This Solicitation opportunity from California was posted on September 4, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Addendum No. 1 Attachment 6 - AT&T Project Plans: This document is Attachment 6 of Addendum No. 1 for project 51126/S8138/3296, containing project plans formerly associated with SBC/AT&T. It serves as a technical modification to the original procurement package.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Bid No. 3296 - Addendum No. 2 (Parkside Street and Storm Drain Improvements): Addendum No. 2 issued on September 29, 2008, for Bid No. 3296 regarding the construction of Parkside Street and Storm Drain Improvements (Oracle Project No. 1003263). This document corrects and clarifies contract documents by replacing Page 8-11 and requires bidder acknowledgment upon submission.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Bid No. 3296 - Parkside Street and Storm Drain Improvements Addendum No. 1: Issued September 18, 2008, by the County of San Diego Department of Public Works, Addendum No. 1 modifies the contract documents for Bid No. 3296 (Parkside Street and Storm Drain Improvements). It includes page replacements, a revised payment term (15 calendar days after cutoff), and the addition of project plans from SDG&E, Cox Communications, and AT&T.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Cox Communications Project Plans (Addendum No. 1, Attachment 5): This document consists of project plans and technical specifications provided as Attachment 5 of Addendum No. 1 for the Cox Communications project. It contains detailed engineering drawings and site-specific layout requirements essential for the bid response.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Project 1003263 - Parkside Street and Storm Drain Improvements Addendum No. 1: This document is Addendum No. 1 for the construction of Parkside Street and Storm Drain Improvements (Oracle Project No. 1003263). It includes bid schedules for three additive alternates regarding the undergrounding of SDG&E, AT&T, and Cox Communications facilities, as well as detailed technical provisions for water pollution control and the requirements for a Storm Water Pollution Prevention Plan (SWPPP).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for R90415 Parkside Street Soils Report: Dated October 5, 2000, this intradepartmental memorandum from the County of San Diego Department of Public Works Materials Lab provides soil investigation results and structural section recommendations for the improvement of Parkside Street (R90415). It includes field investigation data, laboratory test results for native soil samples, and specific requirements for asphalt concrete, aggregate base, and imported backfill.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 3296: Parkside Street and Storm Drain Improvements: Notice to Contractors inviting sealed bids for the construction of Parkside Street and storm drain improvements (Oracle Project No. 1003263) in Lakeside, dated September 4, 2008. The project includes pavement construction, sidewalk improvements, and subsurface storm drain installation. Bids are due by October 2, 2008. The document includes an engineer's estimate of items, additive alternates for underground utilities, and a cost estimate between $1.6M and $1.7M. Requires a California contractor's license (Class A or C-12) and establishes a 3% DVBE goal.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for S8135 Addendum No. 1 Attachment 3 - As-Built Record Forms: This document is Attachment 3 of Addendum No. 1 for solicitation S8135. It consists of standardized forms and templates for recording as-built data, material checks, and completion dates for various locations/sheets.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for S8136 Addendum No. 1 Attachment 4 - SDGE Project Plans: This document consists of project plans associated with Addendum No. 1 for solicitation S8136, specifically regarding SDGE Project Plans. It serves as a technical attachment to a modification of the original procurement package.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for SDG&E Electric Standards - Handholes 3312 & 3313: Technical specifications and installation standards for SDG&E Electric Handholes (models 3312 and 3313). The document includes detailed bills of materials for concrete and polymer covers, specific stock numbers, installation procedures for excavation and grading, and torque requirements for bolts.
PDF
PDF, Low priorityother
LowAI Summary for Bid No. 3426 - Parkside Street and Storm Drain Improvements Planholders List: Planholders list for Bid No. 3426 (Project No. 1003263), 'Parkside Street and Storm Drain Improvements', dated September 2008. The document lists companies that have purchased or obtained contract documents, including their contact information and book numbers, for a project with a cost range of $1.6M - $1.7M and a bid opening date of October 2, 2008.
TXT
TXT, Low priority1 page · special-notice
LowAI Summary for RFB 3296 - Notice of Intent to Award: Parkside Street and Storm Drain Improvements: Notice of Intent to Award issued by the County of San Diego for Project No. 1003263 (BID No. 3296), regarding the construction of Parkside Street and Storm Drain Improvements. The county intends to award the contract to TC Construction Co., Inc. following a successful pre-award survey. The notice was posted from October 3, 2008, to October 10, 2008.
PDF
PDF, Low priorityq-and-a
LowAI Summary for RFB 3296 - Questions & Answers #1 (Parkside Street and Storm Drain Improvements): Questions and Answers #1 dated September 18, 2008, for the construction of Parkside Street and Storm Drain Improvements (Oracle Project No. 1003263 / RFB 3296). The document addresses inquiries from Errea's, Inc. regarding specialty item designations and Portillo Concrete, Inc. regarding missing construction document pages.
PDF
PDF, Low priorityq-and-a
LowAI Summary for RFB 3296 - Questions & Answers #2: Questions and Answers #2 dated September 23, 2008, for the Construction of Parkside Street and Storm Drain Improvements (Oracle Project No. 1003263 / RFB 3296). The document addresses contractor inquiries regarding roadway width requirements, specialty items, testing/inspection procedures, additive bid items, and a request for a bid date extension.
PDF
PDF, Low priorityq-and-a
LowAI Summary for RFB 3296 - Questions & Answers #3 (Parkside Street and Storm Drain Improvements): Issued September 26, 2008, by the County of San Diego Department of Public Works, this document provides responses to bidder inquiries regarding RFB 3296 (Oracle Project No. 1003263). Key clarifications include the bid award process based on base bid plus additive alternates, the availability of Addendum No. 1 via BuyNet, water supply responsibilities, traffic maintenance requirements (no closure of Parkside Street and Channel Road), and a projected start date of November 2008.
PDF
PDF, Low priorityq-and-a
LowAI Summary for RFB 3296 - Questions & Answers #4: A Questions and Answers document dated September 29, 2008, for the County of San Diego Department of Public Works project 'Construction of Parkside Street and Storm Drain Improvements' (RFB 3296). It provides clarifications to Irish Construction regarding the capping of service conduits and the responsibility for meter modifications by SDG&E.
PDF
PDF, Low priorityq-and-a
LowAI Summary for RFB 3296 - Questions & Answers #5 (Parkside Street and Storm Drain Improvements): Dated October 1, 2008, this document provides responses to plan holder inquiries regarding RFB 3296 for the construction of Parkside Street and Storm Drain Improvements (Oracle Project No. 1003263). Specifically, it clarifies traffic maintenance requirements during non-working hours for Parkside Street and Channel Road.