Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on June 18, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Request for Proposals for a Contractor to Provide Construction Services for Magoffin Home Adobe Stabilization at the Magoffin Home State Historic Site, El Paso County, El Paso, Texas

Closed
808-25-252070State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 3 hours ago

DEADLINE

in 4 days
NAICS: 238160
New
SLED
Request for Qualifications for Trade Contractors for 158 Spring Street - ROOFING AND FLASHING ONLY
Solicitation # COC-RFQ-FY27-31162RF
The City of Cambridge is seeking prequalified Trade Contractors for roofing and flashing services as part of a comprehensive renovation of the former Kennedy-Longfellow School, a 101,590 square foot structure located at 158 Spring Street. This procurement is conducted under M.G.L. c.149A Construction Management at Risk, with the specific roofing and flashing trade estimated at 55,571.00 dollars. The overall project duration is approximately 12 months from the notice to proceed. The selection process consists of two phases, beginning with a prequalification phase where firms must submit a Statement of Qualifications (SOQ) via the City's e-Procurement Portal by November 12, 2026. To be eligible for the subsequent bidding phase, firms must achieve a minimum total score of 70 points, with specific minimums required in references and project capacity categories. Mandatory requirements include a valid DCAMM Sub-bidder Certificate of Eligibility, a commitment letter for payment and performance bonds at 110 percent of the estimated contract value, and a 10-hour OSHA-approved safety certification. Applicants must submit a comprehensive package including Trade RFQ Form 1 prior to the SOQ application, along with various schedules detailing business ownership, management personnel, five years of similar project experience, and a three-year workers compensation modifier history. Additional compliance mandates include adherence to the Cambridge Employment Plan, the Responsible Employer Plan, the Living Wage Ordinance, and Minority Business Enterprise programs. All submissions must be electronically filed, and any packages received after the deadline will be rejected.
Capital Buildings Projects

POSTED

about 10 hours ago

DEADLINE

in 14 days

AI Contract Overview

Show more

The Texas Historical Commission is issuing a competitive solicitation to select a qualified general contractor for the stabilization and repair of the Magoffin Home Adobe at the Magoffin Home State Historic Site in El Paso, Texas. The project involves structural stabilization of a single-story adobe building approximately 5,000 square feet, including repairs to adobe, stucco, plaster, roofing, and wood windows and doors, with detailed scope outlined in the construction documents. Interested contractors must demonstrate a minimum of eight years of relevant experience, comply with all federal and state laws, codes, and standards, and meet the minimum qualifications specified by THC. The procurement process includes mandatory on-site pre-proposal conferences scheduled for July 8th and 9th, 2025, at 11:00 AM, with attendance verified through signed logs and site visit forms. Proposals are to be submitted via email by July 18th, 2025, and must include a Hub Subcontracting Plan and Bid Bond to avoid disqualification. The contract will be awarded within a budget range of approximately $500,000 to $1,500,000, and the selected contractor will be responsible for adhering to the general terms and conditions set forth by THC, including compliance with the Federal Acquisition Regulation (FAR) provisions related to testing, inspection, and quality assurance. The contractor must also certify adherence to numerous legal and ethical standards, such as conflict of interest disclosures, non-participation in prohibited practices, and compliance with immigration and employment laws, including E-Verify verification. Additionally, the contractor is required to develop and maintain a HUB Subcontracting Plan, submit monthly progress reports, and seek prior approval for any modifications to the subcontracting plan. The project emphasizes strict adherence to procurement and subcontracting regulations, with provisions for on-site reviews and documentation to ensure transparency, compliance, and effective project delivery in accordance with applicable federal and state statutes.

General Info

Place of Performance

TX, USA

Set-Aside

NONE

Documents

9

Exhibit K - UGC Supplementary Conditions (Texas Historical Commission)

PDF, High priority: read this firstspecifications
High

Exhibit L - Project Special Conditions

PDF, High priority: read this firstspecifications
High

Exhibit N - HUB Subcontracting Plan (HSP)

PDF, High priority: read this firstsupporting-documents
High

HP0877.2301.00 Addendum No. 01 - Magoffin Home Structural Stabilization

PDF, High priority: read this firstamendment
High

RFP # 808-25-252070 Addendum #2 - Magoffin Home Adobe Stabilization

PDF, High priority: read this firstamendment
High

RFP 808-25-252070: Magoffin Home Adobe Stabilization

PDF, High priority: read this firstrfp
High

THC 808-23-231446 Magoffin Home Structural Stabilization Construction Documents

PDF, High priority: read this firstspecifications
High

Exhibit P - THC General Terms and Conditions

PDF, Low prioritycontract-document
Low

RFP 808-25-252070 Exhibit O - Site Visit Form

PDF, Low prioritysupporting-documents
Low

AI Contract Breakdown

Uniform Contract Format
ASolicitation/Contract Form
BSupplies or Services and Prices/Costs
CDescription/Specifications/Statement of Work
DPackaging and Marking
FDeliveries or Performance
GContract Administration Data
IContract Clauses
JList of Attachments
LInstructions, Conditions, and Notices to Offerors or Respondents
MEvaluation Factors for Award

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas Historical Commission
Contacts1 person available
OfficeN/A
Organization / AgencyTexas Historical Commission
Office AddressN/A

Full Description

Show more
The Texas HistoricalCommission (THC) seeks competitive sealed proposals to establish a contract forgeneral construction in accordance with the specifications outlined in thisRequest for Proposal (RFP) pursuant to Texas Government Code (TGC) Section 442.101(a)(2) andChapter 2269, Subchapter D and 2155.The services requestedherein and to be provided under any contract(s) awarded as a result of this RFPare for the Magoffin Home Adobe Stabilization at the Magoffin Home StateHistoric Site, 1120 Magoffin Avenue, El Paso, Texas 79901.The Texas HistoricalCommission is looking for a general contractor firm that has documentedexperience with projects of the type, scale, and scope described in this RFP.The contractor must meet minimum qualifications and have a minimum of 8 yearsof experience in construction similar to the type of work required by theseContract Documents (as judged by THC) to be eligible for contract award. THCrequires all work to comply with applicable Federal and State laws, codes, andstandards.The project will include,but is not limited to, the structural stabilization and repair of asingle-story adobe structure approximately 5,000 square feet in size, involvingrepairs to adobe, stucco, plaster, roofing, and wood windows and doors. Thescope of work is described more completely in Exhibit M – ConstructionDocuments.Two mandatory on-sitepre-proposal conferences will be held at the project site at the time/dateshown in Section 3.1 Schedule of Events to familiarize contractors withthe site's conditions and characteristics. Attendance by contractorsis required for a proposal to be accepted by THC. Contractorsmust sign the attendance log sheet at the site upon arrival. This attendancelog sheet verifies all contractors who attended the mandatory on-sitepre-proposal conferences held on July 8th, 2025, and July 9th,2025, at 11:00 AM. Contractors are only required to attend one on-sitevisit.Additionally, eachrespondent must return the Exhibit O – Site Visit Form with their response,signed by the respondent and site representative, to confirm that thecontractor attended one of the mandatory on-site pre-proposal conferences onJuly 8th, 2025, or July 9th, 2025, at 11:00 AM.The site address isMagoffin Home State Historic Site, 1120 Magoffin Avenue, El Paso, Texas 79901. Ifyou need to contact a representative at the site or require locationinformation. In that case, you may reach out to the site manager, DanielleBrissette, contact@example.gov at +1 (555) 000-0000, or theproject manager, Pablo Serna, at +1 (555) 000-0000, contact@example.gov shall besubmitted via email to contact@example.gov. The subject line shallindicate “Response to RFP #808-25-252070.”All inquiries shall besubmitted in writing to contact@example.gov by the date listed as thedeadline for submission of questions, as specified in Section 3.1. Allwritten inquiries will receive written responses posted to the ESBD, availableat https://www.txsmartbuy.gov/esbd. A Hub Subcontracting Planand Bid Bond must be submitted with your RFP response by the deadline, or yourRFP will be deemed disqualified. Thank you, Christi

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS