This Solicitation opportunity from California was posted on April 22, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Addendum 1 to RFB 5070 Jamacha Boulevard Phase II Road Improvements: This document is Addendum 1 dated May 12, 2011, for RFB 5070 concerning Jamacha Boulevard Phase II Road Improvements. It corrects and clarifies contract documents, including replacement of a contract page, additional locations for street light relocation and curb inlet baskets, and posting of additional existing topography for informational purposes. It also adds a detailed section on EPDM liner specifications and installation instructions, including material properties, handling, and splicing procedures. The addendum is critical for bidders to understand changes and additional technical requirements before the bid opening on May 19, 2011.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 2 to RFB 5070 Jamacha Boulevard Phase II Road Improvements: This document is Addendum 2 dated May 16, 2011, for RFB 5070 concerning Jamacha Boulevard Phase II Road Improvements. It corrects and clarifies contract documents including insertion of a new payment limits page, posting of a Storm Water Pollution Prevention Plan template, and updates to tree removal procedures to protect bird breeding seasons. Bidders must insert and acknowledge this addendum in their proposals. Contact information for the Procurement Contracting Officer is provided.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 2 to RFB 5070 Jamacha Boulevard Phase II Road Improvements: This document is Addendum 2 dated May 16, 2011, for RFB 5070 concerning Jamacha Boulevard Phase II Road Improvements. It corrects and clarifies contract documents including insertion of a new payment limits page, posting of a Storm Water Pollution Prevention Plan template, and updates to tree removal and vegetation clearing requirements to protect bird breeding seasons. Bidders must insert and acknowledge this addendum in their proposals. Contact information for the Procurement Contracting Officer is provided.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 5070 Construction of Jamacha Boulevard Phase II Road Improvements: This document is the Request for Bid (RFB) 5070 for the construction of Jamacha Boulevard Phase II Road Improvements, Oracle Project No. 1013679, issued by the County of San Diego Department of Public Works. The bid opening date is May 19, 2011. It includes bidding information, special notices such as Disabled Veterans Business Enterprise (DVBE) participation requirements, instructions for submitting bids, and contact information for project inquiries. The document contains detailed contract documents including special provisions, technical provisions, amendments, modifications, and standard plans. It specifies a DVBE participation goal of 3% for contracts exceeding $500,000 and outlines the process for addenda and interpretations. The document serves as the primary solicitation for contractors to submit sealed bids for this public works project.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for rfb 5070 cox plan set: This document appears to be a plan set associated with a Request for Bid (RFB) numbered 5070 related to Cox. It includes a legend and various cable line types, indicating technical specifications for the project. The document is likely used to provide detailed plans and specifications for bidders to prepare their bids accurately.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for rfb 5070 cross sections informational only: This document appears to be related to a Request for Bid (RFB) numbered 5070, titled 'Cross Sections Informational Only.' Although the content is not visible, the filename and title suggest it contains important bid-related information, likely including cross-sectional data relevant to the procurement. The document is presumably intended to inform bidders about specific technical or structural details necessary for preparing their bids. Given it is a primary solicitation document, it holds high priority for contract response.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 5070 Jamacha Blvd Soils Report: This document is a geotechnical investigation report dated May 14, 2010, prepared for the Jamacha Boulevard Retaining Wall project in Spring Valley, San Diego County, California. It provides detailed subsurface conditions, seismic design parameters, and recommendations for site preparation, grading, and retaining wall foundations. The report includes field exploration data, laboratory testing results, and engineering conclusions to support the design and construction of the retaining wall. It is intended to guide construction practices and ensure structural stability.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 5070 Jamacha Boulevard Phase II Road Improvements - Documents to be Executed by Bidder: This document is part of the Request for Bid (RFB) No. 5070 for the construction of Jamacha Boulevard Phase II Road Improvements in Spring Valley, San Diego County, California. It includes the proposal form to be executed by the bidder, detailing the location, contract references, and compliance with State of California Department of Transportation specifications. The document contains a detailed bid schedule listing various construction items, estimated quantities, and units of measure for the project. The bidder agrees to furnish bonds, contracts, and all necessary materials and labor as specified. The document is dated with plan approvals from March and April 2011 and includes references to special provisions and amendments.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for rfb 5070 jamacha plan set: This document is a Request for Bid (RFB) plan set for project 5070 Jamacha. It includes structural notes specifying masonry compressive strength of at least 2000 PSI and concrete compressive design strength of 4000 PSI at 28 days. The soil and foundation section references a Southern California soil and testing report dated May 2010 for a retaining wall in Spring Valley, San Diego County, California. The geotechnical report is part of the plans and must be complied with by the contractor. Excavation surfaces should be scarified to 12 inches and compacted to at least 95% relative compaction. The document provides technical specifications essential for bidding and construction.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 5070 Materials Lab Structural Section Recommendations for Jamacha Boulevard: This document dated May 19, 2010, from the San Diego County Department of Public Works Materials Lab provides revised structural section design recommendations for Jamacha Boulevard between Spring Glen Lane and Sweetwater Springs Boulevard. It supersedes a previous memo from September 28, 2009, based on new soil data from a March 18, 2010 field investigation. The recommendations include soil classification, test results, and design considerations for expansive soils. Two structural section options are presented with traffic index, design R-value, asphalt concrete, and crushed aggregate base thicknesses. Compaction and material specifications reference California Department of Transportation standards from May 2006. Contact information for further questions is provided.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for rfb 5070 omega plan set: This document appears to be a Request for Bid (RFB) identified as 5070 Omega Plan Set. Although the content is not visible, the filename suggests it is a primary solicitation document related to a plan set for a project. The document likely contains bid instructions, specifications, and plans necessary for contractors to prepare their bids.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for rfb 5070 sdg electrical plan set: This document is a Request for Bid (RFB) titled 'rfb 5070 sdg electrical plan set' related to Jamacha Blvd Road Improvement Phase 2. It includes detailed notes on utility separation, conduit alignment, service conduit installation, and safety precautions around energized facilities. The document specifies responsibilities for street repair, removal of existing overhead electric services, and trench construction standards. Contact information for liaison planner Carey Winston is provided. The plan set is essential for bidders to understand technical requirements and construction standards for the project.
DOC
DOC, High priority: read this firstrfb
HighAI Summary for RFB 5070 SWPPP Template Risk Level 1: This document is a Storm Water Pollution Prevention Plan (SWPPP) template for Risk Level 1 construction activities, prepared for the County of San Diego. It includes detailed instructions for preparation, certifications, site conditions, potential pollutant sources, and best management practices (BMPs) for erosion, sediment control, and waste management. The document is designed to be customized with project-specific information such as project name, county job number, and WDID number. It provides a comprehensive table of contents covering certifications, objectives, permit registration, site conditions, pollutant sources, BMPs, and waste disposal. The template emphasizes compliance with regulatory requirements and proper implementation of pollution prevention measures during construction.
PDF
PDF, Low priorityplanholders-list
LowAI Summary for RFB 5070 Jamacha Boulevard Phase II Planholders List: This document is a planholders list for the Jamacha Boulevard Phase II Road Improvements project, associated with RFB 5070. It includes company names, contact persons, general or subcontractor status, addresses, and phone/fax numbers. The list is dated from April to May 2011 and provides contact details for various construction companies interested in the project.