Revetment Construction & Stone Placement

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 11 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 12 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The Ohio Department of Natural Resources is seeking a subcontractor for a project titled Revetment Construction and Stone Placement. The scope of work involves the installation or rehabilitation of a stone revetment designed to protect the shoreline from erosion. Key technical requirements include comprehensive site preparation, the installation of filter fabric, and the strategic placement of riprap or concrete blocks. This opportunity is categorized under NAICS code 237990. The solicitation was posted on August 20, 2026, and requires a response by the deadline of August 25, 2026. Interested parties can find further details through the provided Bid Express link.

General Info

Ohio DNR seeks subcontractor for shoreline revetment construction and stone placement project.

Documents

This scope was carved out of DNR-250038.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

DNR-250038

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOhio Department of Natural Resources
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install or rehabilitate a stone revetment to protect shoreline from erosion, including site preparation, filter fabric installation, and riprap or concrete block placement.

More opportunities from Ohio Department of Natural Resources

Same awarding agency

NAICS: 541620
New
SLED
Statewide Environmental Review FYs 2027-2029
Solicitation # DNR-27REALM01
The Ohio Department of Natural Resources Office of Real Estate and Land Management is seeking professional environmental consulting services to provide technical expertise and staff augmentation for its Environmental Services Section. The selected consultant will support environmental review and coordination for transportation projects, permit reviews, conservation initiatives, utility siting, and other development projects across Ohio. Key responsibilities include processing approximately 2,000 project reviews annually with a strict 30-calendar-day turnaround for Environmental Review letters, conducting quality assurance and quality control, and providing technical training and guidance. The scope emphasizes compliance with the National Environmental Policy Act (NEPA), ecological assessments, GIS support, and coordination with state and federal agencies. The contract is scheduled to run from approximately January 2027 through June 2029, with planned amendments in June 2027 and June 2028 contingent upon available funding. Performance may occur remotely, at the Fountain Square Complex in Columbus, or at various project sites throughout the state. Evaluation for award is based on a weighted scoring system focusing on firm location, workload, size, and the qualifications of the primary project team and sub-consultants. Applicants must submit a Statement of Qualifications using Form F110-330, and the selected firm will be required to maintain and operate a state-issued laptop to facilitate these services.
Environmental Consulting Services

POSTED

5 days ago

DEADLINE

in 9 days
View Details
NAICS: 541330
SLED
Geneva State Park Campground Stormwater & Site Improvements
Solicitation # DNR270074
The Ohio Department of Natural Resources is seeking professional engineering services for project DNR-270074 to implement stormwater and site improvements at Geneva State Park. The project aims to resolve chronic flooding and poor drainage within the campground by replacing the existing 1979 infiltration system with a modern combination of storm sewers and underdrains. Key design objectives include extending the system along Road D, adding catch basins, improving infiltration trench designs to prevent clogging, and ensuring proper ditch grading at outlets while avoiding existing electric and sanitary utilities. The total project cost is estimated at 2,679,000 dollars, with construction costs estimated at 2,310,000 dollars and a basic fee range between 6 percent and 10 percent. The selected firm will be responsible for the full project lifecycle, including program verification, schematic design, construction documents, and bid support. Required technical services encompass topographic and boundary surveying, geotechnical engineering, and ecological and cultural resource assessments. The firm must also manage all regulatory permitting with agencies such as the USACE, USFWS, and OEPA. During construction, the firm is required to provide at least 16 hours of on-site administration per week. Evaluation of applicants will be based on firm location, workload, size, and the qualifications of the primary firm and its consultants. Additionally, the project requires participation in the EDGE program and adherence to state prevailing wage standards. The anticipated professional services period begins in February 2027, with substantial completion of all work expected by December 2028.
Engineering Services

POSTED

15 days ago

DEADLINE

in 3 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS