Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Michigan was posted on June 6, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFP 01-087 Zero Emissions Bus Depot

Closed
RFP #01-087State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves comprehensive electrical and infrastructure work for the installation of various charging and dispensing units at the Zero Emissions Bus Depot in Roseville, California. The contractor is responsible for providing all wiring, bolting, hardware, and equipment necessary for the installation of six Level 3 charging units (ABB models), 21 electric vehicle dispensing units (ABB models), and 16 Level 2 chargers (Ford models), including associated power distribution panels, transformers, conduits, trenching, and surface restoration. The Level 3 chargers require fiber-optic connectivity, which the contractor must include within their scope, along with testing, calibration, and commissioning to ensure fully functional operation upon project completion. The project may be executed in up to three mobilizations, and the contractor must maintain a construction bond throughout. Additionally, the scope includes installing 58 protective bollards in paved areas with existing electrical infrastructure, requiring shallow footings and pavement restoration to match existing conditions. As an optional add-alternate, the contractor can also install 17 wheel stops matching existing parking standards, and purchase and install additional charging and dispensing units—specifically, two PCS units and four EVD units—per the plans. The project is set under a contract value between five and ten million dollars, with a response deadline of June 18, 2025. The work is governed by the solicitation RFP #01-087 issued by the City of Roseville, Michigan, with the project location in California.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMichigan → City of Roseville
ContactsNo contacts available
OfficeN/A
Organization / AgencyMichigan → City of Roseville
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Base Bid Scope of Work Contractor to provide all wiring, bolting, hardware, and equipment for the installations listed below. The Level 3 charging equipment requires fiberoptic connections between the units being installed. Contractor to include fiber-optic connectivity as part of their scope. All commissioning coordination to be included as part of the contractor’s work. Product to be tested, calibrated, and delivered in fully functional state to the City upon completion. The City (or City consultant, Construction Manager) will submit for permitting. Contractor must maintain a faithful construction bond. The project may need to be completed in up to 3 mobilizations. 1. Install 6 PCS charging units (ABB 6AGC081325) 6 PCS units have been purchased by City Per ZEBD Phase 2 plans: Install PCS # 4,5,8,9,10,11 2. Install 21 EVD dispensing units (ABB 6AGC08140) associated with the 6 PCS units 18 EVD units have been purchased by City 3 EVD units to be purchased by contractor to match existing equipment. 3. [REVISED] Purchase and Install 16 Level 2 chargers (Updated 5/27/25 to Ford FPC-AC0048ZC-U) and associated equipment. 16 Level 2 chargers 8 pedestal mounts with dual retraction (Ford Pedestals FPC-PO0096DZ-UAA – dual sided) 2 pedestal power distribution panels 2 transformers Power, data conduits, and wiring per ZEBD Phase 2 plans. Associated trenching, concrete, and asphalt works. 4. Install 58 protective bollards (4” Concrete Filled) Area where bollards to be installed is paved and has substantial electrical infrastructure under the pavement. Bollards will require shallow footings in some areas and must be vacuum excavated. After installation of the footings, the areas will need to be restored with AC pavement. Contractor to match existing 4” diameter 48” tall bollards, painted yellow, with reflective banding. Contractor to provide all materials. Add-Alternate Scope of Work As an optional add-alternate service: 5. Install 17 wheel stops in existing parking area part of the ZEBD fleet parking area. Contractor to provide (17) wheel stops matching existing parking at north row of fleet parking area. 6. Purchase and install 2 PCS charging units (ABB 6AGC081325) 2 PCS units to be purchased by Contractor Per ZEBD Phase 2 plans: Install PCS # 6,7 7. Purchase and install 4 EVD dispensing units (ABB 6AGC08140) 4 EVD units to be purchased by Contractor

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS