Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Kentucky was posted on June 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFB-785-2600000626-3 | RFB-03-27 KYTC - Clay Co. Chemical Storage Building

Closed
RFB-785-2600000626-3State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236210
New
SLED
Proposed Phase 2: 20k S.F. Industrial Spec Building
Solicitation # PE-77543-NONST-2026-000000003
The Grady County Joint Development Authority is soliciting competitive cost sealed bids for the construction of the Proposed Phase 2: 20k S.F. Industrial Spec Building in Georgia. The project scope includes the construction of a 20,000 square foot building shell and loading dock, along with site improvements such as grading, sanitary sewer construction, storm drain installation, erosion control, and concrete and asphalt paving. The work will be awarded as a single contract and is funded through the Georgia Department of Community Affairs One Georgia Program and other local agencies. The project timeline allows for 270 consecutive calendar days to reach substantial completion, with a total of 284 days for final contract close-out. Bids must be submitted to the Grady County Joint Development Authority in Cairo, Georgia, by 10:00 AM on Tuesday, October 20, 2026. To be considered, bidders must be licensed General Contractors in the State of Georgia, provide a mandatory Bidder’s Affidavit of Compliance with E-Verify, and include a bid bond or certified cashier's check for at least 10 percent of the bid amount. Additionally, the contractor's license number must be clearly written on the face of the bid envelope. The successful bidder will be required to furnish performance and payment bonds for 100 percent of the contract amount from a surety company licensed in Georgia with an A minimum rating. Bidding documents are available through Watkins & Associates, LLC for a non-refundable fee.
Grady County Joint Development Authority

POSTED

about 23 hours ago

DEADLINE

in about 1 month
NAICS: 236210
New
Federal
Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Solicitation # FA8137-26-R-0040
The Tinker Air Force Base 2026 Multiple Award Construction Contract (MACC), solicitation FA8137-26-R-0040, is a competitive Indefinite Delivery Indefinite Quantity (IDIQ) contract for general construction services. The contract aims to support a broad range of sustainment, maintenance, repair, alteration, renovation, and minor construction projects at Tinker AFB, Oklahoma. The scope includes three project execution methods: Design-Build, Construction with Limited Design, and Construction Only. The MACC is structured with an initial five-year ordering period beginning March 26, 2027, and one five-year option, for a total potential duration of ten years. The total aggregate maximum contract value is estimated at 950 million dollars, though funds are anticipated to become available in FY27. The acquisition is divided into a Small Business Pool, which is a 50 percent set-aside, and a Full and Open Pool. Award selection is based on the Highest Technically Rated Offeror (HTRO) methodology using a Minimum Technical Threshold Rating (MTTR). Offerors must meet specific point thresholds—8,190 points for Appendix C and 7,140 points for Appendix D—validated by the government through submitted work samples. Technical experience is the sole evaluation factor, and there is no cost or price evaluation at the IDIQ level. Contractors are required to adhere to strict technical and safety standards, including the Tinker AFB Facility Standard 2020 Edition, OSHA regulations, and specific Air Force instructions regarding Foreign Object Damage and Dropped Object Prevention. Key deliverables include an organization chart and quarterly progress meetings. Performance and payment bonds are required at 100 percent of the original contract price. Offerors must be registered in the System for Award Management (SAM) and meet CMMC Level 1 certification requirements for the initial award.
FA8137 Afsc Pzioc

POSTED

1 day ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The Kentucky Transportation Cabinet is soliciting proposals for the construction of a chemical storage building in Clay County, Kentucky, under solicitation number RFB-785-2600000626-3. The request was posted on June 26, 2026, with a mandatory response deadline of July 6, 2026, at 5:30 PM Eastern Time. The project falls under a state-level procurement managed by the Finance Facilities/Support Services division of the Kentucky government, and the facility will be constructed at an unspecified location within Clay County. There is no set-aside classification indicated, and the NAICS code is not provided, but the work is classified as a state and local government (SLED) procurement. All communications and inquiries should be directed to Janis Wilhoite, the primary point of contact, via email or phone, with additional support available through the Finance Facilities/Support Services office and FIN - DECA. The building is intended for the secure storage of chemicals, likely supporting transportation or maintenance operations managed by the Kentucky Transportation Cabinet. The place of performance is listed as Other, KY, indicating the exact site has not been disclosed publicly, but the work must be performed within Clay County. The solicitation is issued through the Kentucky e-Procurement portal, and interested parties must access the system via the provided UI link to obtain full documentation and submit responses. Bidders are expected to comply with all state procurement regulations, though specific technical specifications or performance requirements are not detailed in this summary. Prompt submission before the stated deadline is essential to be considered for award.

General Info

Kentucky Transportation Cabinet seeks chemical storage building construction in Clay County by July 6, 2026.

Agency

Kentucky → Finance Facilities/Support SvcView Agency

NAICS

236210 - Industrial Building ConstructionView NAICS

Place of Performance

Other, KY, USA

Set-Aside

NONE

Documents

(5)

RFB 785 2600000626 KYTC Clay Co. Chemical Storage Building

DOWNLOADrfb

RFB 785 2600000626 - KYTC Clay Co. Chemical Storage Building

DOWNLOADrfb

Addendum 1 to RFB-03-27 Chemical Storage Building

DOWNLOADamendment

Addendum 2 to RFB-03-27 Chemical Storage Building

PDFamendment

RFB 785 2600000626 - KYTC Clay Co. Chemical Storage Building

PDFrfb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyKentucky → Finance Facilities/Support Svc
Contacts3 people available
OfficeOther, KY, USA
Organization / Agency
Kentucky → Finance Facilities/Support Svc
View Agency Profile
Office AddressOther, KY, USA
Contacts
Finance Facilities/Support Svc

Full Description

Show more
RFB-03-27 KYTC - Clay Co. Chemical Storage Building

More opportunities from Kentucky → Finance Facilities/Support Svc

Same awarding agency

NAICS: 237110
New
SLED
RFB-785-2700000084-2 | RFB-59-27 KYTC - Simpson Co Infrastructure Rehabilitation
Solicitation # RFB 785 2700000084
The Commonwealth of Kentucky, through the Kentucky Transportation Cabinet, has issued solicitation RFB-59-27 (RFB 785 2700000084) for infrastructure rehabilitation at the I-65 Northbound Welcome Center in Simpson County. The project is categorized under NAICS code 237110 and focuses on resolving consistent malfunctions at the existing pump station and force main. The scope of work includes replacing the pump station and force main, installing a Muffin Monster pretreatment grinder/manhole combination, reconstructing a sewer manhole maintained by the City of Franklin, and performing directional boring under pavement. Additionally, the contractor must stabilize and reseed all disturbed areas, with an available alternate for temporary pumping of the existing wet well until the new station is operational. Bids must be submitted electronically via the Commonwealth's eProcurement system by September 15, 2026, at 13:30. Applicants are required to enter 0.00 dollars in the e-procurement system and instead provide the actual contract amount on an Official Bid Document. This document, along with any required bid bonds, must be combined into a single PDF for upload. Project coordination is managed by Jacob Huber of the Division of Engineering and Contract Administration, with technical support from Richard Tutt of American Engineers Inc and Grant Wilson of E-Tech Consultants. Detailed specifications and drawings are available through the state plan room.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS