This Solicitation opportunity from Chickasaw Nation was posted on October 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
RFB: Concrete Drainage Flume, Tribal Records Cente
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Chickasaw Nation Construction Services Division is soliciting bids for the installation of a concrete drainage flume at the Tribal Records Center in Ada, Oklahoma. The project scope requires the contractor to install a continuous pour concrete flume that connects the existing parking lot outlet to the culvert. Technical specifications mandate that the flume be scored one inch deep at twelve inches center-to-center and installed over a four-inch aggregate base on either engineered fill or undisturbed soil. Additionally, the installation must include curtain walls at each end, with a maximum total length of 100 feet as specified in the project plans. This solicitation, identified by number 27780 and NAICS code 238110, was posted on October 5, 2026. Interested parties must submit their bids via email to Lea Ann Crabtree no later than 3:00 pm on Friday, October 16, 2026. For technical inquiries and project information, the designated point of contact is Project Manager Austin Benefield. The overall administration of the procurement is overseen by Shawn Blair, Director of Commercial Construction for the Chickasaw Nation.
General Info
Agency
Place of Performance
Set-Aside
Documents
1AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- 26_1130 – Martinsburg-PAOpen now, due in 5 days
- ASO-0953-00 Construction of standalone DME at Paulding Northwest Atlanta Airport (PUJ), Dallas, GAOpen now, due in 38 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
Tribal Records Center Ada, OK
Bids must be received via email to •••••@•••••.•••Sign up to see this detail by no later than 3:00 pm Friday, October 16, 2026.
For project information contact •••••@•••••.•••Sign up to see this detail, Project Manager, or +1 (•••) •••-••••Sign up to see this detail. For information and scope please see attached RFB.
More opportunities from Chickasaw Nation
Same awarding agency
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
