This Solicitation opportunity from California was posted on June 3, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Addendum No. 1 for Bid No. 4567 Sweetwater Loop Trail Construction: This document is Addendum No. 1 dated June 16, 2010, for the construction contract of Sweetwater Loop Trail and Bonita Golf Course Trail (Oracle Project No. 1005262, Bid No. 4567). It corrects and clarifies contract documents by replacing several pages and plan sheets, adding new pages, and changing specific details such as cross-section sheet counts and station numbers. The addendum includes updates to bid schedules, technical specifications, and project plans. The bid opening date is June 24, 2010, and the document provides instructions for contractors regarding document replacement and submission. Contact information for the Procurement Contracting Officer is provided for questions.
PDF
PDF, High priority: read this firstaddendum
HighAI Summary for Addendum No. 2 for Bid No. 4567 Sweetwater Loop Trail Construction: Addendum No. 2 dated June 17, 2010, for the contract documents related to the construction of Sweetwater Loop Trail and Bonita Golf Course Trail (Bid No. 4567). This addendum corrects and clarifies contract documents, specifically revising the requirements for documentation related to structural steel bridge suppliers. It references section 6-1.05 of the Standard Specifications for approval procedures. The bid opening date is June 24, 2010, at 2:00 PM. Contact information for the Procurement Contracting Officer is provided for questions.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 3 to Bid No. 4567 for Sweetwater Loop Trail and Bonita Golf Course Trail: This document is Addendum No. 3 dated June 17, 2010, for Bid No. 4567 concerning the construction of Sweetwater Loop Trail and Bonita Golf Course Trail (Oracle Project No. 1005262). It provides corrections and clarifications to the contract documents, including new quality certification requirements for fabricated bridges, and detailed revisions to project plans for pavement sections and subgrade compaction. The addendum updates notes on multiple sheets to specify removal and recompaction procedures and material specifications. The bid opening date is June 24, 2010, at 2:00 PM. Contact information for the Procurement Contracting Officer is provided for questions.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 4 for Bid 4567 Sweetwater Loop Trail Construction: Addendum No. 4 dated June 21, 2010, for the contract documents related to the construction of Sweetwater Loop Trail and Bonita Golf Course Trail (Bid No. 4567, Oracle Project No. 1005262). The addendum updates the bid opening date to July 1, 2010, at 2:00 PM, with the location remaining unchanged. It serves to correct and clarify the original contract documents.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 5 for Bid No. 4567 Sweetwater Loop Trail Construction: This document is Addendum No. 5 dated June 28, 2010, for the construction contract of Sweetwater Loop Trail and Bonita Golf Course Trail (Bid No. 4567). It corrects and clarifies contract documents including replacement of bid schedules and several technical specifications related to water pollution control, construction site management, and relations with the California Regional Water Quality Control Board. The addendum includes updated bid schedule pages and revised specifications. It also contains instructions for bidders and a detailed bid schedule for two trail segments. The bid opening date is July 1, 2010, at 2:00 PM.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Bid No. 4567 Construction of Sweetwater Loop Trail and Bonita Golf Course Trail: This contract document, Bid No. 4567, dated for bid opening on June 24, 2010, pertains to the construction of the Sweetwater Loop Trail and Bonita Golf Course Trail under Oracle Project No. 1005262 by the County of San Diego Department of Public Works. It includes bidding information, special notices regarding Disabled Veterans Business Enterprise (DVBE) participation goals, instructions for addenda and interpretations, and detailed bid schedules for two trail segments. The document outlines requirements for contractors, including licensing and DVBE participation, and provides a comprehensive table of contents covering bidding, contract execution, special provisions, technical specifications, and project plans.
PDF
PDF, High priority: read this firstplans
HighAI Summary for Bonita Golf Course Trail Construction Plans S13472: This document contains the construction plans for the Bonita Golf Course Trail project in the vicinity of Bonita, San Diego County. It includes general notes about underground utility facilities, an index of sheets covering title, legend, plan and profile, and water pollution control plan. The plans are approved by the County of San Diego Department of Public Works and dated 4/20/10. The project length is 0.64 miles and the document consists of 12 sheets detailing the construction specifications and layout for the trail.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 4567 Sweetwater Loop Trail and Bonita Golf Course Trail Bid Abstract: This document is the bid abstract for RFB No. 4567, dated around 2010, for the construction of the Sweetwater Loop Trail and Bonita Golf Course Trail in San Diego County, California. It lists the opening date as July 1, 2010, and includes a table of bids received from various contractors with Palm Engineering as the apparent low bidder. The document also contains subcontractor designation requirements, project location details, references to contract documents and specifications, and a notice inviting bids with contractor licensing and DVBE goals. The bid schedule includes detailed line items for construction tasks such as storm water pollution prevention, site management, clearing, excavation, and erosion control.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 4567 Sweetwater Loop Trail and Bonita Golf Course Trail Bid Documents: This document is part of the bid package for RFB No. 4567 concerning construction work on the Sweetwater Loop Trail and Bonita Golf Course Trail in San Diego County, California. It includes the proposal form to be executed by bidders, location details, references to contract specifications and plans approved on April 23, 2010, and a detailed bid schedule listing various construction items with estimated quantities and units of measure. The document outlines bidder certifications regarding competitive bidding and agreement to furnish bonds and contracts if awarded. It serves as a critical component for submitting a competitive bid for the project.
PDF
PDF, High priority: read this firstswppp
HighAI Summary for SWPPP for Sweetwater Reservoir Loop Trail COFD-00308: This Storm Water Pollution Prevention Plan (SWPPP) document, prepared on June 16, 2010, addresses risk level 1 construction activities for the Sweetwater Reservoir Loop Trail project in San Diego County (Project No. COFD-00308, WDID # 9 37C357719). It includes certifications, site conditions, potential pollutant sources, best management practices (BMPs), waste management, construction site monitoring, reporting, responsible parties, and training programs. The plan outlines objectives, permit registration, pollutant controls, erosion and sediment control BMPs, waste disposal, inspection schedules, and corrective actions to ensure compliance with water quality standards and regulatory requirements.
PDF
PDF, Low priorityplan-set
LowAI Summary for 4567 Plan Set Sweetwater Reservoir Loop Trail Segments 1, 3, and 4: This document is a plan set for the Sweetwater Reservoir Loop Trail, specifically covering segments 1, 3, and 4. It includes notes on construction site management, particularly regarding the dynamic nature of soil, waste, vehicle, and equipment storage areas during construction phases. The document emphasizes that these areas are not fixed on maps or plans due to frequent changes, but any storage areas remaining unchanged for a month or more will be shown on Progress Maps appended to the Erosion Control Plan. Protective measures such as fiber rolls and silt fences will be used for all storage areas.
PDF
PDF, Low priorityother
LowAI Summary for 74510 S13474 4567 info only x section sweetwater trail: Unreadable document.
PDF
PDF, Low priorityother
LowAI Summary for 74510 S13607 info only bonita x section complete: Unreadable document.
PDF
PDF, Low prioritylab-report
LowAI Summary for Grading and Storm Drain Recommendations for Bonita Golf Course Trail: This document is an intradepartmental correspondence dated October 7, 2008, from the DPW Materials Lab to DPW CIP Project Development. It provides grading and storm drain recommendations for trail improvements at Bonita Golf Course Trail, covering project limits from Station 10+00 to Station 43+80. The report includes results from soil sampling and laboratory testing at two stations, with recommendations for soil reuse, moisture conditioning, compaction, and storm drain materials for a 60-year design life. Specifications reference Caltrans and ASTM standards and California Department of Transportation guidelines.
PDF
PDF, Low prioritygeotechnical-report
LowAI Summary for Limited Geotechnical Investigation Report for Sweetwater Reservoir Loop Trail Improvements: This document is a Limited Geotechnical Investigation Report prepared by MACTEC Engineering and Consulting, Inc. dated October 7, 2008, for the proposed pedestrian bridge and trail improvements at Sweetwater Reservoir Loop Trail, Segments 1, 3, 4, and 5 in San Diego County, California. The report includes project description, site findings, geologic and tectonic setting, subsurface conditions, geologic hazards, conclusions, and recommendations for trail site preparation, grading, and pedestrian bridge foundations. It also contains appendices with field investigation data and laboratory test results. The investigation concludes the site is suitable for the proposed improvements with implementation of the recommendations.
PDF
PDF, Low priorityother
LowAI Summary for Updated Foundation Design Recommendations Report for Sweetwater Reservoir Pedestrian Bridge: This document dated March 24, 2009, provides updated foundation design recommendations for a proposed pedestrian bridge on the Sweetwater Reservoir Loop Trail in San Diego County, California. It supplements a previous geotechnical investigation report from October 2008 by MACTEC Engineering and Consulting, Inc. The report includes a project description, scope of services, field investigation details, laboratory testing references, subsurface conditions, and seismic refraction survey results. The updated recommendations address changes in the bridge location and foundation design based on new subsurface data and seismic analysis.
TXT
TXT
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.