This Solicitation opportunity from California was posted on July 31, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Addendum 1 to RFP 12644 Construction Manager-at-Risk: This document is Addendum No. 1 dated August 16, 2023, for RFP 12644 regarding the Construction Manager-at-Risk with a Guaranteed Maximum Price for the Crash Golden Hill House Renovation Project by the County of San Diego. It provides clarifications and answers to questions from prospective proposers, including confirmation that the CMAR cannot self-perform work, details on attachments and documents, requirements for office trailers, watchman services, heating/cooling costs, power service fees, property use during construction, construction schedule phases, fee entitlements, and submission guidelines. The addendum forms part of the contract documents and modifies the original RFP only as stated.
PDF
PDF, High priority: read this firstsurvey-report
HighAI Summary for Asbestos and Lead Survey Report for CRASH - Golden Hill House: This document is a pre-work asbestos and lead survey report dated May 13, 2019, for the CRASH - Golden Hill House located at 2410 E Street, San Diego. Conducted by the County of San Diego's Department of Environmental Health, the survey evaluates asbestos and lead-based paint presence prior to HVAC installation and ADA renovations. The report summarizes findings from current and past surveys, identifying asbestos in metal HVAC duct seam tape and roofing penetrations, and lead-based paint in various exterior and interior components of the Main House and Carriage House. It includes recommendations for contractor awareness and precautions to mitigate exposure risks during renovation work. The report does not provide an abatement scope but serves as a basis for developing one.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Attachment B Scope of Preconstruction Services: This document, titled Attachment B Scope of Preconstruction Services, outlines the preconstruction services to be provided during the schematic design, design development, and construction documents phases. It details collaboration with County representatives and the Architect/Engineer, preparation of construction cost estimates and schedules, investigation of existing conditions, identification of construction risk factors and mitigations, constructability review, verification of entitlements and permits, and preparation of the Guaranteed Maximum Price (GMP) package. The GMP package includes a signed cover letter, GMP, list of subcontractors and contract values, contractor's fee, general conditions fee, allowances, contract contingency, construction schedule, jobsite staff identification, and other related items. This scope is critical for defining preconstruction responsibilities and deliverables.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Attachment B Scope of Preconstruction Services: This document, titled Attachment B Scope of Preconstruction Services, outlines the preconstruction services to be provided during the schematic design, design development, and construction documents phases. It details collaboration with County representatives and the Architect/Engineer, preparation of construction cost estimates and schedules, investigation of existing conditions, identification of construction risk factors and mitigations, constructability review, verification of entitlements and permits, and preparation of the Guaranteed Maximum Price (GMP) package. The GMP package includes a signed cover letter, GMP, list of subcontractors and contract values, contractor's fee, general conditions fee, allowances, contract contingency, construction schedule, jobsite staff identification, and other related items. This scope defines critical preconstruction activities essential for project planning and cost control.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for County Agreement for Construction Manager at Risk - CRASH Golden Hill House Renovation: This document is a contract agreement between the County of San Diego and a contractor for the CRASH Golden Hill House Renovation Project. It outlines the terms for a Construction Manager At Risk contract with a Guaranteed Maximum Price. The agreement includes recitals, definitions, scope of work divided into two phases (Pre-Construction and Construction), contract documents, payment sums with a budget not-to-exceed $2,610,000, contract timeframes for each phase, liquidated damages for delays, and provisions for compensable delays. The contract references multiple exhibits including the statement of work, RFP, contractor's proposal, bonds, insurance, and warranty letter. The document is dated 2023 and reflects the formalization of the contract following the County's authorization and contractor's proposal submission.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for County Agreement for Construction Manager at Risk - CRASH Golden Hill House Renovation Project: This document is a draft County Agreement for a Construction Manager at Risk contract with a Guaranteed Maximum Price for the CRASH Golden Hill House Renovation Project in San Diego, California. Dated 2023, it outlines the contractual relationship between the County of San Diego and the Contractor, including recitals, definitions, scope of work divided into two phases (Pre-Construction and Construction), contract documents, payment sums, contract timeframes, liquidated damages, and compensable delay provisions. The agreement references multiple exhibits such as the Statement of Work, RFP, Contractor's Proposal, bonds, insurance requirements, and warranty letter. It establishes the terms for contract execution, payment limits, and timelines for project completion.
PDF
PDF, High priority: read this firstsurvey-report
HighAI Summary for Pre-Work Asbestos and Lead Survey Report for CRASH - Golden Hill House: This document is a pre-work asbestos and lead survey report dated May 13, 2019, for the CRASH - Golden Hill House located at 2410 E Street, San Diego. Conducted by the County of San Diego's Department of Environmental Health, the survey evaluates asbestos and lead-based paint presence prior to planned HVAC installation and ADA renovations. The report summarizes findings from current and past surveys, identifying asbestos in metal HVAC duct seam tape and roofing penetrations, and lead-based paint in various exterior and interior components of the Main House and Carriage House. It includes recommendations for contractor awareness and precautions to mitigate exposure risks. The report does not provide abatement scope but serves as a basis for developing such work.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 12644 Construction Manager-at-Risk for CRASH Golden Hill House Renovation: This document is the Request for Proposals (RFP) 12644 issued by the County of San Diego Department of General Services for Construction Manager-at-Risk services with a Guaranteed Maximum Price for the CRASH Golden Hill House Renovation Project. Dated July 31, 2023, it outlines the project scope including exterior, interior, and systems improvements to increase accessibility, functionality, and extend building life. The RFP details the project delivery method, budget not to exceed $2,610,000, schedule of events including pre-proposal conference, job walk, and proposal due date, and instructions for proposal submission. It also includes evaluation criteria, required forms, and contract terms. The project involves renovation work with considerations for asbestos and lead-based materials abatement.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 12644 Construction Manager-at-Risk for CRASH Golden Hill House Renovation: This document is the Request for Proposals (RFP) 12644 issued by the County of San Diego Department of General Services for Construction Manager-at-Risk services with a Guaranteed Maximum Price for the CRASH Golden Hill House Renovation Project. Dated July 31, 2023, it outlines the project scope including exterior, interior, and systems improvements to increase accessibility, functionality, and extend building life. The RFP details the project delivery method, budget not to exceed $2,610,000, schedule of events including pre-proposal conference, job walk, and proposal due date, and instructions for proposal submission. It also includes evaluation criteria, required forms, and contract terms. The project involves renovation work with considerations for asbestos and lead-based materials abatement.
PDF
PDF, High priority: read this firstpresolicitation
HighAI Summary for RFP 12644 Pre-Proposal Conference Slides for Construction Manager-at-Risk: This document contains the pre-proposal conference slides for Request for Proposals (RFP) 12644 regarding the Construction Manager-at-Risk with a Guaranteed Maximum Price for the Crash Golden Hill House Renovation Project. It includes introductions, agenda, important dates such as question and proposal due dates, overview of RFP instructions and rules, evaluation criteria, submittal items, and proposal submission instructions. The slides emphasize the RFP packet contents, confidentiality requirements, tax form obligations, and the necessity to check for addenda on BuyNet. The document is intended to guide potential offerors through the RFP process and ensure compliance with submission and evaluation requirements.
PDF
PDF, High priority: read this firstrepresentations-and-certifications
HighAI Summary for San Diego County Representations and Certifications Form 2022-09-30: This document is the Representations and Certifications form from the County of San Diego Department of Purchasing and Contracting, dated September 30, 2022. It requires offerors to certify business type, interlocking directorate disclosures, business representations including local business status and certifications, debarment and suspension status, related work disclosures, cost or pricing data accuracy, independent pricing, and additional disclosure obligations. The form must be completed, signed, and returned with the offer to provide goods and/or services, certifying the truthfulness of the information under penalty of perjury under California law.
PDF
PDF, Low priorityother
LowAI Summary for Attachment C Division of Costs: Attachment C Division of Costs outlines the allocation of Direct Pass-Through Costs, Contractor's Fee, and Owner costs for various project jobsite staff, cost of the work, job site temporary facilities, general requirements, and indirect and miscellaneous costs. The document includes detailed tables specifying which costs are direct pass-through, which incur contractor's fees, and which are paid by the owner. It serves as a cost division reference for the scope of services and any change orders related to the project.
PDF
PDF, Low priorityother
LowAI Summary for Attachment C Division of Costs: Attachment C Division of Costs outlines the allocation of Direct Pass-Through Costs, Contractor's Fee, and Owner costs for various categories including Project Jobsite Staff, Cost of the Work, Job Site Temporary Facilities, General Requirements, and Indirect and Miscellaneous Costs. The document details which costs are direct pass-through, which include contractor's fees (general conditions and fee), and which are paid by the owner. It serves as a cost division reference for the scope of services and any change orders related to a construction or project management contract.
PDF
PDF, Low prioritypreliminary-schedule
LowAI Summary for Golden Hill Crash House Renovation Preliminary Schedule: This document is the preliminary project schedule for the Golden Hill Crash House Renovation. It outlines the timeline for the project, including a 4-month pre-construction phase from November 1, 2023, to February 28, 2024, followed by a 5-month construction phase from March 1, 2024, to July 31, 2024. The schedule is presented in a tabular format showing task durations and start and finish dates.
PDF
PDF, Low prioritypreliminary-schedule
LowAI Summary for Golden Hill Crash House Renovation Preliminary Schedule: This document presents the preliminary project schedule for the Golden Hill Crash House Renovation. It outlines the timeline for two main phases: Pre-Construction lasting 4 months from November 1, 2023, to February 28, 2024, and Construction lasting 5 months from March 1, 2024, to July 31, 2024. The schedule is displayed in a tabular format showing task durations and start and finish dates.
PDF
PDF, Low prioritypreproposal-attendance-list
LowAI Summary for Preproposal Meeting Attendance List for Golden Hill House Renovation Project: This document is an attendance list for the preproposal meeting held on August 7 at 10:00 a.m. via Teams for the Construction Manager-at-Risk with a Guaranteed Maximum Price contract for the Golden Hill House Renovation Project. It includes contact information and representatives from various companies such as EC Constructors, Construction Support Services, Delt Strategy, Align Builders, and BNBuilders. The list provides names, phone numbers, email addresses, and company details of attendees.
PDF
PDF, Low prioritysite-visit-sign-in-sheet
LowAI Summary for Site Visit Sign-In Sheets 8-8-23 San Diego County: This document is a site visit sign-in sheet dated August 8, 2023, for the County of San Diego. It lists contact names, email addresses, company names, phone numbers, addresses, and supplier or staff designations of attendees. The sheet includes staff from various county departments such as HHSA and BHS, as well as external entities like CLASH. The County disclaims guarantee of the accuracy of the information contained.
TXT
TXT
PDF
PDF
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.