This Solicitation opportunity from California was posted on June 21, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Addendum No. 1 - Sheets 3R1 through 9R1: This document is Addendum No. 1, containing technical sheets 3R1 through 9R1. It specifically includes an Environmental Alert defining the Project Impact Area (PIA) boundaries, prohibiting construction activity and equipment storage outside the PIA, and restricting access to the creek to the concrete lined channel.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Bid No. 5643: Bridge Preventive Maintenance Plan #3: A complete bid package for the County of San Diego Department of Public Works regarding Bridge Preventive Maintenance Plan #3 (Federal Aid Project No. BPMPL-5957). The document includes bidding information, required execution forms, special conditions, and technical provisions. Bid opening date is August 2, 2012, with a UDBE contract goal of 3%.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for CA120001 Mod. 7 Davis-Bacon Wage Rates / Public Safety Special Provisions: Excerpt from contract special provisions incorporating General Decision Number CA120001, Davis-Bacon wage rates, Modification No. 7. The document also sets public safety and traffic control requirements, including temporary railing (Type K), excavation and storage area restrictions, crash cushion use, and lane closure rules for work areas. Based on the filename, this appears to be part of an addendum package.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for General Decision Number CA120001 - San Diego County Wage Determination: General Decision Number CA120001 (dated 07/13/2012) specifying prevailing wage rates and fringes for various construction types (Building, Heavy, Highway, and Residential) in San Diego County, California. The document lists specific hourly rates for trades including Asbestos Workers, Boilermakers, Bricklayers, Carpenters, Electricians, and Elevator Mechanics.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Mesa Grande Road Bridge Limited Lead Paint Evaluation: Dated November 29, 2011, this report from the County of San Diego Department of Environmental Health details a lead paint evaluation of the Mesa Grande Road Bridge. Findings indicate high concentrations of lead on steel girder beams. The document provides critical technical recommendations for contractor qualifications (CDPH certified), Cal/OSHA compliance, containment methods, and project oversight to prevent public and employee exposure.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 5643 Addendum 2 - Bridge Preventive Maintenance Plan #3: Addendum 2 dated August 1, 2012, for Federal Aid Project No. BPMPL-5957 (RFB 5643). This document modifies the bid opening date, moving it from August 8, 2012, to August 2, 2012, at 2:00 p.m. local time.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 5643 Bridge Preventive Maintenance Plan #3: County of San Diego Request for Bid 5643 for Bridge Preventive Maintenance Plan #3 (Oracle Project No. 1015120). The file includes the bid abstract, bidder totals, bid submission instructions, proposal pages, and notices of intent to award. It also contains a cancellation notice stating the solicitation was cancelled and all bids rejected, followed by later award-notice pages showing revised bidder rankings and intended award information dated August and September 2012.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 5643 - Bridge Preventive Maintenance Plan #3: This document contains the bid proposal and bid schedules for the County of San Diego's Bridge Preventive Maintenance Plan #3 (RFB 5643). It includes submission instructions, required exhibits (DBE/UDBE commitments), and detailed bid schedules for the Pine Valley Road Bridge and Mesa Grande Road Bridge, specifying items, estimated quantities, and unit price fields for bidder completion.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 5643 Bridge Preventive Maintenance Plan 3 - Addendum No. 1: Addendum No. 1 dated July 30, 2012, for RFB 5643 (Oracle Project No. 1015120) regarding Bridge Preventive Maintenance Plan 3. The document provides extensive revisions to the solicitation, including removing and replacing multiple pages (sections 2, 3, 4, 5, 6, and 7), updating plan sheets 3 through 9, and inserting/deleting specific technical language regarding traffic control and pavement markings.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for S19319 Addendum No. 1 - Bid Schedules: This document is Addendum No. 1 for solicitation S19319, containing detailed bid schedules for bridge work. It includes itemized pricing tables for Old Highway 80 Bridge (Schedule 1), Pine Valley Road Bridge (Schedule 1A), Mesa Grande Road Bridge (Schedule 2), and Lawrence Welk Drive Bridge (Schedule 3), specifying estimated quantities and units of measure for various construction activities.
PDF
PDF, High priority: read this firstspecial-provision
HighAI Summary for S19321 Addendum No. 1 - Debris Containment and Safety Provisions: Addendum No. 1 special provision pages for contract S19321 addressing debris containment and collection, lead-related safety and health requirements, and compliance program submittals. It requires tarps/drop cloths to protect soils and waters, submission of written safety programs and lead compliance programs, CIH review/sign-off, and reporting of air monitoring/jobsite inspection results. The document states these costs are included in the lump sum contract price and provides contractor instructions and approval timelines.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for S19322 Addendum No. 1 - Technical Specifications: Technical specifications for the application of polyester concrete and HMWM resin prime coats on bridge decks. The document details material requirements for abrasive sand, equipment standards for continuous mixers, surface preparation protocols, and specific application rates and environmental constraints for the prime coat.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for S19323 Addendum No. 1 - Special Provisions: This document is Addendum No. 1 for project S19323, containing special provisions and payment terms for polyester concrete overlay, public safety plans, removal of unsound concrete, and rapid setting concrete patches. It specifies compensation methods and technical requirements for materials and execution as directed by the Engineer.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for S19324 Addendum No 1 - Special Provisions: This document is an addendum containing special provisions for a construction project. It specifies technical requirements for traffic striping, pavement markings, Erosion Control (Type D) including seed mix and Bonded Fiber Matrix (BFM) application rates, and Temporary Fence (Type ESA) material specifications. It includes detailed measurement and payment terms for erosion control.
PDF
PDF, High priority: read this firstaddendum
HighAI Summary for S19327 Addendum No. 1 - Project Plans and Hazardous Materials Report: Addendum No. 1 for California Department of Transportation project S19327, referencing Standard Plans (May 2006), a hazardous materials report (Limited Lead Paint Evaluation for Mesa Grande Bridge, Santa Ysabel), and project plan sheets for the Old Highway 80, Mesa Grande Road, and Lawrence Welk Drive bridges. The content lists included standard plan references, report pages, and plan sheet titles.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for S19332 Addendum No. 1 - Bid Schedules: Addendum No. 1 for solicitation S19332, containing revised bid schedules for three bridge projects: Old Highway 80 Bridge (Schedule 1 & 1A), Mesa Grande Road Bridge (Schedule 2), and Lawrence Welk Drive Bridge (Schedule 3). The document includes detailed itemized lists of estimated quantities and units of measure for construction activities such as mobilization, concrete overlay, and traffic control.
TXT
TXT, Low priority1 page · special-notice
LowAI Summary for RFB 5643 - Bridge Preventive Maintenance Plan #3 (Cancellation Notice): Notice of cancellation for Request for Bid (RFB) 5643 regarding Bridge Preventive Maintenance Plan #3. The County of San Diego has rejected all bids and intends to issue a new solicitation at a later date via the Buynet website.
PDF
PDF, Low priorityother
LowAI Summary for RFB 5643 Planholder's List - Bridge Preventive Maintenance Plan 3: Planholder's list for "Bridge Preventive Maintenance Plan 3," showing companies, contacts, addresses, phone/fax numbers, and dates added. The file appears to be a bidder/plan holders log associated with RFB 5643, not a solicitation or contract award document.
PDF
PDF, Low priorityspecifications
LowAI Summary for S19029 RFB 5643 Complete Plan Set: Complete plan set for project S19029 / RFB 5643. The pages shown contain environmental alert notes defining the Project Impact Area (PIA) boundary, prohibiting environmental impacts outside the PIA, and stating no equipment may be stored within the PIA. It also references permissible staging areas to be staked prior to construction and includes legend items such as approximate project impact area and temporary gravel bag/fiber roll controls.