Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Nebraska was posted on May 17, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Request for Qualifications for Project Auditing Services-UNMC Project NExT Phase 1 Project Health

Closed
3987-24-8015 Addendum 1State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific performance area in Riverside or Los Angeles, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 27, 2026, with a response deadline of November 4, 2026. To secure project financing, bidders must strictly adhere to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements. Bids will be deemed non-responsive if they fail to include proof of GFE #2, requiring solicitations to be posted in an online publication for 30 consecutive calendar days and in a print newspaper for one day prior to the bid opening. Additionally, proof of utilizing the Small Business Administration (SBA) and Minority Business Development Agency (MBDA) per GFE #5 must be submitted with the bid package. Documentation for outreach efforts under GFE #1 may be submitted up to three business days after the bid closing. Prime contractors are further required to flow down these GFE requirements to any subcontractors they award.
RT CONTRACTOR CORP

POSTED

about 8 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring shallow foundations, a metal standing seam roof, and exterior walls composed of masonry and metal panels. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted the first, second, and third floors, including dormitories, offices, and medical areas. The scope of work involves comprehensive architectural repairs, including the replacement of drywall, painting, ceiling tiles, flooring, and rubber wall bases, as well as electrical and plumbing restoration to return the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Requirements include a valid Massachusetts Contractor's License, compliance with NFPA-101 Life Safety Code, OSHA, EPA, and ADA regulations, and adherence to Davis-Bacon Act wage determinations. Contractors must provide a one-year workmanship guarantee and a 20-year product warranty for Luxury Vinyl Plank flooring.
Grafton Job Corps

POSTED

about 8 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. Site preparation involves rock excavation, grading, and mitigation for impacted wetlands, as well as the installation of access roads, paving, and telecommunications infrastructure. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 8 hours ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The University of Nebraska is seeking qualified financial auditors to assist with the Project NExT Phase I, also known as Project Health, which involves the comprehensive design and construction of a new hospital tower and related facilities in Nebraska, with an estimated budget of approximately $1.5 billion. The project aims to replace the aging Clarkson Hospital Tower and upgrade key medical spaces, including the Emergency Department and Interventional Radiology areas, utilizing an Integrated Project Delivery approach. The selected auditing firm will work directly with the University under a contractual agreement prepared by outside legal counsel, Hanson Bridgett, LLP, to provide specialized auditing services tailored to the complexities of an IPD project. The procurement process requires interested firms to submit their Statement of Qualifications electronically via the designated eBid system by June 6, 2024, with detailed scope and requirements outlined in the RFQ document. The contract emphasizes the importance of compliance with procurement procedures, cybersecurity protocols, and submission guidelines. The scope of work involves comprehensive auditing functions necessary for overseeing the financial aspects of the project, ensuring transparency, accountability, and adherence to contractual and regulatory standards. The solicitation is managed by the University of Nebraska-Lincoln, and the project’s size and scope reflect a significant investment in healthcare infrastructure, positioning the selected firm to play a critical role in supporting the successful delivery of this landmark development. The process underscores the importance of timely and accurate qualification submissions to be considered for this high-profile opportunity.

General Info

Documents

1

3987-24-8015 RFQ Project Auditing Services - UNMC Project NExT

PDF, High priority: read this first8 pages · rfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyThe University of Nebraska-Lincoln
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Senior Sourcing Agent-Facilities Chris Dier

Full Description

Show more
In order to participate you must submit your Statement of Qualifications electronically through this eBid system as a Response Attachment. No paper submissions will be accepted.   The University of Nebraska ("University") is seeking financial auditing services in connection with Project NExT Phase I, Project Health - Building The Healthiest Nebraska ("Project"). The Project includes design and construction services for replacement of the 70+ year-old Clarkson Hospital Tower and associated patient and visitor parking, as well as the Emergency Department and certain Interventional Radiology spaces located in the Hixson-Lied Center. The estimated cost for design and construction is approximately $1.5B. It is anticipated that this Project will be delivered through an Integrated Project Delivery method ("IPD"). Hanson Bridgett, LLP is the University's outside legal counsel who will be preparing the contract agreements with the necessary parties. The selected auditor will contract directly with the University to assist the University with necessary auditing that occurs for IPD Projects. The Scope of the work is more completely described in Request for Qualifications found in the Attachments Tab.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS