This Award Notice opportunity from California was posted on March 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
PDF, High priority: read this first3 pages · amendment
HighAI Summary for Addendum 2 - Table of Contents: This document is Addendum 2, providing a comprehensive Table of Contents for a bidding package. It outlines the structure of the procurement file, including bidding information, documents to be executed by the bidder (such as bid schedules and bonds), documents for the successful bidder, and detailed special provisions/conditions covering project management, safety, and compliance.
PDF
PDF, High priority: read this first3 pages · amendment
HighAI Summary for Addendum No. 1 for Project STP-103-1(112) Wilber North: This document is Addendum No. 1 for the Nebraska Department of Transportation Project No. STP-103-1(112), Control No. 13265, related to the Wilber North project with letting date August 28, 2025. It amends plan sheet G4 as depicted on the attached sheet and states that upon contract execution, the plans will be revised accordingly. The addendum was issued on August 14, 2025, by Construction Engineer James J. Knott, P.E. It is intended for contractors who received bidding proposals, with responsibility for notifying subcontractors or suppliers resting with the contractor.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Attachment J - Community Center As-Built Plans: Technical as-built documentation for the Community Center and Site Improvements for Lindo Lake Park Phase 2. The document includes a sheet index (demolition, grading, drainage, lighting, and planting), general notes on underground facilities, utility coordination requirements, and specific electrical/mechanical notes for HVAC units (AC-1, AC-2, AC-3) and fire alarm design.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Attachment L - Restroom Building As-Built Plans: Technical as-built specifications and installation details for irrigation controllers and electrical conduit for a restroom building project for the County of San Diego Department of Parks and Recreation.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Attachment M - Boat House As-Built Plans Scope of Work: Scope of Work for the Boat House project, detailing a Base Bid for remaking the boat house, relocating the superstructure on a new concrete slab, and demolition of existing structures, as well as an Alternate Bid for remodeling the existing boat house and reconstructing the wooden bridge.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Attachment N - Helix WD and Lakeside WD As-Built Plans: Technical as-built plans for Helix Water District and Lakeside Water District, provided as Attachment N to a procurement package. These documents contain critical technical specifications and infrastructure layouts necessary for project execution.
PDF
PDF, High priority: read this first949 pages · specifications
HighAI Summary for Attachment O - Dredge Material Geotechnical Characterization (Lindo Lake Restoration): A geotechnical report dated February 26, 2020, prepared by SCST, LLC for Michael Baker International. The document details laboratory test results and field sampling of lake sediment soils for the Lindo Lake Restoration project in Lakeside, California. It includes soil classifications, R-values, expansion indices, and corrosivity testing for approximately 200,000 cubic yards of proposed dredge material.
PDF
PDF, High priority: read this first46 pages · specifications
HighAI Summary for Attachment P - Stormwater As-Built Plans: This document consists of stormwater as-built plans and reference maps provided by Planning and Development Services. It includes legends for Road Fund Culverts, Road Fund Channels, and Flood Control infrastructure, intended for reference purposes.
PDF
PDF, High priority: read this first8 pages · specifications
HighAI Summary for Attachment T - Site Specific Safety Plan Template (Addendum 5): A template for a Site-Specific Safety Plan (SSSP) required by the County of San Diego Department of Parks and Recreation (DPR). It outlines the requirements for contractors to identify hazards, implement safety control measures, and provide emergency response plans before operations commence. The document includes sections for project contacts, job hazard analysis, and specific safety controls for demolition, traffic, environmental protection, and hazardous energy.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Attachment V - As-Built Pathway Lighting Details (Addendum 7): Technical as-built specifications and lighting details for the Lindo Lake West Basin project, provided as part of Addendum 7. The document includes installation requirements for pole-mounted fixtures, conduit depth (PVC Schedule 40), concrete footing specifications (2-200 PSI min), and a legend of electrical symbols.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Attachment W - Sewer Connection (Addendum 7): This document appears to be Addendum 7 regarding sewer connections for Lake Shore Dr, dated May 8, 2023. The provided content is fragmented, containing location references and a timestamp.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Attachment Y – Road Right of Way (Addendum 7): Technical drawing specification for Road Right of Way, provided as Addendum 7. The document specifies a scale of 1"=60' for reduced plans.
PDF
PDF, High priority: read this first3 pages · plans
HighAI Summary for CN13265 Wilber North Construction Plans: This document contains the construction plans for the Wilber North project in Saline County, Nebraska, under project number STP-103-1(112) and contract number 13265. It includes detailed sheets such as typical cross sections, summary of quantities, environmental considerations, horizontal alignment, general information, geometrics, grades, erosion and sediment control, pavement marking plans, traffic control plans, lighting, drainage cross sections, and special plans for bridge and guardrail work. The plans reference the 2017 Nebraska Standard Specifications and special provisions, with project raw materials and recycled content data provided. The document is intended for use by the Nebraska Department of Transportation Construction Division and is critical for project execution and compliance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Improvement Plans for Lindo Lake Restoration - Phase 2 (Addendum 7): Technical landscape and demolition specifications for Phase 2 of the Lindo Lake Restoration. The document includes detailed notes on tree protection, removal, stump grinding requirements, planting habitats, and seed mixes. It also outlines base bid requirements and bid alternates for park amenities, including grading and irrigation systems, dated April 24, 2025.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Improvement Plans for Lindo Lake Restoration - Phase 2 (Addendum 8): Technical improvement plans and specifications for Phase 2 of the Lindo Lake Restoration project in Lakeside, CA. The document includes an index of sheets covering grading, drainage, erosion control, and bridge construction, as well as specific bid alternates for bridge foundations and walkways. It references 2021 Standard Specifications for Public Works Construction and provides detailed site notes and project scopes.
PDF
PDF, High priority: read this first57 pages · specifications
HighAI Summary for Lakeside Teen Center - As-Built Plans (Attachment K): Technical specifications and as-built plans for the installation of a solar photovoltaic system at the Lakeside Teen Center for the County of San Diego. The document includes detailed electrical notes, compliance codes (NEC, CEC), a scope of work for 48 PV modules and micro-inverters, and a list of project sheets including site plans and single-line diagrams.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Lindo Lake Improvements Phase 1 As-Built Plans: Technical as-built plans and civil details for the Lindo Lake Improvements Phase 1 (East Basin) project for the County of San Diego Department of Parks and Recreation. The document includes erosion control plans, civil details (CD-7), and key maps prepared by AECOM, with a final conformed set dated October 19, 2020.
PDF
PDF, High priority: read this first322 pages · specifications
HighAI Summary for Lindo Lake Improvements Phase 2 (West Basin) - Part 5 Technical Specifications: Technical specifications for the Lindo Lake Improvements Phase 2 (West Basin) project, issued for bid submittal on 01/29/2026. The document includes a comprehensive table of contents covering various construction sections (concrete, demolition, earth moving, etc.) and detailed special provisions regarding the control of work, inspection, and construction scheduling.
PDF
PDF, High priority: read this first313 pages · specifications
HighAI Summary for Lindo Lake Improvements Phase 2 (West Basin) - Part 5 Technical Specifications: Technical specifications document (Addendum 7) for the Lindo Lake Improvements Phase 2 (West Basin) project, issued by AECOM on 01/29/2026 for bid submittal. It includes a comprehensive table of contents covering various construction sections (concrete, demolition, earth moving, etc.) and detailed general requirements for the control of work, inspection, and construction scheduling.
PDF
PDF, High priority: read this first34 pages · specifications
HighAI Summary for Lindo Lake Improvements Phase I - Geotechnical Investigation Report: A geotechnical investigation report dated March 31, 2021, prepared by Atlas Technical Consultants LLC for Michael Baker, Inc. regarding the Lindo Lake Improvements – Phase I in Lakeside, California. The document provides subsurface conditions, geologic hazard assessments, and detailed engineering recommendations for earthwork, foundations, and pipelines to ensure construction feasibility.
PDF
PDF, High priority: read this first25 pages · specifications
HighAI Summary for Lindo Lake Restoration Certification No. R92019 0146: This document is a Clean Water Act Section 401 Water Quality Certification and Waste Discharge Requirements issued by the California Regional Water Quality Control Board, San Diego Region, for the Lindo Lake Restoration Project. It outlines the project description, including the dredging, grading, and lining of lake basins, and specifies the required mitigation and restoration of jurisdictional waters. The document includes technically-conditioned certification and incorporates the Habitat Monitoring Plan by reference.
PDF
PDF, High priority: read this first101 pages · specifications
HighAI Summary for Lindo Lake Restoration Phase 2 - Geotechnical Investigation: Geotechnical investigation and engineering report prepared by AECOM for the County of San Diego, Department of Parks and Recreation, dated December 5, 2025. The document provides subsurface exploration findings, geologic conditions, and technical recommendations for the design and construction of pedestrian bridge foundations as part of the Lindo Lake Restoration Project Phase 2.
PDF
PDF, High priority: read this first7 pages · specifications
HighAI Summary for Lindo Lake Restoration Phase 2 - Water Diversion Design Memo: Technical design memorandum dated April 17, 2026, detailing the stormwater diversion system for the Lindo Lake Restoration Project Phase 2. The document outlines the design basis for managing stormwater inflows during the installation of a bentonite liner in the west lake, including hydrologic calculations using the Rational Method and half-full flow analysis to determine peak runoff results for 10-year and 2-year storm events.
PDF
PDF, High priority: read this first74 pages · specifications
HighAI Summary for Lindo Lake Restoration Project - Groundwater Study Report: A May 2017 groundwater study prepared by NV5 for San Diego County as part of the CEQA Supplemental Environmental Impact Report (SEIR) process. The report analyzes the impact of groundwater pumping on the Lindo Lake restoration and expansion project, providing water balance calculations, aquifer pump testing results, and recommendations for additional wells to maintain lake levels.
PDF
PDF, High priority: read this first63 pages · specifications
HighAI Summary for Lindo Lake Spillway and Island Bridge Structural Calculations: Structural design calculations and narrative for the Lindo Lake Spillway Bridge, dated December 24, 2025. The document details the design of a 31-foot prefabricated timber bridge, including applicable AASHTO reference codes, dead and live loading analysis (pedestrian and H5 vehicle), seismic considerations, and abutment design specifications including bearing pressure and soil weight calculations.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Nebraska DOT Proposal Form STP-103-1(112) August 28, 2025: This document is the Proposal Form for Nebraska Department of Transportation project STP-103-1(112) with letting date August 28, 2025. It includes key contract details such as contract ID 13265, project location N-103 Wilber North in Saline County, contract time of 100 working days, and a DBE goal of 3%. The document outlines bidding instructions, prequalification requirements, and special provisions including general conditions, prosecution and progress requirements, environmental commitments, wage determinations, and federal contract provisions. It also contains a detailed table of contents covering divisions from general requirements to material details and special provisions for federal aid projects. The document serves as a primary solicitation for contractors to submit bids for highway construction work under specified terms and conditions.
PDF
PDF, High priority: read this first31 pages · special-provisions
HighAI Summary for Part 4 – Special Provisions (addendum 7): This document outlines the Special Provisions (Addendum 7) for a County of San Diego Department of Parks and Recreation project. It specifies critical contract terms including a 260-working-day completion timeline, liquidated damages of $2,500 per day, permit responsibilities, the order of precedence for contract documents, and requirements for a full-time on-site supervisor and baseline progress schedule submission.
PDF
PDF, High priority: read this first12 pages · specifications
HighAI Summary for Part 7 - Special Revisions to CalTrans Standard Specifications: This document contains special provisions and modifications to the 2025 CalTrans Standard Specifications for a project involving the County of San Diego. It includes specific revisions to definitions, holiday schedules, contract bond requirements, material testing standards (relative compaction), and detailed liability insurance minimums.
PDF
PDF, High priority: read this first3 pages · amendment
HighAI Summary for RFB 13078 Addendum No. 2 - Lindo Lake Improvements Phase 2: Issued March 16, 2026, this addendum modifies RFB 13078 for the Lindo Lake Improvements Phase 2 project. Key changes include updating the job walk location to the Lakeside Community Center, correcting cross-references for Biological and Cultural Resources Monitoring, updating the title of the improvement plans to include 'Restoration', and replacing specific pages and Attachment A.
PDF
PDF, High priority: read this first1 page · amendment
HighAI Summary for RFB 13078 Addendum No. 3 - Lindo Lake Improvements Phase 2: Addendum No. 3 dated 3/24/2026 for RFB 13078 (Lindo Lake Improvements Phase 2). This document outlines specific changes to improvement plans, including grading plan adjustments, fence length reductions, typographic corrections, and irrigation plan revisions. It replaces Attachment A (Improvement Plans) from Addendum 2 with a revised version.
PDF
PDF, High priority: read this first1 page · amendment
HighAI Summary for RFB 13078 Addendum No. 6 - Lindo Lake Improvements Phase 2: Addendum No. 6 for RFB 13078 (Lindo Lake Improvements Phase 2), dated April 30, 2026. The primary purpose of this document is to notify bidders that the bid opening date has been changed to May 13, 2026, at 2:00 PM local time.
PDF
PDF, High priority: read this first2 pages · amendment
HighAI Summary for RFB 13078 Addendum No. 8 - Lindo Lake Improvements Phase 2: Addendum No. 8 dated May 8, 2026, for the Lindo Lake Improvements Phase 2 project (RFB 13078). It updates the bid opening date to May 15, 2026, at 2:00 PM and provides several revisions to the bid schedule and improvement plans, specifically adjusting quantities for items BA8.9, bid item 1, and BA8.15. It also replaces several documents from Addendum 7 with updated versions.
PDF
PDF, High priority: read this first128 pages · rfb
HighAI Summary for RFB #13078 - Lindo Lake Improvements Phase 2: Request for Bids (RFB #13078) for the Lindo Lake Improvements Phase 2 project (Oracle Project No. 1025566). The document specifies a bid opening date of April 10, 2026, and requires contractors to be pre-qualified by the County. Key requirements include a 3% Small-Local Business Subcontractor Participation goal, compliance with the Working Families Ordinance, and CARB vehicle emissions regulations. A virtual pre-bid meeting is scheduled for March 16, 2026.
PDF
PDF, High priority: read this first1 page · amendment
HighAI Summary for RFB 13078 Lindo Lake Improvements Phase 2 - Addendum 1: Addendum No. 1 dated March 12, 2026, for RFB 13078 (Lindo Lake Improvements Phase 2). This document modifies the pre-bid meeting and job walk date to March 17, 2026, updates the page reference for the Working Families Ordinance (WFO), and adds Part 5 Special Provisions Technical Specifications.
PDF
PDF, High priority: read this first1 page · amendment
HighAI Summary for RFB 13078 Lindo Lake Improvements Phase 2 - Addendum 10: Addendum No. 10 dated May 13, 2026, for the Lindo Lake Improvements Phase 2 (RFB 13078). This document provides a technical clarification regarding the height of the orange-colored plastic snow fence in the Improvements Plans, correcting the height from 4 inches to 4 feet.
PDF
PDF, High priority: read this first41 pages · rfb
HighAI Summary for RFB #13078 - Lindo Lake Improvements Phase 2 (Addendum 7): This document is Part 1 (Bidding Information) of Addendum 7 for the Lindo Lake Improvements Phase 2 project (Oracle Project No. 1025566, RFB #13078) issued by the County of San Diego. It provides a Notice to Contractors inviting sealed bids and details the Base Bid general provisions, including lump sum payment items for mobilization, construction fencing, SWPPP preparation and implementation, field office requirements, and pre-construction site surveys/staking.
PDF
PDF, High priority: read this first23 pages · rfb
HighAI Summary for RFB #13078 - Lindo Lake Improvements Phase 2 (Addendum 8): This document is the bid form (Part 2) for the County of San Diego's Lindo Lake Improvements Phase 2 project (Oracle Project No. 1025566, RFB #13078). It includes the official bid agreement, a detailed Base Bid schedule with unit price items for grading, site improvements, drainage, amenities, and planting, as well as two Additive Alternates for bridge construction. The work is to be performed in accordance with 2025 Caltrans and 2021 Greenbook Standard Specifications.
PDF
PDF, High priority: read this first40 pages · rfb
HighAI Summary for RFB #13078 - Lindo Lake Improvements Phase 2 (Addendum 8): This document is Part 1 (Bidding Information) of Addendum 8 for the Lindo Lake Improvements Phase 2 project (Oracle Project No. 1025566, RFB #13078) issued by the County of San Diego. It outlines the base bid requirements, including detailed lump sum payment items for mobilization, construction fencing, SWPPP preparation and implementation, field office requirements, and pre-construction site surveys.
PDF
PDF, High priority: read this first1 page · amendment
HighAI Summary for RFB 13078 - Lindo Lake Improvements Phase 2 - Addendum 9: Addendum No. 9 dated May 11, 2026, for the Lindo Lake Improvements Phase 2 project. This document provides a critical clarification regarding the approved maximum flow rate, correcting a previous statement in Addendum 7 from 500 gallons/minute to 75 gallons/minute.
PDF
PDF, High priority: read this first1 page · amendment
HighAI Summary for RFB 13078 Lindo Lake Improvements Phase 2 - Addendum No. 4: Addendum No. 4 dated March 27, 2026, for the Lindo Lake Improvements Phase 2 (RFB 13078). This document provides a response to a bidder question regarding the project estimate by directing the contractor to the Lindo Lake Improvements Board Letter and Minute Order 3 via the San Diego County Board of Supervisors document search.
PDF
PDF, High priority: read this first8 pages · amendment
HighAI Summary for RFB 13078 - Lindo Lake Improvements Phase 2 Addendum No. 5: Addendum No. 5 for the Lindo Lake Improvements Phase 2 (RFB 13078), dated April 8, 2026. This document updates the bid opening date to May 1, 2026, and provides detailed responses to 15 bidder questions regarding engineer's estimates, avian nesting restrictions, change order procedures, labor provisions, and SWPPP cost allocations.
PDF
PDF, High priority: read this first41 pages · amendment
HighAI Summary for RFB 13078 - Lindo Lake Improvements Phase 2 Addendum No. 7: Addendum No. 7 dated May 5, 2026, for the Lindo Lake Improvements Phase 2 (RFB 13078) project. This document provides a series of questions and answers (Q&A) clarifying requirements for aquatic life relocation, small local business participation goals, traffic control restrictions near Lindo Park Elementary School, resident notification requirements, weather day claims, and permit responsibilities.
PDF
PDF, High priority: read this firstaward
HighAI Summary for RFB 13078 Lindo Lake Improvements Phase 2 - Bid Abstract and Proposal: This document contains a bid abstract and a specific bid proposal for the Lindo Lake Improvements Phase 2 project (RFB #13078) for the County of San Diego. It lists multiple bidders with their total bid amounts, identifying Hazard Construction Engr LLC as the apparent low bidder. Additionally, it includes the detailed bid submission from Granite Construction Company, including a partial CLIN/bid schedule for general site improvements and project specifications dated May 15, 2026.
PDF
PDF, High priority: read this first23 pages · rfb
HighAI Summary for RFB #13078 - Lindo Lake Improvements Phase 2 Bid Form: This document is the bid form (Part 2) for the County of San Diego's Lindo Lake Improvements Phase 2 project (RFB #13078, Oracle Project No. 1025566). It includes the bid submission agreement, a detailed Base Bid schedule with unit price items covering general provisions, grading, site improvements, drainage, amenities, and planting/irrigation, as well as two Additive Alternates for bridge foundations and superstructure.
XLSX
XLSX, High priority: read this first7 pages · bid-schedule
HighAI Summary for RFB 13078 Lindo Lake Improvements Phase 2 Bid Schedule: A detailed bid schedule for the Lindo Lake Improvements Phase 2 project (RFB 13078). The document outlines the Base Bid items across general provisions, grading, site improvements, drainage, site amenities, and planting/irrigation, as well as five additive alternates including bridge foundations, a pedestrian island bridge, a fishing pier, and bird viewing areas.
XLSX
XLSX, High priority: read this first7 pages · specifications
HighAI Summary for RFB 13078 - Lindo Lake Improvements Phase 2 Bid Schedule (Addendum 7): A detailed bid schedule for the Lindo Lake Improvements Phase 2 project, issued as Addendum 7. The document contains a comprehensive list of line items for the Base Bid, including general provisions, grading, site improvements, drainage, site amenities, and planting/irrigation. It also includes four additive alternates for bridge foundations, bridge superstructures, and a floating fishing pier.
XLSX
XLSX, High priority: read this first13 pages · bid-schedule
HighAI Summary for RFB 13078 Lindo Lake Improvements Phase 2 Bid Schedule (Addendum 8): This document is a detailed bid schedule for the Lindo Lake Improvements Phase 2 project, issued as Addendum 8. It contains a comprehensive list of line items for the Base Bid, including general provisions, grading, site improvements, drainage, site amenities, and planting/irrigation. Additionally, it includes four Additive Alternates for specific structural components such as bridge foundations, a prefabricated timber bridge, and a fishing pier.
PDF
PDF, High priority: read this first5 pages · specifications
HighAI Summary for RFB #13078 Lindo Lake Improvements Phase 2 - Part 6: Part 6 of RFB #13078 for the Lindo Lake Improvements Phase 2 project, specifically Addendum 7. This document serves as a comprehensive index of supplemental forms, standard drawings, project plans, and technical reports. It includes a detailed list of improvement plans (grading, erosion control, planting, irrigation, and fish habitat), structural calculations for bridges, geotechnical investigations, and various environmental permits and as-built plans.
PDF
PDF, Low priorityother
LowAI Summary for ATTACHMENT_S_-_Statement_of_Compliance_CEM-2503(addendum 5).pdf: Unreadable document.
DOCX
DOCX, Low priority1 page · specifications
LowAI Summary for Attachment U - Door Hanger Template (Addendum 5): A template document for a door hanger, provided as part of Addendum 5. The content consists of a visual layout/graphic for a door hanger sign.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.