City Department of Public Utilities (SLCDPU) (Owner) will be requesting Statements of Qualifications from CMGC organizations (Proposers) for the construction of the following MP12B and C - 500 South Capacity Upgrades (525003195) and for related pre-construction and procurement CMGC services:
Owner will receive Statements of Qualifications demonstrating the Proposer’s qualifications and ability to provide CMGC services via the Utah Public Procurement Place (U3P) website in accordance with the requirements outlined in the Prequalification Documents. To be considered, the SOQ is due through the U3P website no later than 2:00 PM on Wednesday, December 9, 2026 (MST). After that time, Owner will no longer accept Statements of Qualifications. See Requests for Qualifications for details on preparing and submitting the Statement of Qualifications. The CMGC Contract will include the following services and Work:
The previous phase of this project installed a new sewer pump station and two 24-inch force mains discharging to the 500 South Sewer at Gladiola Street (3400 W). This project will intercept the existing 24-inch diameter 700 South force mains on the north side of the railroad tracks at Gladiola Street and will extend them from that location to a discharge point upstream of the 500 South Lift Station near Orange Street. The project includes construction of two of the three force mains, with the third being added as flow conditions demand. Each tunnel/crossing or other critical points will include installation of all three force mains to avoid multiple construction and permitting efforts in the future. Major crossings include the Surplus Canal, a railroad corridor (one SLG&W track and three UPRR tracks), and I-215. Owner anticipates that the CMGC’s Contract Price will be approximately $25-35M and is projected to adhere to the following schedule:
Item Project Milestone Estimated Date 1 CMGC Procurement October 2026 – March 2027 2 60% Design January 2026 – April 2027 3 90% Design April 2027 – May 2027 4 Final Design June 2027 – July 2027 5 GMP Finalized August 1st, 2027 6 Construction August 2027 – Aug 2029
It’s the responsibility of the applicant to periodically check and download addenda(s), question and answer responses, or any additional information that may be posted during the advertisement period. Only SOQs submitted electronically through (U3P) BONFIRE will be accepted. Neither Owner, Owner’s Advisor, nor Engineer will be responsible for Proposal Documents, including addenda, if any, obtained from sources other than the U3P website.
Two-Step Process: Selection of the Construction Manager will be made using a two-step process. Step One: The Owner will receive Statements of Qualification and evaluate these, along with other information, to develop a list of the most highly qualified Proposers. Step Two: Qualified Proposers will receive a Request for Proposals and will submit a detailed Proposal for the CMGC Contract for the Owner’s consideration. The Proposal and the previously submitted Statement of Qualifications will be used together to determine the final ranking of Proposers for award of the CMAR Contract. The Request for Qualifications includes details on the selection criteria and selection process.
Schedule:
Item RFQ Milestone Estimated Date 1 RFQ Advertisement Wednesday, Nov 18, 2026 2 RFQ Question and Answer period ends Wednesday, December 2, 2026 (2:00 PM) 3 Final Addendum Release Monday, Dec 7, 2026 4 SOQs Due Wednesday, Dec 9, 2026 (2:00 PM) 5 Review SOQs Thursday, Dec 10, 2026 – Thursday, Dec 17, 2026 6 List of Qualified Contractors Released Friday, Dec 18, 2026
Proposal Documents: The Request for Qualifications includes details on the selection criteria and selection process. Refer to the Proposal Documents for all further requirements regarding Statements of Qualifications, Proposals, CMGC selection, and other Proposal submittals, qualifications, and procedures.
Download and read the following document attachments in the following order:
Document 1: Advertisement Document 2: Request for Qualifications Document 3: Statement of Qualifications Certification Document 4: Attachments A-F Document 5: Appendix A-B Document 6: Cover Page

Similar Contracts

Same NAICS industry code

More opportunities from Utah

Same awarding agency

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS