Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

RESTROOM UPGRADES/SECURITY IMPROVEMENTS/ELEVATORS

Active
N00030-09-G-0013WB70Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract involves comprehensive capital maintenance work at the Naval Industrial Reserve Ordnance Plant (NIROP) in Pittsfield, Massachusetts. The scope includes remodeling the men’s and women’s restrooms in the 2100 hall of OP2 to comply with current ADA standards. The restroom upgrades require complete removal of existing tiles, fixtures, lighting, sinks, partitions, and wall materials, followed by necessary plumbing modifications. All floors and walls will be retiled, non-tiled surfaces painted, and new fixtures, sinks, and partitions installed to ensure full compliance and improved functionality. In addition to restroom renovations, the contractor will perform security upgrades critical to maintaining the facility’s safety and integrity. These improvements encompass the installation and replacement of system control devices, electronic door hardware and locks, card readers, cameras, and related control components. Furthermore, the project mandates the installation of an elevator near room 1130A in OP1 to provide ADA-compliant access to the building’s spaces. The contractor is responsible for supplying all labor, materials, and services to complete these tasks as part of the overall effort to modernize and maintain the government-owned buildings and utility systems at the facility.

General Info

Remodel restrooms, upgrade security systems, install elevator for ADA compliance at NIROP facility.

Agency

N/A

NAICS

541330 - Engineering Services

Place of Performance

GDAIS 100 PLASTICS AVE, PITTSFIELD, MA, 01201, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Linda M HaggertyAdministrative Contracting Officer

Full Description

Show more
Restroom Upgrades The contractor shall remodel the men's and women's room in the 2100 hall of OP2 to meet current ADA standards. This effort shall include removing all tile, fixtures, lights, sinks, partitions and wall material; re-plumbing drain and supply lines as required; tiling all floors and walls; painting surfaces not tiled; and replacing fixtures, sinks, partitions and other equipment. Security Improvements The contractor shall upgrade and replacement items in support of the physical and program security functions at the facility that are needed to ensure the integrity of the security program and items within the facility as well as the safety of the facility occupants, which shall include System Control Devices, Electronic Door Hardware and Locks, Card Readers, Cameras and Control Devices. ADA Compliance - Elevators The contractor shall install an elevator in OP1, in the vicinity of room 1130A to allow access to the spaces per ADA requirements. The contractor shall provide all labor, materials and services necessary to perform the following capital maintenance effort for the government owned buildings and utilities systems at the Naval Industrial Reserve Ordnance Plant (NIROP), Pittsfield, MA.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 7 hours ago

DEADLINE

in 21 days
View Details
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 10 hours ago

DEADLINE

in 16 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS