Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on September 15, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Request for Proposals for Traffic Control Services: East County Advanced Water Purification JPA

Closed
141State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. This heavy civil infrastructure project encompasses a broad scope of work, including site preparation, earthwork, asbestos abatement, tunneling, utility installation, paving, and electrical systems. The solicitation specifically targets qualified Small Business Enterprises, Veteran-Owned Small Business Enterprises, and Disadvantaged Business Enterprises, requiring SBE and VSBE firms to provide certification from the Department of General Services and the Port of Long Beach via the PlanetBids portal. The project is subject to the California Labor Code, prevailing wage rates, and a Project Labor Agreement. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades or demonstrate the ability to maintain labor harmony. Funding is provided through multiple grants, including FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating compliance with DBE Program requirements. Responsive bidders must hold a valid California Contractor’s license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must coordinate through the BuildingConnected system by the September 15, 2026, deadline.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 3 days
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 21 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

East County Advanced Water Purification JPA is soliciting proposals from qualified contractors to provide comprehensive traffic control services related to the maintenance and emergency response for three specific pipelines of the AWP project. The scope includes work on the purified water pipeline within the streets of Santee, Lakeside, and greater San Diego County, as well as the water reclamation facility force main and the residuals bypass pipeline within Santee. The contract term may extend up to five fiscal years, spanning from FY 2026 through FY 2030, with the fiscal year defined from July 1 to June 30. Contractors interested in this opportunity must be capable of delivering all necessary labor, supervision, equipment, materials, and administrative functions—such as permitting, documentation, and compliance reporting—in adherence to all federal, state, and local regulations. The successful bidder will be required to enter into a formal service agreement to fulfill these duties. Proposals must be submitted by October 17, 2025, at 2:00 PM, and detailed qualification requirements, along with contract information, can be accessed through the East County Advanced Water Purification website. The agency overseeing this solicitation is the Padre Dam Municipal Water District in California, and the procurement is classified under NAICS code 237310 (Highway, Street, and Bridge Construction).

General Info

REQUEST FOR PROPOSALSFORTRAFFIC CONTROL SERVICES  Proposal Due Date & Time:October 17, 20252:00 PM Mail To:East County AWP JPAPO Box 719003Santee, CA 92072Attn: Amy Pederson Office Location: 9300 Fanita Parkway Santee, California 92071 The JPA is requesting proposals from qualified, competent, and experienced contractors for traffic control services for maintenance and emergency events for portions of three pipelines associated with the AWP project as set forth in this Request for Proposals (RFP) and in compliance with all applicable laws, regulations, policies, and procedures to support the JPA for a period of up to five fiscal years (FY 2026 - FY 2030). The JPA’s fiscal year runs from July 1 to June 30.  The purified water AWP Pipeline is located in streets in the City of Santee, Lakeside, and County of San Diego and the water reclamation facility (WRF) force main and residuals bypass pipeline are located in streets of City of Santee. The successful Contractor shall provide traffic control services including, but not limited to, labor, supervision, tools, equipment, supplies, permitting, recordkeeping and reporting in accordance with federal, state, and local regulations. Contractors submitting proposals must be prepared to enter into a service agreement (“Agreement”) for the duties as set forth in this RFP. Detailed information regarding the qualification requirements is located at the East County Advanced Water Purification website:https://www.eastcountyawp.com/bids.aspx

Agency

California → Padre Dam Municipal Water DistrictView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Padre Dam Municipal Water District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Padre Dam Municipal Water District
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
REQUEST FOR PROPOSALSFORTRAFFIC CONTROL SERVICES  Proposal Due Date & Time:October 17, 20252:00 PM Mail To:East County AWP JPAPO Box 719003Santee, CA 92072Attn: Amy Pederson Office Location: 9300 Fanita Parkway Santee, California 92071 The JPA is requesting proposals from qualified, competent, and experienced contractors for traffic control services for maintenance and emergency events for portions of three pipelines associated with the AWP project as set forth in this Request for Proposals (RFP) and in compliance with all applicable laws, regulations, policies, and procedures to support the JPA for a period of up to five fiscal years (FY 2026 - FY 2030). The JPA’s fiscal year runs from July 1 to June 30.  The purified water AWP Pipeline is located in streets in the City of Santee, Lakeside, and County of San Diego and the water reclamation facility (WRF) force main and residuals bypass pipeline are located in streets of City of Santee. The successful Contractor shall provide traffic control services including, but not limited to, labor, supervision, tools, equipment, supplies, permitting, recordkeeping and reporting in accordance with federal, state, and local regulations. Contractors submitting proposals must be prepared to enter into a service agreement (“Agreement”) for the duties as set forth in this RFP. Detailed information regarding the qualification requirements is located at the East County Advanced Water Purification website:https://www.eastcountyawp.com/bids.aspx

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS