This Solicitation opportunity from California was posted on August 26, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Addendum 1 to RFB 4879 Lawson Valley Road Bridge Construction: This document is Addendum No. 1 dated August 18, 2011, for the construction project of Lawson Valley Road Bridge over Lawson Valley Creek East, associated with Oracle Project No. 1005222 and solicitation RFB 4879. The addendum clarifies that conversion of contract documents from Word to PDF caused misplacement or corruption of quotation marks in certain parts, but no corrections will be posted as content remains unaffected. It also states that alternate methods or materials may be proposed by the successful contractor after contract award for consideration by the Resident Engineer. Contact information for the Procurement Contracting Officer is provided for questions.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 2 to RFB 4879 Lawson Valley Road Bridge Construction: This document is Addendum No. 2 dated September 15, 2011, for the construction project of Lawson Valley Road Bridge over Lawson Valley Creek East, associated with RFB 4879. It announces a new bid opening date of September 28, 2011, and provides corrections and clarifications to the contract documents, including updated cross sections, revised technical specifications for asphalt concrete pavement, and replacement of certain pages in the contract documents. It also clarifies software requirements and corrects the issue date of Addendum 1. The addendum includes attachments with revised pages and is issued by the Department of Purchasing and Contracting.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 3 to RFB 4879 for Lawson Valley Road Bridge Construction: This document is Addendum No. 3 dated September 21, 2011, for the construction project of Lawson Valley Road Bridge over Lawson Valley Creek East, associated with Oracle Project No. 1005222 and solicitation RFB 4879. The addendum corrects and clarifies contract documents, specifically changing the bid opening date to October 4, 2011, at 2:00 pm, with the location remaining the same. Contact information for the Procurement Contracting Officer is provided for questions.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 5 to RFB 4879 for Lawson Valley Road Bridge Construction: This document is Addendum No. 5 dated September 29, 2011, for the construction project of Lawson Valley Road Bridge over Lawson Valley Creek East, Oracle Project No. 1005222, RFB 4879. It updates the bid opening date to October 11, 2011, and includes numerous corrections and clarifications to the contract documents. Key changes include revised pages in the contract documents, updates to specifications such as the SDG&E Utility Conduit Assembly, modifications to project plans including additional sheets and revised details, and clarifications on construction procedures and materials. The addendum ensures bidders have the latest information for accurate bid preparation.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 6 to RFB 4879 Lawson Valley Road Bridge Construction: This document is Addendum No. 6 dated October 6, 2011, for the construction contract of Lawson Valley Road Bridge over Lawson Valley Creek East, Oracle Project No. 1005222, solicitation RFB 4879. It provides corrections and clarifications to the contract documents including updates to water pollution control measures, temporary traffic signal system contact information, modifications to temporary railing and crash cushion specifications, and new requirements for asbestos/lead-based paint survey reporting. It also includes multiple plan sheet replacements and revisions affecting construction phases, retaining walls, abutments, and other structural details. The addendum ensures updated technical specifications and plan corrections are incorporated into the contract.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 7 to RFB 4879 Lawson Valley Road Bridge Construction: This document is Addendum No. 7 dated October 10, 2011, for the construction contract of Lawson Valley Road Bridge over Lawson Valley Creek East (RFB 4879). It corrects and clarifies contract documents by replacing section 8-1.08 Termination of Control with updated terms regarding contractor defaults, termination procedures, and surety rights. The addendum outlines the process for addressing contractor failures, including written notices, termination of control, and arbitration provisions. Contact information for the Procurement Contracting Officer is provided for questions.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum No. 4 to RFB 4879 Lawson Valley Road Bridge Construction: This document is Addendum No. 4 dated September 27, 2011, for the construction project of Lawson Valley Road Bridge over Lawson Valley Creek East, associated with Oracle Project No. 1005222 and solicitation RFB 4879. It provides corrections and clarifications to the contract documents, including revisions to wage rates, installation instructions, progress schedule software requirements, traffic control, temporary crash cushions, fence reconstruction, asphalt concrete pavement, bridge removal, erosion control, piling, welded steel pipe casing, slope paving, metal beam guard rail end caps, metal bridge railing, drill and bond dowels, and the Resident Engineer's office provisions. The addendum also includes replacement pages and inserts new sections to the contract documents. This amendment is critical for contractors to incorporate into their bids and project execution plans.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Bid Documents for Lawson Valley Road Bridge Construction, Bid No. 4879: This document contains the complete bid documents for the construction of Lawson Valley Road Bridge over Lawson Creek East, Federal Aid Project No. BRLO-5957 (O57), Oracle Project No. 1005222. The bid opening date is September 22, 2010. It includes special notices about addenda, disadvantaged business enterprise (DBE) requirements with an 8% UDBE contract goal, and instructions for planholders. The document also contains a detailed table of contents covering bidding information, documents to be executed by bidders, contract execution documents, and special provisions including technical specifications, labor nondiscrimination, wage rates, environmental compliance, and other contract conditions. Contact information for project inquiries is provided. This is a formal Request for Bid (RFB) package essential for prospective contractors.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 4879 Construction of Lawson Valley Road Bridge Over Lawson Creek East: This document is the Request for Bid (RFB) number 4879 for the construction of the Lawson Valley Road Bridge over Lawson Creek East, located in Jamul, San Diego County, California. It includes bid schedules with itemized construction tasks, estimated quantities, unit prices, and total bid amounts from various bidders. The document specifies the project standards, including California Department of Transportation specifications, Greenbook standards, and regional design standards. It also outlines the conditions for bid acceptance and the requirement for bidders to provide bonds and contracts if awarded. The opening date for bids was October 11, 2011, and the document identifies the apparent low bidder subject to verification.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 4879 Documents to be Executed by Bidder for Lawson Valley Road Bridge: This document is part of the Request for Bid (RFB) No. 4879 issued by the State of California, County of San Diego Department of Public Works for the construction of Lawson Valley Road Bridge over Lawson Creek East. It includes the proposal form to be executed by the bidder, detailing the location, project specifications, and compliance requirements. The document references the applicable standard specifications, amendments, and regional standards. It contains a detailed bid schedule listing items for bridge and roadway construction with estimated quantities and units of measure. The document is essential for bidders to understand the scope, pricing structure, and contractual obligations for the project.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for rfb 4879 earthwork cross sections addendum 2: This document is Addendum 2 to the Request for Bid (RFB) number 4879 concerning earthwork cross sections. It serves as an official amendment to the original solicitation, providing updates or changes to the bid requirements or specifications. The addendum is critical for bidders to review to ensure compliance with the revised terms and conditions.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 4879 Planset for Lawson Valley Road Bridge East Over Lawson Creek: This document is a planset associated with Request for Bid (RFB) 4879 for the Lawson Valley Road Bridge East over Lawson Creek project. It includes detailed structural and construction notes such as camber diagrams, falsework release alternatives, concrete strength and type limits, and design criteria referencing ASHTO LRFD Bridge Design Specifications and California Department of Transportation standards. The planset also references related contract documents including Caltrans Standard Specifications and Standard Plans dated May 2006. The document provides technical details critical for bidding and construction, including seismic design criteria, soil profiles, and construction material specifications. The version date is not explicitly stated but references standards and amendments up to 2011.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for rfb 4879 revised plan set addendum 5: This document is Addendum #5 to the revised plan set for RFB 4879, related to the Lawson Valley Road Bridge East over Lawson Creek project. It includes detailed technical specifications such as prestressing notes for 270 ksi low relaxation strand, concrete strength requirements, elongation calculations, and references to Caltrans Standard Plan B8-5. The document also contains soil and rock logging, classification, and presentation data, including borehole identification, soil consistency, core recovery, rock quality designation, fracture density, and weathering descriptors for intact rock. The addendum provides critical construction and material details necessary for the contractor's compliance and execution of the project.
PDF
PDF, Low priorityother
LowAI Summary for 1005222 Earthwork Cross Sections - 6 Sheets: This document titled '1005222 Earthwork Cross Sections' consists of 6 sheets. The content is not provided or is unreadable, and no further details about the document's purpose or specifications are available.
PDF
PDF, Low prioritysurvey-report
LowAI Summary for Asbestos and Lead-Based Paint Survey Report for Lawson Valley Bridge Project: This document is an asbestos and lead-based paint survey report dated October 5, 2009, for the Lawson Valley Bridge Replacement Project on Lawson Valley Road, San Diego County. The survey, conducted by the Department of Environmental Health's Community Health Division, found no asbestos-containing materials in the bridge joints or other sampled cementitious materials. However, high concentrations of lead-based paint were detected on painted guardrails and I-beams, though all lead-painted surfaces were intact with no deterioration observed. The report includes recommendations for contractors to use proper demolition practices to minimize dust exposure and to inform personnel of the survey results to ensure safety precautions. Analytical results from asbestos bulk samples and lead-based paint XRF readings are attached and summarized in the report.
PDF
PDF, Low prioritycondition-report
LowAI Summary for Condition Report for Lawson Valley Road Bridge Over Lawson Creek: This document is a condition report prepared in April 2002 by Boyle Engineering Corporation for the County of San Diego Department of Public Works regarding the Lawson Valley Road Bridge over Lawson Creek. The report includes an executive summary, history and purpose, field conditions, structural analysis, and recommendations. It details the bridge's original construction in 1948, replacement in 1973, and recent inspections revealing structural concerns such as abutment wall cracking, rotation, and erosion. The report provides analysis of the bridge's structural capacity and recommends maintenance actions including timber blocking, grout fill, embankment repair, load posting, and ongoing monitoring until replacement can be completed.
PDF
PDF, Low priorityother
LowAI Summary for Hazmat Review Letter for Lawson Valley Road Bridge: This document is a letter dated September 14, 2005, from the County of San Diego Department of Public Works Materials Lab. It addresses a hazardous materials review for the proposed replacement and construction of a new bridge at Lawson Valley Road Bridge. The review included a site reconnaissance and a database search by Environmental Data Resources, Inc. The conclusion is that there are no credible environmental concerns related to hazardous materials or petroleum products for the project, although the existing bridge's painted girders may contain lead. The letter is intended for Dr. Mandayam Rajan, Senior Structural Engineer.
PDF
PDF, Low priorityplanholders-list
LowAI Summary for Lawson Valley Road Bridge East Planholders List Bid 4879: This document is the planholders list for the Lawson Valley Road Bridge East project, bid number 4879, with a bid date of September 22, 2011. It includes a table of companies and contact persons who have obtained the project plans, along with their general or subcontractor status, addresses, and telephone/fax numbers. The list shows entries added from September 1, 2011, through September 27, 2011. The document serves as a record of interested parties for this specific construction bid.
PDF
PDF, Low priorityother
LowAI Summary for Recommendations for Construction in Archaeological Areas - Lawson Valley Bridge Project: This document is a memo from the County of San Diego Department of Public Works dated August 22, 2011. It provides revised recommendations for earthwork construction in environmentally-sensitive archaeological areas at the proposed Lawson Valley Bridge Project site. Key points include restrictions on vegetation removal and subgrade scarification, specifications for fill material and placement, and expectations for increased settlement and maintenance. The recommendations are based on environmental constraints and information about roadway construction and material requirements.
PDF
PDF, Low priorityother
LowAI Summary for Structure Foundation Report Lawson Valley Road Bridge 57C-0726: This document is a structure foundation investigation report prepared by Southern California Soil & Testing, Inc. for the Lawson Valley Road Bridge project (Bridge Number 57C-0726) in San Diego County, California, dated May 25, 2011. It details the field and laboratory investigations including exploratory borings, soil and rock classifications, groundwater conditions, seismic hazards, and corrosion potential. The report provides conclusions and recommendations for foundation design, including the use of cast-in-drilled-hole piles and shallow spread footings, and addresses site-specific conditions such as rock outcrops and settlement expectations. The report supports the design and construction of a new bridge to replace the existing structurally deficient bridge.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.