This Solicitation opportunity from Department Of Defense was posted on April 23, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Request for Technical Proposal - ECM Munitions Storage Roof Repair

Closed
FA489724RC002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific performance area in Riverside or Los Angeles, focuses on basin improvements under NAICS code 236220. The solicitation was posted on October 19, 2026, with a response deadline of November 4, 2026. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation. To secure project financing, the Inland Empire Utilities Agency requires strict adherence to expanded DBE Good Faith Effort (GFE) guidelines. Bidders must provide proof of utilizing SBA and MBDA services and demonstrate that solicitations were posted in an online publication for 30 consecutive days and in a newspaper for at least one day prior to the bid opening. Failure to include this documentation within the bid package will result in the proposal being deemed non-responsive. While outreach documentation may be submitted up to three business days after the closing date, all other mandatory GFE requirements must be met by the opening date to ensure compliance.
RT CONTRACTOR CORP

POSTED

about 2 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic system for invoicing and payments and are required to accept the standard Overaa agreement without modification. Key milestones include a mandatory pre-bid meeting on October 5, 2026, with bid submission deadlines listed as either October 28 or November 10, 2026.
C. Overaa & Co.

POSTED

about 2 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, grading, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition of 18 existing magazines and buildings 524 and 393 is also required. Technical requirements encompass a wide range of trades including demolition, abatement, concrete, structural steel, roofing, electrical, plumbing, and mechanical systems. Specialized construction features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project also involves installing primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact the primary point of contact by the October 31, 2026, deadline to receive bid documents.
J & J Contractors, Inc

POSTED

about 2 hours ago

DEADLINE

in 11 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

0, ID, 83648, USA

Set-Aside

WOSB

Documents

14

A/E/C Graphics Standard Release 2.1

PDF, High priority: read this firstspecifications
High

AFI 32-1065 Grounding Systems

PDF, High priority: read this firstspecifications
High

AFMAN 32-1065 Grounding & Electrical Systems

PDF, High priority: read this firstspecifications
High

ERDC/ITL TR-19-7 A/E/C Computer-Aided Design (CAD) Standard Release 6.1

PDF, High priority: read this firstspecifications
High

FA489724RC002 Amendment 01 - ECM Roof Repair RTP

PDF, High priority: read this firstamendment
High

FA489724RC002 - ECM Munitions Storage Facilities Roof Repair RTP

PDF, High priority: read this firstrfp
High

FA489724RC002 Provisions and Clauses

PDF, High priority: read this firstcontract-document
High

General Requirements - Repair Roof MUNS Storage 3003 (MHAFB)

PDF, High priority: read this firstsow
High

LPS B3003 Plan and Section

PDF, High priority: read this firstspecifications
High

Mountain Home AFB ACAD GIS Contract Deliverables (GeoBase)

PDF, High priority: read this firstspecifications
High

RFI-01: Repair MUNS Roof, B3003

PDF, High priority: read this firstq-and-a
High

Section 01 57 19 Temporary Environmental Controls - MHAFB

PDF, High priority: read this firstspecifications
High

SOW - Repair Roof Muns Storage 3003 and 3010

PDF, High priority: read this firstsow
High

Wage Determination ID20240048 - Idaho Heavy Construction

PDF, High priority: read this firstwage-determination
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4897 366 Cons Pkp
Contacts2 people available
OfficeMOUNTAIN HOME AFB, ID, 83648-5296, USA
Office AddressMOUNTAIN HOME AFB, ID, 83648-5296, USA

Full Description

Show more
Amendment 02: This amendment incorporates the following changes: Addition of attachment - RFIs - MHAFB ECM Roof Repair - Site Visit 12APR24 23 April 2024 Two-Step Sealed Bid Solicitation Earth Covered Magazine (ECM) Munitions Storage Facilities Roof Repair Step 1: Request for Technical Proposals FA489724RC002 Pursuant to Federal Acquisition Regulation (FAR) 14.5, this document is a Request for Technical Proposals (RTP), step one of a two-step sealed bid solicitation for the acquisition of Munitions Storage Facilities ECM Roof Repairs. Required components of technical proposals are outlined in Part III of this document. Offerors should submit technical proposals that are acceptable without additional explanation or information. The Government may make a final determination regarding a proposal's acceptability solely on the basis of the proposal as submitted. The Government may proceed with the second step without requesting further information from any offeror; however, the Government may request additional information from offerors of proposals that it considers reasonably susceptible of being made acceptable and may discuss proposals with their offerors. Each offeror may submit multiple technical proposals, though a maximum of one proposal per offeror may be chosen by the Government for step two of the two-step sealed bid process. Offerors are cautioned against submitting multiple technical proposals that have large differences in prices between them, since step two will be awarded on a low bid basis. The Government will forward a notice of unacceptability to an offeror when, upon completion of the proposal evaluation, there is a final determination of unacceptability. This will be done in accordance with the dates outlined in Part I below. In the second step of this two-step sealed bid solicitation process, only those offerors whose technical proposals were determined to be acceptable, either initially, or as a result of discussions, will be considered for award and allowed to place priced bids. Bids in the second step will be evaluated based on price. Each bid in the second step must be based on the bidder's own technical proposals. This document is organized into the following parts: Part I General Information Part II Instructions to Offerors Cover Letter Requirements of the technical proposal Site Visit Attendance and Base Access Information Question Due Dates Bid guarantee (Step 2) Part III Evaluation Criteria Part IV Attachments Part I General Information Description: Repair ECM Munitions Storage Facilities Roofs Project Scope: The Government is seeking a qualified, experienced, woman-owned small business to demolish, replace, and repair the roof of Earth Covered Magazine Munitions Storage Facilities 3003 and 3010, and optional facilities 3004, and 3006 at Mountain Home AFB, Idaho. This Design-Build project involves the removal, replacement and/or repair of the roof of a gunite-coated earth covered magazine, its lightning protection system (LPS), and its footing drain system in accordance with the attached Statement of Work (SOW). Requirements for the ECM include, but are not limited to: Removal and replacement of the trenched pipe drainage system. Removal and installation of a new roof waterproofing membrane over the concrete structure. Design and construction of a new lightning protection system. Removal and reuse of existing cover soil materials and additional imported soil materials. Replacement of the existing gunite-coating on the ECM with a geocell confinement system infilled with 4 thick, clean, uniformly graded, angular, crushed rock. Project Duration: 265 calendar days per facility Magnitude of Construction: Between $1,000,000 and $5,000,000. (Includes Options) Options: Options will be exercised as funds become available prior to 01 October 2025. Acquisition Method: Two-Step Sealed Bid Set-Aside Type: Women-Owned Small Businesses NAICS: 236220 Small Business Size Standard: $45M Solicitation Number: FA489724RC002 Step-one Issue Date: 28 March 2024 Site Visit Date: 12 April 2024 at 0900 Technical Proposals Due: 02 May 2024 Step-two Issue Date: To be determined after review of technical proposals received in step one. Review of technical proposals will be dependent on the number of proposals received but is not expected to take more than three weeks. Part II Instructions to Offerors Proposals must be submitted electronically via email to the Primary and Secondary Points of Contact listed in this solicitation by the proposal due date and shall include, at a minimum: 1. Cover letter. Provide an introductory page to include company name, small business type classification (offerors must be certified WOSB registered under NAICS 236220), CAGE Code, SAM UEI Number, points of contact, authorized negotiators, contact phone, and email addresses. Cover letter shall also acknowledge all amendments issued. 2. Written technical proposal. Technical proposals shall include only technical information. Proposals shall not include pricing information or cost breakdowns. The written technical proposal shall be clear, concise, and include all the information in sufficient detail for effective evaluation. The proposal should not simply rephrase or restate the Government's requirements, but rather provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume the Government has no prior knowledge of their capabilities, work processes, facilities, and experience and will base its evaluation on the information presented in the offeror's technical proposal. Any proposal which modifies or fails to conform to the essential requirements or specifications of this request for technical proposals shall be considered nonresponsive and categorized as unacceptable. 3. Site visit attendance and base access information. A pre-proposal site visit will be held on 12 April 2024 at 0900. Offerors must submit full names, driver's license numbers and state of issue, company name, and vehicle type (personal or commercial vehicle) of all attendees to the contracting officer and contract specialist no later than 1200 MDT on 11 April 2024. Personal vehicles will be permitted to enter the main visitor's gate, but commercial vehicles will be redirected to the commercial vehicle gate. It is important the contracting officer knows what type of vehicle your attendee(s) will be driving so that base access can be properly coordinated. No more than three (3) attendees per offeror may be permitted. 4. Questions. All questions to this RTP, including questions arising from the contractor site visit, must be submitted to both the contracting officer and contract specialist no later than close of business on 16 April 2024. There is no preferred format or document required to submit questions. 5. Bid guarantee. Offerors who are invited to submit a priced bid during Step 2 of this two-step sealed bidding will be required to furnish a bid guarantee IAW FAR 28.101-1(a). Bid guarantees are not required for the Request for Technical Proposals step of this solicitation. Part III Evaluation Criteria This acquisition will be evaluated IAW FAR Part 14. 1. Technical Factor. As used in this context, the word "technical" has a broad connotation and includes, among other things, the engineering approach, special manufacturing processes, and special testing techniques. Each offeror's written technical proposal shall be evaluated to determine if the offeror provides a sound, compliant approach that meets the requirements of the Statement of Work and demonstrates a thorough knowledge and understanding of those requirements and their associated risks. If no risks/mitigations are identified in the offeror's proposal, it indicates the offeror does not consider there to be any risk associated with their proposed approach. Offerors should submit technical proposals that are acceptable without additional explanation or information. Technical proposals will be evaluated based on the following essential elements: A. Technical Proficiency - Clearly demonstrate your team's expertise and qualifications related to the project. B. Technical Manpower - Describe the personnel who will be working on the project. Include qualifications, roles, and responsibilities. C. Clarity of Approach - Clearly outline your approach to addressing the project's technical challenges and how you plan to meet the contract requirements and manage risks, costs, and schedule. 1. Technical Proposal must sufficiently address: a. Design and Construction Schedule. b. The offeror's understanding and approach to quality control, safety, the 3-phase inspection process, and stop work authority and procedure. c. A discretionary understanding of the Mt. Home AFB Environmental Specification requirements and procedures (attachment 1). The offeror should demonstrate understanding of this specification by providing a general approach of how they intend to meet the overall requirements, as well as identifying specific applicable sections. d. Lightning Protection System (LPS) design and construction requirements of the AFI and AFMAN 32-1065, UFC 3-575-01, to include the qualified specialist. The offeror should demonstrate their understanding of the LPS requirements and how they plan to satisfy those requirements. e. Preparation and weatherproof of the magazine structure. f. Drainage system requirements. g. Earthwork, dust mitigation structure protection, compaction and testing, overall depths, and slope, and imported soil attributes. h. Cellular containment system, proper application, infill gradation, infill type and shape. Part IV 22 Attachments 1. Environmental Specification Section - - 1_01 57 19 Temporary Environmental Controls_ MHAFB Env Spec 20180628, 14 June 2022 2. MHAFB Drawings submittal requirements - - 2_ACAD_GIS_Contract_Deliverables_Geobase, 3. A/E/C Standards a. - 3a_ERDC_ITL_TR-19-6_2019.pdf_safe, August 2019 b. - 3b_ERDC_ITL_TR-19-7_2019.pdf_safe, August 2019 4. For Reference Only - B3005 Final Design - Project completed: **a. - 4a_Maintain Covering ECM, 03 March 1992** **b. - 4b_ORDINANCE STORAGE AREA, 19 February 1955** **c. - 4c_Drawings FAC 3005, 07 May 2015** **d. - 4d_Specification FAC 3005, 07 May 2015** **e. - 4e_Test Analysis FAC 3005 Specification_DO2, 07 May 2015** **f. - 4f_Design Analysis FAC 3005, 07 May 2015** 5. For Reference Only - (2016) Design package B3010 - Not constructed. **a. - 5a_Repair Roof_B3010_Specifications_Final, October 2016** **b. - 5b_Repair Roof_B3010_Design-Analysis_Final, 21 October 2016** **c. - 5c_Repair Roof_B3010_Drawings_Final, 21 October 2016** **6. For Reference Only - (2016) Design package B3007 - Not constructed.** **a. - 6a_Repair Roof_B3007_Specifications_Final, October 2016** **b. - 6b_Repair Roof_B3007_Design-Analysis_Final, 21 October 2016** **c. - 6c_Repair Roof_B3007_Drawings_Final, 21 October 2016** 7. Grounding - Lightning Protection Systems and Third-Party Testing a. - 7a_AFI32-1065 - Grounding, 14 June 2017 b. - 7b_AFMAN32-1065 - Grounding, 17 July 2020 8. For Reference Only - Concept Drawing - - 8_LPS B3003 Plan and Section 9. Provisions and Clauses, 28 March 2023 10. Statement of Work, 29 November 2023 11. General Requirement, 01 March 204 12. Wage Determination, 13 March 2023 13. RFIs - MHAFB ECM Roof Repair - Site Visit 12APR24 **Attachments with asterisks may be provided to offerors who are invited to step two of this solicitation to aid with the design phases and pricing.**

More opportunities from Department Of Defense → FA4897 366 Cons Pkp

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS