Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on July 2, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFI - Monongahela River, Lock and Dam 3 Decommissioning

Closed
W911WN21SS0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Pennsauken Community Pool Improvements
Solicitation # 2026-BID-15
The Township of Pennsauken, New Jersey, is soliciting bids for the Pennsauken Community Pool Improvements project, solicitation number 2026-BID-15. The scope of work involves the rehabilitation, construction, and general improvement of the community pool, including site clearing, reinforced concrete flooring and wall construction, sandblasting the pool interior, and the installation of shade structures and electrical conduits. All work must adhere to the 2019 NJDOT Standard Specifications for Road and Bridge Construction and comply with the Americans with Disabilities Act of 1990. The contract will be awarded to the lowest qualified responsible bidder. Bids must be submitted electronically via the OpenGov Procurement Portal. Per Addendum #01, the submission deadline is November 10, 2026, at 10:30 AM, and submissions must include a signed Acknowledgment of Receipt of Changes. Required documentation includes a bid bond of 10 percent not to exceed 20,000 dollars, a notarized Non-Collusion Affidavit, and a Public Works Contractor Registration Certificate. The contract period is one year, with a possible one-year extension. Awarded contractors must comply with the New Jersey Prevailing Wage Act, mandatory affirmative action language, and provide a two-year maintenance bond. Payment is processed through the Township's governing body meeting cycle, contingent upon the submission of certified payrolls and itemized invoices.
Procurement

POSTED

about 12 hours ago

DEADLINE

in 11 days
NAICS: 237990
New
SLED
Seaview Vehicular Beach Access Ramp Reconstruction Project
Solicitation # 26-B-128CW
The Seaview Vehicular Beach Access Ramp Reconstruction Project, solicitation number 26-B-128CW, is an invitation for bid issued by Volusia County, Florida, to restore beach access at Seaview Avenue in Daytona Beach following destruction by Hurricane Ian. The project scope includes the demolition of damaged infrastructure and the construction of a new reinforced and unreinforced concrete vehicular ramp, a pedestrian sidewalk, curbing, and a composite sheet pile bulkhead with a concrete cap. The estimated construction cost is 1,213,413.00 dollars, with bids due electronically by November 5, 2026. Award will be granted to the lowest responsive and responsible bidder based on price, verified references, and demonstrated experience with similar projects. The project is subject to strict regulatory and technical requirements, including a Florida Department of Environmental Protection coastal construction permit that mandates specific protections for turtle nesting and lighting restrictions. Contractors must comply with FDOT traffic control standards, OSHA safety regulations, and federal provisions including the Davis-Bacon Act and E-Verify. Required deliverables include a payment and performance bond, comprehensive insurance coverage, and an as-built survey. Contract administration involves a 30-day payment cycle for undisputed invoices and a specific sales tax exemption procedure for materials. The County maintains the right to inspect all finished work, providing the contractor 20 days to remedy any punch list items before final acceptance.
Coastal

POSTED

about 13 hours ago

DEADLINE

in 6 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

PA, USA

Set-Aside

NONE

Documents

1

Industry+Day+Slides+Mon+3+Decommissioning++6-23-21.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Pittsburgh
Contacts2 people available
OfficePITTSBURGH, PA, 15222-4198, USA
Office AddressPITTSBURGH, PA, 15222-4198, USA

Full Description

Show more
This is a Sources Sought Notice / Request for Information (RFI). This notice is issued solely for informational and planning purposes and does not constitute an Invitation for Bids, Request for Proposals, or Request for Quotes. No solicitation is currently available. This request does not obligate the Government in any contact award. The Government will not pay for the provision of any information, nor will it compensate any respondents for the development of such information. Do not submit cost proposals or cost information. Interested parties must not submit proprietary or competition sensitive information within their response. Responses to this notice is strictly voluntary and will not affect any firm's ability to submit a proposal/bid if and when a solicitation is issued. The U.S. Army Corps of Engineers, Pittsburgh District, is seeking information to assist in creating contract documents to remove approximately 640 ft of the fixed crest dam at Monongahela (Mon) 3 while leaving 30 ft for stabilization of the left dam abutment. The driving factor behind the design is to open the new navigable channel after the breach in as quick of a timeframe as possible, minimizing the impact to navigation. The Mon 3 lock will remain open until the breach is blasted. Once the breach commences, navigation cannot be restored until a 300 ft wide opening to draft depth is created. The final debris removal outside the 300 ft channel may be completed after navigation is restored. The debris will be disposed of on site and a portion of it will be processed to create aggregate to fill the flume way and stabilization berms for long term stability of the upper guide wall, land wall, and dam abutment monoliths. Slides with notes from the Industry Days conducted on June 23, 2021 are included as an Attachment to this post for your information and consideration in drafting responses to the below questions. Questions (1-16) 1. What flow conditions in the Braddock and Mon 3 pools are needed to safely remove the sheet pile wall, install the demolition materials, and conduct the demolition and debris removal? 2. From your perspective, given time is the driving factor, is blasting or mechanical removal preferred? 3. From your experience, what is the general difference in production rate between blasting and mechanical removal? 4. How may you choose to drill, load, and blast the navigable channel? All 300 ft of the new navigation channel footprint at once to full depth or sequentially in shorter, shallower sections? If in sections, what may the interval be between them and why? 5. What is your estimate as to the amount of time required from the initial breach to remove 300 ft of the fixed crest dam to at least 12 ft below the water surface? What conditions are required for this estimate to be feasible? Can this be accomplished in 30 days? 6. What are the time constraints to open the channel: Equipment, personnel, permitting, dredging, debris removal, surveying, other? 7. What are concerns prior to the breach? 8. What are concerns after the breach? 9. Are there concerns with keeping the navigation channel open while charges are being loaded in the vicinity? 10. What is the safety limit on flow rate/pool elevation for Contractors to approach and work on the dam? Will you need to approach the dam from downstream, upstream, or both? 11. Is a cofferdam, or other means of flow alteration, required for blasting of the dam in general or for blasting of the submerged portions of the dam on the downstream end? 12. What is the anticipated swell factor of demoed concrete for removal from the river? Is this dependent most on the blast pattern used, the method of mechanical removal, or composition of the concrete? 13. What is the typical amount of slump/debris fallout in concrete after the blast and what factors impact the slump value the most? 14. How much time is required to remove approximately 350 ft of sheet pile wall on the downstream face of the dam? The sheet pile is approximately 30 ft tall and embedded approximately 25 ft with about 5 ft exposed above the surface. 15. What type of lock access is needed to support the demolition and debris removal? 16. Will you be able to work safely multiple shifts and at night? -End of Questions- The Government may use the responses to this RFI for information and planning purposes. Information Submission Instructions All responses to this RFI shall be emailed to Jane Roney at contact@example.gov by 1:00 pm ET on July 16, 2021. TELEPHONE INQUIRES WILL NOT BE ACCEPTED. Attachment to the RFI Slides Presented at Industry Day, June 23, 2021

More opportunities from Department Of Defense → W072 Endist Pittsburgh

Same awarding agency

NAICS: 237990
New
Federal
JP Murtha Float Mooring Bitts Retrofit
Solicitation # W911WN27BA001
The United States Army Corps of Engineers, Pittsburgh District, is soliciting a Firm-Fixed-Price construction contract for the John P. Murtha Floating Mooring Bitts Retrofit at the John P. Murtha Locks and Dam in Westmoreland County, Pennsylvania. This project requires complex in-the-wet construction to install Government-furnished floating mooring bitts into contractor-fabricated embedded frames on the existing river chamber middle wall. The scope of work includes engineering design, the fabrication and installation of two structural steel dewatering boxes with a maximum 90-day duration, heavy concrete demolition using wire-sawing and core drilling, and the integration of cast-in-place concrete. The contractor must provide a fully compliant floating plant, certified commercial dive teams for underwater rigging and sealing, and adhere to EM 385-1-1 safety standards. The total period of performance is 730 calendar days following the Notice to Proceed. This is an unrestricted full and open solicitation under NAICS code 237990, with a small business size standard of 45 million dollars. Award will be granted to the lowest responsive and responsible offeror, with a 10 percent price evaluation preference provided to HUBZone firms. Bidders must be registered in the System for Award Management and the Procurement Integrated Enterprise Environment, where all electronic bids must be submitted. The contract is subject to the Davis-Bacon Act for wage determinations and requires a three-phase Quality Control System. Key deliverables include the fully operational mooring bitt assemblies and comprehensive quality control documentation. Performance and payment bonds are required, with the performance bond set at 100 percent of the original contract price.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in 6 days
View Details
NAICS: 238210
New
Federal
RFI - Survey for Advance Contract Initiative Temporary Emergency Power
Solicitation # ACI-TEP-Survey
The Department of Defense, through the USACE Pittsburgh District, is conducting a sources-sought fact-finding exercise for an Advance Contract Initiative regarding Temporary Emergency Power. This initiative aims to establish a contract prior to federal declared emergencies to ensure rapid response capabilities across the United States and its territories. The current objective is to gather industry feedback on logistics, mobilization sequencing, subcontractor relationships, and cost drivers to inform future scope considerations and efficiency improvements. The scope of work involves providing all labor, equipment, and materials to support temporary emergency power activities through three phases: Mission Readiness, Mission Mobilization, and Mission Execution. Key responsibilities include conducting pre-installation inspections to determine generator sizing and connection methods, managing equipment at staging areas, and executing the installation of generators and external fuel tanks. Contractors must adhere to specific FEMA Bill of Materials standards and maintain 24-hour response operations. Operational requirements include the potential deployment of a five-person Advanced Echelon team and the appointment of a Site Safety and Health Officer. Performance is measured by the accuracy of installation assessments and the ability to mobilize assets to staging areas in a fully operational status. The process is governed by strict reporting timelines, including a 30-minute voice communication response standard and a 60-minute notification window for mishaps or incidents.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 238160
New
Federal
Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement
Solicitation # W911WN26QA062
The U.S. Army Corps of Engineers, Pittsburgh District, is soliciting quotes for a 100% Small Business Set-Aside project to replace the structural standing seam metal roof on the Control Tower Building at Mosquito Creek Lake in Cortland, Ohio. This non-commercial construction project, categorized under NAICS 238160, has a rough estimate between $150,000.00 and $350,000.00. The scope of work includes the demolition and disposal of the existing roof system, box gutters, scuppers, and lightning protection, as well as the refurbishment of up to 95 linear feet of cold-formed metal sub-framing. Additional requirements include rerouting vent and exhaust pipes through the masonry side wall, sealing and insulating the concrete roof slab to R-30, and installing a new gutter system and a certified, non-penetrating Lightning Protection System compliant with LPI 175, NFPA 780, and UL 96A. The project will be awarded as a single Firm-Fixed Price contract based on best value, evaluating both price and past performance. The performance period is 365 calendar days from the written Notice to Proceed, with work hours restricted to Monday through Friday, 7:00 AM to 4:00 PM. Key personnel requirements include a Project Superintendent and a Quality Control System Manager, each with at least five years of relevant experience, and a Site Safety and Health Officer meeting EM 385-1-1 qualifications. Performance and payment bonds are required if the contract price exceeds $150,000. Final acceptance is contingent upon successful watertightness testing per AAMA 501:2 procedures and the delivery of a UL Master Label or LPI Certificate of Conformance.
Roofing Contractors

POSTED

7 days ago

DEADLINE

in about 6 hours
View Details
NAICS: 237990
Federal
Canonsburg-Houston, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation
Solicitation # W911WN27QA005
The U.S. Army Corps of Engineers, Pittsburgh District, is soliciting a Firm-Fixed-Price purchase order for the rehabilitation of the Canonsburg-Houston Local Protection Project in Strabane, Washington County, Pennsylvania. This total small business set-aside project, under NAICS 237990, focuses on restoring federal project integrity and design conveyance capacity along Chartiers Creek following severe storm damage. The scope of work includes vegetation clearing, the installation of erosion and sediment controls, the creation of temporary water diversions, and the removal and replacement of damaged geotextile fabric and riprap. The anticipated construction cost is between $150,000.00 and $350,000.00, with an expected award date of December 11, 2026. The project must be completed within 365 calendar days after the written Notice to Proceed, with a performance start window of 10 days. Work is restricted to weekdays from 7:30 AM to 4:00 PM. The government will award the contract based on best value, evaluating quotes on price and past performance. Key requirements include the provision of a Project Superintendent, a CQMC-certified Quality Control System Manager, and a dedicated Site Safety and Health Officer. Compliance with USACE EM 385-1-1 (2024) and the Davis-Bacon Act is mandatory. Performance and payment bonds are required at 100 percent of the original contract price, and liquidated damages for delays are set at $566.00 per calendar day.
Other Heavy and Civil Engineering Construction

POSTED

8 days ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS