RETENDER - Replacement of the septic system at Lac-Philippe Administrative Building and garage

Closed
NCC-DC-039892-RFQInternational

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes the installation of trenchless crossings, air release valves, blowoff assemblies, valves, fittings, and connections to existing water facilities. Additional requirements encompass the construction of flow control facility components, site improvements, cathodic protection, electrical and instrumentation, and fencing. Associated site work includes pavement removal and restoration, traffic control, utility coordination, and the final disinfection, startup, and commissioning of the system. Garney Pacific, Inc. is seeking subcontractor and supplier quotes for this project, with a response deadline of September 18, 2026, by 2:00 PM PT. All subcontractors must utilize union labor and be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid. The solicitation is open to various set-aside categories, including Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone Small Business, and Disadvantaged Business Enterprises. Primary contact for the project is Alyssa Callaway.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 9 days
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids from subcontractors and suppliers for the South Marsham Street Green Infrastructure Project in Romney, West Virginia. This targeted green-street retrofit involves approximately 343.59 linear feet of roadway between Gravel Lane and US Route 50. The scope of work requires the installation of at least 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and comprehensive drainage work including inlets, pipes, and downspout tie-ins. Additionally, the project includes ADA-compliant curb, sidewalk, apron, and crossing improvements, as well as traffic-calming measures to integrate the BMP corridor. Landscaping requirements consist of six native trees and approximately 345 native plants or approved equivalents to treat 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization and restoration. The solicitation specifically encourages participation from Minority Business Enterprises, Disadvantaged Business Enterprises, and Women-Owned Business Enterprises, as well as other small business concerns including HUBZone, Veteran-Owned, and Service-Disabled Veteran-Owned businesses. To accommodate the project scale, these entities are encouraged to form consortiums. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties should contact Jonah Leith or Jennifer Wilson for further details. The project falls under NAICS code 237110, and respondents must provide their company information and bidding status as part of the submission process.
Harbel, Inc.

POSTED

about 6 hours ago

DEADLINE

in 7 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a solicitation issued by James W. Fowler Co. on behalf of the Metropolitan Water District of Southern California. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins of 54 and 145.5 inches. Additional infrastructure requirements include four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and various piping systems. The technical requirements encompass the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This opportunity is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and woman business enterprises, with specific support available for M/W/DBE subcontractors regarding bonding, insurance, and equipment procurement. Bids are due by September 29, 2026, and all negotiations must be finalized 24 hours prior to the bid opening. The project falls under NAICS code 237110 and emphasizes the utilization of apprentices and quality control testing.
James W. Fowler Co.

POSTED

about 6 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The National Capital Commission is soliciting bids for the replacement of the septic system at the Lac-Philippe Administration Building and garage in Gatineau, Canada. This project involves a comprehensive scope of work including the installation of a tertiary septic system, sanitary sewer pipe installation, and the removal of existing discharge pipes. Additional requirements encompass site preparation, excavation, the installation of concrete curbs and gutters, asphalt paving, and landscape restoration through tree planting and hydraulic seeding. The project also includes provisional items for the disposal of contaminated soil and the installation of a garage pumping station, subject to field verification and authorization. The contract will be awarded based on the Lowest Price Technically Acceptable (LPTA) basis. To be considered responsive, bidders must provide a valid RBQ 1.4 and subclass 2.4 license, a comprehensive occupational health and safety program, and evidence of the ability to obtain required security clearances. Performance must adhere to Bureau de normalisation du Québec (BNQ) and Ministère des Transports et de la Mobilité durable (MTMD) standards. The contractor is responsible for maintaining worker's compensation clearance every 60 days and ensuring all supervisory personnel are qualified. Submissions must be sent electronically to contracts@ncc-ccn.ca by the specified deadline, with a maximum attachment size of 30 megabytes.

General Info

NCC seeks LPTA bids for septic system replacement at Lac-Philippe, Gatineau, Canada.

Agency

Government of Canada → National Capital CommissionView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

*Gatineau *Canada, CAN

Set-Aside

NONE

Documents

(13)

IFT Drawing for Septic System Replacement at Lac-Philippe Administrative Building

PDFother

053_CCN 180 lac Philippe 25-IS-053 Sketch

PDFother

DC3000-20-2021 - WWPS-Updated .pdf

PDF

053_CCN 180 lac Philippe 25-IS-053 Sketch

PDFother

Replacement of Septic System Plans and Specifications

PDFplans-and-specifications

Addendum 001 for RFQ NCC-DC-38168-RFQ BALP_GARAGE Septic System Replacement

PDFamendment

Addendum 001 for BALP_GARAGE Septic System Replacement

PDFaddendum

Étude et inspection évacuation eaux usées CCN 180 Lac Philippe

PDFreport

Description of Items on the Bid Form CCN1-002-02

PDFsow

20250807 Description des articles de la Formule de soumission

PDFsow

DC3000-20-2021 - WWPS-Updated (2).pdf

PDF

NCC-DC-039892-RFQ Replacement of Septic System at Lac-Philippe Administrative Building and Garage

PDFrfq

Wastewater Disposal Study and Design Report - Lac Philippe

PDFother

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → National Capital Commission
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → National Capital Commission
View Agency Profile
Office AddressN/A
Contacts
Carine UwamahoroPoint of Contact

Full Description

Show more
The National Capital Commission is issuing a call for tenders for the Gatineau Park Water Systems - Replacement of the Septic System at the Lac-Philippe Administration Building and Garage project.

More opportunities from Government of Canada → National Capital Commission

Same awarding agency

NAICS: 237130
International
New Underground Electric Service System
Solicitation # NCC-CS-041053-NRFP
The National Capital Commission has issued a Negotiated Request for Proposals, solicitation number NCC-CS-041053-NRFP, for the installation of a new underground electric service system at Jacques-Cartier Park North in Gatineau, Quebec. The primary objective is to establish a permanent, higher-capacity power supply to support major events, such as Winterlude, and reduce reliance on diesel generators. The scope of work is divided into two phases: Phase 1 focuses on core infrastructure and civil works near Laurier Street, including the installation of a new Hydro-Quebec infrastructure, a 600 V electrical entrance, and low-voltage distribution for the park and Maison du Vélo. Phase 2 is an optional scope extending the distribution to secondary kiosks and additional pull manholes. The project requires the removal of existing electrical infrastructure and the installation of a main 600 V switchboard and 208 V kiosks. Contractors must adhere to strict environmental and safety standards, including the implementation of tree protection, erosion and sediment control, and excess soil management plans. All work must be completed and the contractor demobilized by Winter 2027/2028, as the site will be required for other uses starting in spring 2028. Award selection is based on a multi-stage evaluation of mandatory requirements, technical capabilities, and pricing, with the top-ranked proponent entering direct contract negotiations. Required security includes performance and labour and material payment bonds, each equal to 50 percent of the project value.
Power and Communication Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 19 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS