This Solicitation opportunity from California was posted on May 24, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Mapleview Street Green Streets Project - Project Plans: Construction plans and technical specifications for the Mapleview Street Green Streets Project in Lakeside, California. The document includes an index of 66 sheets covering demolition, improvement plans, driveway profiles, storm drain details, erosion control, traffic control, and irrigation/planting plans. It contains specific construction notes, curb data, and irrigation requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Mapleview Street Green Streets Project - Project Plans: Technical project plans and construction specifications for the Mapleview Street Green Streets Project for the County of San Diego Department of Public Works. The document includes detailed construction notes, irrigation notes, curb data, and hydroseed mix specifications, focusing on biofiltration basins, ADA curb ramps, and landscape infrastructure.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for PWG-00404 Mapleview Street Green Streets Geotechnical Evaluation: A geotechnical evaluation report dated October 31, 2019, prepared by Ninyo & Moore for Rick Engineering Company regarding the Mapleview Street Green Streets project (County of San Diego Project No. PWG-00404). The document provides subsurface exploration data, infiltration test results, and detailed engineering recommendations for earthwork, foundations, retaining walls, and pavement design to support the construction of sidewalks, curbs, and storm water infiltration devices.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 11752 Addendum 6 - Revision Plan Sheets: This document is Addendum 6 for RFB 11752, containing revised plan sheets and technical specifications. It includes demolition notes, a legend for pavement and sidewalk removal, and a plan view for Station 47+02 (Driveway 4) with a revision dated 6/27/2022.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 11752 Bid Schedule (Addendum 6): This document is a Bid Schedule associated with RFB 11752 (Addendum 6), identified by SharpeSoft#1023740. It contains a detailed list of 83 line items for a construction project, including estimated quantities and units of measure for materials such as bioretention soil, concrete, asphalt, piping, and landscaping plants. The document serves as the pricing sheet for bidders to provide unit and total prices.
PDF
PDF, High priority: read this firstaward
HighAI Summary for RFB 11752 - Mapleview Street Green Streets: Notice of Intent to Award and bid abstract for solicitation RFB 11752 (Project No. 1023740) regarding the Mapleview Street Green Streets project in Lakeside, California. The document identifies Tri-Grp Construction & Dev as the apparent low bidder with a total bid of $3,298,203.00. It includes a detailed bid schedule with unit prices for items such as traffic control, site management, and biofiltration basin materials, dated July 11, 2022.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 11752 - Mapleview Street Green Streets Addendum No. 1: Addendum No. 1 dated June 1, 2022, for RFB 11752 (Mapleview Street Green Streets). This document provides a clarification regarding pre-qualification requirements, stating that pre-qualification is required for bids solicited after June 30.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 11752 - Mapleview Street Green Streets Addendum No. 2: Addendum No. 2 dated June 8, 2022, for RFB 11752 regarding the Mapleview Street Green Streets project. This document provides Q&A regarding school session work hours, modifies the self-performance requirement from 50% to 30% of the total contract price, updates notification requirements for residents and businesses, and provides sample 'doorknob' notices for construction activity.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 11752 - Mapleview Street Green Streets Addendum No. 3: Addendum No. 3 for RFB 11752 (Mapleview Street Green Streets), issued by the County of San Diego on June 15, 2022. The primary purpose of this document is to notify bidders that the bid opening date has been changed to July 7th, 2022, at 2:00pm Local San Diego Time.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 11752 - Mapleview Street Green Streets Addendum No. 4: Addendum No. 4 issued on June 24, 2022, for RFB 11752 (Mapleview Street Green Streets). This document provides a series of questions and answers to clarify bid item assignments, specifically regarding clearing and grubbing, water meter charges, and asphalt dikes. It also notifies bidders of upcoming amendments to the bid schedule and specifications regarding traffic striping and utility box adjustments.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 11752 - Mapleview Street Green Streets Addendum No. 5: Addendum No. 5 dated June 24, 2022, for RFB 11752 (Mapleview Street Green Streets). This document provides a series of questions and answers (Q1-Q7) clarifying technical specifications for soil amendment, weed germination, wood mulch quantities, pipe conduit materials, irrigation water service charges, ball valve sizing, and seed rate calculations.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 11752 - Mapleview Street Green Streets Addendum No. 6: Addendum No. 6 dated June 29, 2022, for RFB 11752 (Mapleview Street Green Streets). It introduces technical specifications for non-perforated plastic pipe underdrains, adds a Caltrans Permit, and modifies critical project terms including the beginning of work, completion timeline (195 working days), liquidated damages ($3,000/day), order of work sequence, and traffic maintenance requirements.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFB 11752 - Mapleview Street Green Streets Addendum No. 7: Addendum No. 7 for RFB 11752 (Mapleview Street Green Streets), dated July 1, 2022. It updates the bid opening date to July 11, 2022, at 2:00pm, provides clarifications on seed mix pricing, roadway excavation, and steel casing specifications, and modifies the Claim Resolution Procedures in Section 6.3 of the Special Conditions.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 11752 - Mapleview Street Green Streets Oracle Project No. 1023740: Request for Bids (RFB 11752) issued by the County of San Diego Department of Public Works for the Mapleview Street Green Streets Oracle Project (No. 1023740). The document includes bidding instructions, a table of contents for contract documents, and a notice to contractors inviting sealed bids with a deadline of June 23, 2022. Key requirements include a 3% Disabled Veterans Business (DVB) participation goal and compliance with the Working Families Ordinance (WFO).
PDF
PDF, Low priorityspecifications
LowAI Summary for AIRX Project X210552 - Mapleview Street Relocation Potholing Report: A technical potholing report prepared by Utility Surveyors, Inc. (AIRX) for the Mapleview Street Relocation project in Lakeside, CA. The document details vacuum excavation procedures used to verify the depth and alignment of underground utilities, including a tabulation report of five potholes excavated between September 23 and September 24, 2021.
PDF
PDF, Low priorityother
LowAI Summary for Ashwood St PH – Lakeside Potholing Report: A technical potholing report prepared by Utility Surveyors, Inc. (AIRX) for the County of San Diego. The document details vacuum excavation procedures and provides a tabulation report of 28 potholes excavated between February 28 and March 7, 2019, to verify underground utility depths and alignments at Ashwood Street and Wildcat Canyon Road in Lakeside, CA.
PDF
PDF, Low prioritypermit
LowAI Summary for Caltrans Encroachment Permit - County of San Diego (11-22-NTK-0530): An encroachment permit issued by Caltrans to the County of San Diego dated June 1, 2022. It grants permission to enter the State Highway right-of-way on Route 67 in Lakeside to implement temporary traffic control for street improvements. The document outlines specific requirements for safety equipment, utility protection, inspection costs, and adherence to the California MUTCD and Caltrans Standard Specifications.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for EPIMS-SDO-12889-R5 - Mapleview Street Green Streets Project Notification: A notification letter dated September 2, 2020, from the California Department of Fish and Wildlife (CDFW) to the County of San Diego. The CDFW determined that the Mapleview Street Green Streets Project does not require a Lake or Streambed Alteration Agreement as it will not substantially adversely affect existing fish or wildlife resources.
PDF
PDF, Low priorityother
LowAI Summary for Mapleview Street Green Streets Project - MS4 Permit Correspondence: Email correspondence dated November 25 to December 11, 2020, between the County of San Diego Department of Public Works and the Regional Water Quality Control Board (RWQCB). The documents confirm that the Mapleview Street Green Streets Project is covered under the MS4 permit and will not require additional 401/404 process regulation, individual WDRs, or Streambed Alteration Agreements.
PDF
PDF, Low priorityspecifications
LowAI Summary for Project 19-1013: Mapleview St. Pothole Report: A technical pothole report dated September 26, 2019, prepared by technician Justin Soilz for C Below Subsurface Imaging. The document provides a detailed utility mapping summary for Mapleview St. & Pino Dr. in Lakeside, CA, including utility types (water, gas, electric, comm), sizes, materials, depths, and precise locations.
PDF
PDF, Low priorityplanholders-list
LowAI Summary for RFB 11752 Planholders List: A list of registered planholders for RFB 11752, detailing general contractors and subcontractors who have requested project documents. The list includes company names, contact persons, email addresses, physical addresses, and phone numbers, with entries dated between May and July 2022.
PDF
PDF, Low prioritydetermination-and-findings
LowAI Summary for SPL-2020-00429 Mapleview Street Drainage Improvement Project Approved JD: An Approved Jurisdictional Determination (JD) dated May 6, 2022, from the U.S. Army Corps of Engineers regarding the Mapleview Street Drainage Improvement Project (File No. SPL-2020-00429) in San Diego County. The Corps determined that waters of the United States do not occur on the project site, meaning the site is excluded from Clean Water Act Section 404 jurisdiction. The document includes the notification of administrative appeal options.
TXT
TXT
TXT
TXT
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.