Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Residential Electrical Systems

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of 27-002.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Single Family Housing In Fill Housing Development: Pamela Dr

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Griffin-spalding County Land Bank Authority
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs complete electrical systems for new dwellings for prime contractors on Griffin-Spalding County Land Bank Authority housing projects. Performs rough-in wiring, installation of electrical panels, lighting fixtures, and outlets, and manages connection to the local utility grid. Requires a Georgia Licensed Electrical Contractor. Delivers a fully functional, inspected electrical system.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
RFP2026-113 Solar Installation on Tybee Island Marine Science Center
Solicitation # 2026-113
The City of Tybee Island, Georgia, is soliciting proposals under RFP 2026-113 for the installation of a fully functional solar array on the flat roof of the Marine Science Center located at 37 Meddin Drive. The project requires a minimum power output of 42kW, utilizing US-made Q-Cell PV modules with a minimum of 400 Watts per panel and SMA Sunny Boy string inverters. All equipment must be UL certified, and the installation must withstand wind loads of 141 miles per hour while complying with all federal, state, and local building codes. To preserve the existing GAF TPO roof warranty, the contractor must be GAF certified, follow a specific six-step process, and utilize the OMG Power Grip System Plus for structural attachment. Sealed proposals must be submitted to Aleesha Robinson at Tybee Island City Hall by 12:00 PM on November 3, 2026, with a pre-proposal meeting and site visit scheduled for October 13, 2026. A responsive bid must include a comprehensive set of documents, including a bid bond, insurance certificates, an occupational tax certificate, and various affidavits regarding E-Verify, SAVE, and debarment. Award selection is based on merit rather than the lowest price. The successful contractor will be required to provide performance and payment bonds for 100 percent of the total contract amount. Payment terms are net 30, with the city retaining 5 percent of the gross value of completed work until specific project milestones are met.
City of Tybee Island

POSTED

2 days ago

DEADLINE

in 29 days
View Details
NAICS: 238210
New
SLED
CI-275 Solano Hall Rm 1201 AV Installation
Solicitation # CI-275
California State University Channel Islands is soliciting bids for Project CI-275, a turnkey audiovisual and control system installation for the Solano Hall FIT Studio Room 1201 in Ventura, California. The project requires a qualified contractor to furnish, install, integrate, program, test, and warrant a system that incorporates an existing 75-inch display and Mac mini with new equipment, including two ceiling array microphones, four pendant speakers, digital signal processing and amplification, a wall-mounted touchpanel, and controllable USB switching. All work must be completed between November 2 and November 6, 2026, with a final operational deadline of 5:00 p.m. on November 6, 2026. The project budget is estimated at 30,000 dollars, and delays beyond the completion date are subject to liquidated damages of 200 dollars per calendar day. This is a Design-Bid-Build project requiring a lump sum base bid submitted electronically via the PlanetBids platform by October 16, 2026, at 2:00 p.m. Pacific Time. Bidders must provide bid security equal to 10 percent of the total bid and maintain all required California contractor licenses. The contract mandates compliance with prevailing wage requirements per California Labor Code sections 1720 to 1815 and requires 3 percent Disabled Veteran Business Enterprise participation. A 5 percent preference is available for qualified small businesses. Award criteria are based on the total lump sum bid, and the successful contractor will be responsible for daily site maintenance and the removal of all construction debris.
CSU, Channel Islands

POSTED

3 days ago

DEADLINE

in 11 days
View Details

More opportunities from Georgia → Griffin-spalding County Land Bank Authority

Same awarding agency

NAICS: 236117
New
SLED
Single Family Housing In Fill Housing Development: Pamela Dr
Solicitation # 27-002
Solicitation 27-002, issued by the Griffin-Spalding County Land Bank Authority, seeks proposals for the development of owner-occupied affordable housing on real property located at 809, 810, and 811 Pamela Dr in Griffin, Georgia. The project's primary objective is to eliminate neighborhood blight and return nonrevenue-generating land to productive use. Development must adhere to Low Density Residential B zoning requirements, which include a minimum lot area of 0.5 acres, a minimum lot width of 80 feet, a maximum height of 35 feet, and minimum square footage of 1,800 square feet for single-story dwellings or 1,050 square feet for dwellings with two or more stories. Interested bidders must submit a comprehensive proposal by November 23, 2026, including a bid price, construction budget, project timeline, and proof of financing. Required documentation includes a State of Georgia General Contractor's License, a business license, and proof of commercial liability insurance. Following the execution of a Transaction Agreement, the sale must close within 60 days. The selected developer is required to apply for a building permit within 90 days of the award and commence work within six months of the closing date; failure to do so may grant the Authority the option to repurchase the property. Proposals should be directed to Christopher Blocker.
New Housing For-Sale Builders

POSTED

3 days ago

DEADLINE

in about 2 months
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS