This Solicitation opportunity from California was posted on July 14, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Bid No. 4605 - Addendum No. 1 (Campo Road Intersection Improvements): Issued August 12, 2010, Addendum No. 1 modifies the solicitation for the Construction of Campo Road Intersection Improvements (Project No. 10115331). Key changes include updated Professional Errors and Omissions Liability coverage requirements, the replacement of 'Water Pollution Control Program (WPCP)' with 'Storm Water Pollution Prevention Plan (SWPPP)' in project plans, and clarifications regarding the preparation of a new SWPPP using the Risk Level 2 Template.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Bid No. 4605 - Campo Road Intersection Improvements - Addendum No. 2: Addendum No. 2 for the Construction of Campo Road Intersection Improvements (Oracle Project No. 1011533, Bid No. 4605), dated August 17, 2010. This document modifies the original solicitation by updating the bid opening date to August 25, 2010, at 2:00pm.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Bid No. 4605 - Campo Road Intersection Improvements Addendum No. 3: Issued August 19, 2010, Addendum No. 3 modifies the solicitation for the Construction of Campo Road Intersection Improvements (Bid No. 4605). It includes page replacements, additions regarding existing utilities and traffic maintenance, new street light specifications, an updated bid schedule with items 41-56, and a street light guaranty bond.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Bid No. 4605: Construction of Campo Road Intersection Improvements: Invitation for Bids (IFB) issued by the County of San Diego for the construction of Campo Road Intersection Improvements (Oracle Project No. 1011533). The document includes bidding information, a 3% DVBE participation goal for bids over $500,000, a detailed table of contents for contract documents, and a notice to contractors. Bid opening is scheduled for August 19, 2010.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Campo Road Intersection Improvements - Access Road Cross Sections: Technical engineering drawings/cross-sections for Access Road No 1 and No 3 as part of the Campo Road Intersection Improvements project for the County of San Diego Department of Public Works, prepared by Bureau Veritas North America.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Campo Road Intersection Improvements - SWPPP Template: A Storm Water Pollution Prevention Plan (SWPPP) template prepared in April 2009 by Bureau Veritas North America Inc. for the County of San Diego. The document outlines requirements for certifications, amendments, project descriptions, pollutant source identification, Best Management Practices (BMPs), monitoring programs, and reporting for the Campo Road Intersection Improvements project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Project 5014-05-0031.57: Limited Geotechnical Investigation - San Diego County DPW: A geotechnical investigation report dated August 13, 2008, prepared by MACTEC Engineering and Consulting, Inc. for the San Diego County Department of Public Works. The document provides technical findings and engineering recommendations for the construction of a new entrance driveway, access roads, and retaining walls at the Division I Headquarters in Spring Valley, CA. It includes data on site geology, seismic hazard analysis, soil characteristics, and specific recommendations for grading, earth retaining walls, and pavement design.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB No. 4605 - Campo Road Intersection Improvements: This document is the bid proposal and bid schedule for the construction of Campo Road Intersection Improvements (Oracle Project No. 1011533) in San Diego County, California. It includes the bidder's proposal agreement and a detailed bid schedule containing 52 line items for construction activities, including storm water pollution prevention, roadway excavation, asphalt concrete, and utility relocation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for S13756 Complete Plan Set - Traffic Signal and Safety Lighting: Technical specifications and general notes for the modification of traffic signal and safety lighting systems. The document references Caltrans Standard Specifications (January 2006) and Standard Plans (May 2006), detailing requirements for utility location, permit acquisition, conduit installation, and LED signal head specifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for SWPPP Risk Level 2 Construction Activities Template: A template for a Storm Water Pollution Prevention Plan (SWPPP) for Risk Level 2 construction activities within the County of San Diego. The document provides a comprehensive framework for Qualified SWPPP Developers (QSD) to document site conditions, pollutant sources, Best Management Practices (BMPs), waste management, monitoring programs, and reporting requirements to ensure environmental compliance.
PDF
PDF, Low priorityplanholders-list
LowAI Summary for Campo Road Intersection Improvements - Planholders List: A planholders list for the Campo Road Intersection Improvements project, detailing companies and contact persons (both general contractors and subcontractors) who have requested project documents between July 19, 2010, and August 20, 2010.
PDF
PDF, Low priorityaward
LowAI Summary for RFB 4605 - Campo Road Intersection Improvements: Bid abstract and subcontractor designations for Solicitation No. 4605 (Campo Road Intersection Improvements), opened on August 25, 2010. The document lists multiple bidders and identifies Erreca's, Inc. as the apparent low bidder with a bid of 1,443,241.00. It also includes subcontractor listings for Erreca's, Inc. and a partial proposal from Wier Construction.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed