Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on July 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFB for Physical Education Building Demolition

Closed
FM2026-006State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
SLED
UC Botanical Garden Access Improvements - Phase 2 (Fountain Plaza) - REBID
Solicitation # 12044B
Solicitation 12044B is a lump-sum contract issued by the University of California, Berkeley, for the Phase 2 access improvements of the Fountain Plaza at the UC Botanical Garden. The project scope includes repaving and modifying the plaza, salvaging existing bricks for the owner, patching adjacent asphalt, and relocating existing furniture while installing new owner-provided furniture. A key deliverable is the construction of a concrete bench, with an add alternate for using pre-cast materials instead of cast-in-place concrete. The estimated construction cost for the project is 160,000 dollars. To be eligible for award, bidders must hold a current California A General Engineering Contractor license and be registered with the Department of Industrial Relations. Mandatory requirements include participation in the full pre-bid conference and site tour held on November 3, 2026. Bidders must submit a statement of experience on company letterhead documenting three to five comparable landscaping projects valued at 160,000 dollars or more, completed within the last five years in the nine Bay Area counties. Specifically, the contractor must demonstrate experience with a custom curved cast-in-place concrete bench and a curved concrete wall. Bids are due by November 16, 2026, via the BuildingConnected portal, and must comply with the UC Fair Wage of at least 15 dollars per hour and prevailing wage requirements.
University of California, Berkeley

POSTED

about 5 hours ago

DEADLINE

in 17 days
NAICS: 238990
New
SLED
El Segundo Recreation Park Phase 1 Improvement Project Teen Center And Teen Plaza
Solicitation # PW 25-13
The City of El Segundo is soliciting bids for the Recreation Park Teen Center and Teen Plaza Renovation Project (PW 25-13), located at 405 E Grand Ave, El Segundo, California. The project aims to create a safe and inviting environment for teenagers, featuring the construction of tutoring centers, art studios, game rooms, classrooms, and meeting rooms, along with supporting food service areas, restrooms, and office spaces. The scope also includes site improvements such as a skatepark with specific concrete requirements, sports equipment installation, landscaping, and ADA-compliant parking. Bids are due by December 9, 2026, and must be submitted in a sealed opaque envelope addressed to the City Clerk. The contract will be awarded to the lowest responsive and responsible bidder based on a combination of the lump sum base bid, unit prices, contractor delay damages, and accepted alternates. Awardees must provide a bid bond, performance and payment bonds, and certificates of insurance. The project is subject to California prevailing wage requirements and domestic sourcing standards, including the Buy American Act and Build America Buy America. Performance begins upon the issuance of a Notice to Proceed, with a required contract schedule submitted within fifteen days of the award. Payment will be made via monthly invoices within thirty-five days of receipt, subject to a five percent retention fee.
City of El Segundo

POSTED

about 5 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The University of Texas at Arlington is soliciting bids for the complete demolition and removal of the Physical Education Building, a three-story structure covering approximately 64,365 to 65,405 square feet, along with the adjacent 24,666 square foot outdoor swimming pool and concrete deck. The project requires full removal of all concrete structures, pools, and surrounding hardscapes, with all utilities severed and capped within five feet of the building perimeter by UTA prior to work commencement. The contractor is responsible for the careful protection or removal of designated trees, signage, fencing, handrails, and sidewalks as identified in the site plan or by UTA representatives. Following demolition, the outdoor pool will be backfilled entirely with clean fill material and compacted to specification, and the entire site must be graded to a level, debris-free condition suitable for future development or landscaping. All demolition debris must be hauled off-site with a strong emphasis on recycling and salvaging materials to support UTA’s sustainability goals, and hazardous materials may not be incorporated without prior written approval. The work must comply with environmental standards including the ASBESTOS REINSPECTION SURVEY REPORT and federal and state safety regulations, with all testing performed by accredited laboratories in the presence of UTA representatives. The solicitation, identified as FM2026-006 and posted on June 11, 2026, with a response deadline of July 9, 2026, requires bids to be submitted in person at the J.D. Wetsel Service Center in Arlington, Texas, and explicitly excludes electronic, fax, or telephone submissions. Bidders must submit separate envelopes for the main bid and a required VET-HUB Subcontracting Plan, which, if omitted, results in automatic disqualification. Proposals must include detailed references, a completed Bidder Affirmation, and evidence of prior site examination. The award will be determined based on best value, not solely on lowest price, considering factors such as past performance, vendor reputation, compliance with UTA’s terms, insurance adherence, and impact on Historically Underutilized Business goals. The contract is governed by the University of Texas System’s Uniform General Conditions, superseded only by UTA’s Owner’s Special Conditions and Specifications, and includes binding requirements for prevailing wages, domestic iron and steel compliance, no engagement with sanctioned countries, and adherence to Texas Family Code and Deceptive Trade Practices laws. Bonds are mandatory—performance and payment

General Info

Demolition of UTA Physical Education Building and pools, site restored, debris removed, sustainability emphasized.

Agency

University of Texas at Arlington

Place of Performance

TX, USA

Set-Aside

NONE

Documents

3

Addendum 1 to Bid Invitation FM2026-006

PDF, High priority: read this firstamendment
High

Bid FM2026-006 Physical Education Building Demolition

PDF, High priority: read this firstrfb
High

ESBD_526172_1782911761978_ADDENDUM_2_2026_006.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUniversity of Texas at Arlington
Contacts1 person available
OfficeTX, USA
Organization / Agency
University of Texas at Arlington
Office AddressTX, USA

Full Description

Show more
This project includes the completedemolition and removal of the Physical Education Building located on theUniversity of Texas at Arlington campus. Gross Square Footage 64,365. All utilities servicing thebuilding—including electrical, water, gas, and data—will be cut and capped byUTA within five feet of the building perimeter prior to demolition activities.The demolition contractor will be responsible for the full removal of theConcreteStructure, indoor and outdoor swimming pools, including selective demolitionand replacement of adjacent concrete surfaces as required to restore the site.Additionally, the contractor shall protect or remove designated trees, signage,handrails, fencing and sidewalks as identified in the site plan or by UTArepresentatives. Upon completion of demolition, swimming pools will be backfilled completely with clean fill material and compacted to specification. Outdoor swimming pool and concrete deck is24,666 SqFt. The site shall be graded toa level condition suitable for future development or landscaping, free ofconcrete, stones and clumps of dirt. All debris and materials generated duringdemolition shall be hauled off-site by the contractor, with an emphasis onrecycling and salvaging materials wherever feasible to support sustainabilitygoals.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS