This Solicitation opportunity from Michigan was posted on July 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFP-171-260000002245-4 | 511/23420.JLM; Selfridge ANGB - Airfield Improvements

Closed
RFP-171-260000002245-4State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 3 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 4 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

The contract solicitation RFP-171-260000002245-4 is for comprehensive construction management services related to airfield improvements at Selfridge Air National Guard Base in Mt. Clements, Michigan, under File No. 511/23420.JLM. The project involves extensive physical upgrades including the construction of a north end runway extension and hammerhead turnaround with new PCC pavement and underdrainage, milling and overlay of existing runway shoulders and blast pads with HMA, replacement of runway pavements with new PCC and HMA sections, installation of new HMA shoulders, airfield electrical system updates including edge lighting, signage, PAPI, glideslope, localizer, ALCMS, and electrical vaults, runway grooving, utility structure replacements, grading and drainage improvements, pavement marking removal and reapplication, and tree clearing. The work is governed by state-level MICHSPEC standard construction contract documents, which include detailed General Conditions (Section 00700) and Supplementary Conditions (Section 00800) that structure contractual obligations, changes, cost adjustments, and documentation requirements instead of traditional FAR clauses. The contract has a not-to-exceed value of $140,940,000 and requires submission of proposals electronically through the State of Michigan’s SIGMA VSS system by July 30, 2026, at 2:00 PM Eastern Time, with proposals must be in PDF format derived from specific Excel templates and signed by an authorized official. The contractor must comply with stringent security requirements due to the base’s status as a closed installation under the Internal Security Act of 1950, requiring all personnel to be U.S. citizens or legal residents with authorized work status, undergo Criminal History Checks and National Agency Checks, complete AT Level I awareness training within ten days of contract start, and submit a full employee list five working days prior to site entry. Personnel qualifications are strictly defined, including mandatory certifications for airfield paving technicians, concrete paving CQC managers with eight years of experience and ACI certification, and registered professional engineers for structural submittals. Insurance and bonding obligations are extensive: performance and payment bonds for the full contract amount must be secured by sureties listed in the U.S. Treasury’s approved list, insurers must hold an “A” rating from A.M. Best and Class VII financial standing, be authorized to operate in Michigan by DIFS,

General Info

$140.9M airfield construction at Selfridge ANGB with strict security, certifications, and Michigan-specific contract rules.

Place of Performance

MI, USA

Set-Aside

NONE

Documents

20

4a-Runway 100% Drawings Part 12 - Grading and Site Plans

DOWNLOAD, High priority: read this firstspecifications
High

4a-Runway 100% Drawings Part 13

DOWNLOAD, High priority: read this firstspecifications
High

4a-Runway 100% Drawings Part 15 - Proposed Equipment and Installation Notes

DOWNLOAD, High priority: read this firstspecifications
High

4a-Runway 100% Drawings Part 5

DOWNLOAD, High priority: read this firstspecifications
High

4a-Runway 100% Drawings Part 9

DOWNLOAD, High priority: read this firstspecifications
High

Attachment A - Cost Details for Construction Manager Services

DOWNLOAD, High priority: read this firstcost-details
High

Mitigate Runway Encroachment Selfridge ANGB Specifications Contract Y24082

DOWNLOAD, High priority: read this firstspecifications
High

RFP 511.23420.JLM Construction Management Services for Selfridge Air National Guard Base

DOWNLOAD, High priority: read this firstrfp
High

Runway Encroachment Project 100% Final Drawings Part 1

DOWNLOAD, High priority: read this firstspecifications
High

Runway Encroachment Project 2 - Airfield Improvements 100% Final Drawings Part 16

DOWNLOAD, High priority: read this firstspecifications
High

Selfridge ANG Base Taxiway Alpha Extension 35% Design Drawings

DOWNLOAD, High priority: read this firstspecifications
High

State of Michigan Project Construction Management Contract Rev04-26

DOWNLOAD, High priority: read this firstcontract-document
High

4a-Runway 100% Drawings Part 10

DOWNLOAD, Low priorityother
Low

4a-Runway 100% Drawings Part 11

DOWNLOAD, Low priorityother
Low

4a-Runway 100% Drawings Part 14

DOWNLOAD, Low priorityother
Low

4a-Runway 100% Drawings Part 3

DOWNLOAD, Low priorityother
Low

4a-Runway 100% Drawings Part 6

DOWNLOAD, Low priorityother
Low

4a-Runway 100% Drawings Part 7

DOWNLOAD, Low priorityother
Low

4a-Runway 100% Drawings Part 8

DOWNLOAD, Low priorityother
Low

4a-Runway -100% Drawings_Part 4.pdf

DOWNLOAD

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMichigan → DTMB
Contacts2 people available
OfficeVarious, MI, USA
Organization / AgencyMichigan → DTMB
Office AddressVarious, MI, USA

Full Description

Show more
511/23420.JLM; Selfridge ANGB - Airfield Improvements

More opportunities from Michigan → DTMB

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS