This Solicitation opportunity from California was posted on March 17, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
disabled veterans business enterprise (DVBE) participation required
Documents
21
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Bid No. 6388: San Vicente Road Improvement Project: Request for Bids (RFB) from the County of San Diego for the construction of the San Vicente Road Improvement Project (Oracle Project No. 1009592). The document includes bidding instructions, a mandatory pre-bid meeting on April 8, 2014, a bid opening date of April 29, 2014, and a 3% DVBE participation requirement. It contains a comprehensive table of contents covering bidding information, execution documents, special conditions, and technical provisions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for J.O. 5/1928 - Relocation of Pipelines along San Vicente Rd.: Technical plan set and materials list for the relocation of pipelines along San Vicente Rd. from Warnock Rd. to Vicente Meadow Dr. for the Ramona Municipal Water District. The document includes a declaration of responsible charge, an index of 24 drawing sheets (plan and profile), and a detailed materials list for pipeline installation, including valves, tees, and pipe spools.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Job 8857021 - AT&T Plan Set (San Vicente Road 20A): Technical construction plan set and standard notes for AT&T Job 8857021 on San Vicente Road 20A. The document details trenching and backfilling standards, conduit specifications, joint trench project data with SDG&E, and environmental compliance requirements (BMPs/SWPPPS). Includes trenching data tables and project completion date of 01-24-2013.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 6388 Addendum 1 - San Vicente Road Improvement Project: Addendum 1 dated April 2, 2014, for RFB 6388 (Oracle Project No. 1009592). This document modifies the 'Beginning of Work, Time of Completion and Liquidated Damages' section, introducing a two-step Notice to Proceed (LNTP and FNTP) process, specifying a total contract time of 420 working days, and establishing liquidated damages of $10,500 per calendar day.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 6388 Addendum 3 - San Vicente Road Improvement Project: Addendum 3 dated April 30, 2014, for Request for Bid 6388 (Oracle Project No. 1009592). This document modifies the contract by adding technical specifications for adjusting water wells and the installation/relocation of temporary crash cushions (Type ABSORB 350). It also includes instructions to replace specific pages and updates the governing ranking of contract components.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFB 6388 Cross Sections: The document contains technical cross-section specifications associated with RFB 6388. It provides detailed engineering drawings and measurements necessary for the procurement's technical requirements.
PDF
PDF, High priority: read this firstaward
HighAI Summary for RFB 6388 - San Vicente Road Improvement Project: Bid abstract and proposal for the San Vicente Road Improvement Project (Solicitation No. 6388), opened on May 7, 2014. The document lists total bids from West Coast General Corp, Ames Construction, Inc., and Flatiron West, Inc., and includes a detailed bid schedule with unit prices for roadway construction items.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 6388 - San Vicente Road Improvement Project - Addendum 2: Addendum 2 for Request for Bid 6388 (San Vicente Road Improvement Project, Oracle Project No. 1009592), dated April 24, 2014. This document extends the bid due date to May 7, 2014, modifies survey staking terms, replaces several plan sheets and SDG&E construction orders, and provides detailed responses to 15 RFI questions regarding quantities, permits, and technical specifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFB 6388 SDGE Plan Set - Technical Notes: Technical plan set notes for RFB 6388 regarding SDGE utility work. The document specifies installation requirements for underground facilities, including separation distances from wet utilities, intercept/re-route protocols for energized conduits, and compliance with joint trench agreements and regional standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for San Vicente Road 20A Muni Trench & FTZ Conversion Project Notes: Technical notes and specifications for the San Vicente Road 20A Muni Trench & FTZ Conversion Project. The document outlines installation requirements for conduits, separation distances from utilities, coordination with SOGGE specifications, and cost responsibilities regarding the 20A and FTZ funding boundaries.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for San Vicente Road 2OA & FTZ Conversion Project - Cox Plan Set: Technical plan set and construction notes for the San Vicente Road 2OA & FTZ Conversion Project, specifically detailing Cox duct structures, vaults, and hand holes to be placed at grade level within the public right-of-way.
PPTX
PPTX, High priority: read this firstpre-bid-presentation
HighAI Summary for San Vicente Road Improvement Project - Mandatory Pre-Bid Conference: Presentation from the April 8, 2014, mandatory pre-bid conference for RFB No. 6388 (San Vicente Road Improvement Project). The document outlines critical project constraints, including a 420-day contract duration, liquidated damages, permit requirements, traffic maintenance restrictions, and environmental compliance (CEQA/EIR) regarding habitat and cultural resources.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for San Vicente Road Improvements - AC and Slope Recommendations (Oracle No. 1009592): Revised intradepartmental memo dated December 22, 2008, from the DPW Materials Lab providing structural section recommendations for full-depth asphalt concrete (AC) and cut/fill slope guidelines for the San Vicente Road Improvements project. It includes specific thickness requirements for AC and aggregate base, compaction standards, and slope ratios (2H:1V for fill, 1.5H:1V for cut), while cautioning against 1H:1V cut slopes.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for San Vicente Road Improvements - Geotechnical Investigation Report: A geotechnical investigation report dated June 14, 2013, prepared by Southern California Soil and Testing, Inc. for the County of San Diego. The document provides design parameters, subsurface conditions, seismic design data, and construction recommendations for a planned retaining wall (Caltrans Type 1 or MSE) between stations 88+02 and 90+87 on San Vicente Road.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for San Vicente Road Improvements Materials Report (Oracle No. 1009592): Dated June 20, 2008, this intradepartmental memorandum from the County of San Diego DPW Materials Lab provides structural section and culvert recommendations for the San Vicente Road Improvements project. It includes soil sample data, AC coring results, corrosivity testing for culvert material selection (RCP and CSP), and specific structural section recommendations including a Traffic Index of 8.5 and required thicknesses for asphalt concrete and crushed aggregate base.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for San Vicente Road Infiltration Rate Tests Geotechnical Investigation: Geotechnical report dated November 1, 2012, prepared by Southern California Soil and Testing, Inc. for the County of San Diego. The document details infiltration rate testing and exploratory borings at seven locations along San Vicente Road to evaluate native materials for the design and construction of bio-retention basins. It includes a summary table of infiltration rates (ranging from impermeable to 3 in/hr) and subsurface exploration logs.
PDF
PDF, Low priorityplanholders-list
LowAI Summary for Bid #6388 San Vicente Road Improvements - Planholders List: A planholders list for Bid #6388, San Vicente Road Improvements, dated April 2014. The document lists general and subcontracting companies that have obtained plans for the project, including contact names, addresses, and phone numbers.
PDF
PDF, Low priorityother
LowAI Summary for RFB 6388 - San Vicente Road Improvements Mandatory Pre-Bid Meeting Sign-in Sheet: A mandatory pre-bid meeting sign-in sheet for RFB 6388, San Vicente Road Improvements. The document contains a list of attending company representatives, their contact information, and company names.
PDF
PDF, Low priorityspecifications
LowAI Summary for San Vicente Road Improvements Geologic Reconnaissance Report: Geologic reconnaissance report prepared by Southern California Soil and Testing, Inc. for the County of San Diego Department of Public Works, dated September 18, 2008. The document details the findings of a geologic study for the realignment of San Vicente Road, including surficial material analysis, seismic refraction surveys, and excavation recommendations for cut slopes.
PDF
PDF, Low priorityspecifications
LowAI Summary for San Vicente Road Re-alignment Groundwater Modeling Report: A technical report prepared by AECOM for the County of San Diego Department of Public Works, dated August 28, 2013. The document details the results of pump testing, water quality sampling, and numerical groundwater flow modeling to support the design of a dewatering system for storm drain installation along the San Vicente Road re-alignment in Ramona, California.