RFP-171-270000000088-2 | 171/26426.TYC; Crowner Dr Garage-Restoration/Repairs

Active
RFP-171-270000000088-2State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This design-build contract, solicitation number 171/26426.TYC, is issued by the Michigan Department of Technology, Management and Budget (DTMB) for the restoration and repair of a metal cold storage building located at 7064 Crowner Drive in Dimondale, Michigan. The primary scope of work includes installing pressure-treated wood sill plates, replacing perimeter metal siding with pre-finished corrugated metal, and replacing windows with translucent panels. The project also includes two optional alternates: the replacement of prefinished metal roof panels and accessories, and the full replacement of electrical conduit, wiring, devices, and lighting fixtures. Bidders must provide a full-time on-site construction superintendent and submit construction drawings through 50 percent and 90 percent review sets. Bids are due by October 29, 2026, at 2:00 p.m. ET and must be submitted electronically via the SIGMA VSS portal. Submissions are limited to two attachments of 25 MB each, covering bid documents and qualified disabled veteran certifications. A five percent bid guarantee is required, and performance and payment bonds are mandatory for bids exceeding 50,000 dollars. Award decisions are based on a best-value determination considering price and qualitative factors, such as technical approach, personnel quality, and past performance, including any MIOSHA or OSHA violations within the last three years. The contractor must adhere to Michigan Electrical Code and prevailing wage requirements, and payment requests are permitted once every thirty calendar days following the acceptance of the project budget.

General Info

DTMB design-build contract for restoring a metal cold storage building in Dimondale, Michigan.

Place of Performance

MI, USA

Set-Aside

NONE

Documents

4

Crowner Drive Garage – Restoration/Repairs Design Build Contract

PDF, High priority: read this firstrfb
High

Crownner Drive Garage Restoration/Repairs - Addendum No. 1

PDF, High priority: read this firstamendment
High

Garage Restoration/Repairs, Crowner Drive Garage (DTMB 171/26426.TYC)

PDF, High priority: read this firstifb
High

Crowner Drive Garage Pre-bid Attendance Record

PDF, Low priorityattendance-record
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMichigan → DTMB
Contacts2 people available
OfficeVarious, MI, USA
Organization / AgencyMichigan → DTMB
Office AddressVarious, MI, USA

Full Description

Show more
171/26426.TYC; Crowner Dr Garage-Restoration/Repairs

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for the comprehensive interior modernization of Building 262, with potential options for Buildings 261 and 263. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces through repainting and the removal of vinyl wall coverings. Technical upgrades involve installing raised flooring, updating electrical distribution with simple dimming controls and new ballasts, replacing variable air volume systems, and installing new signage and safety stair treads throughout the facility. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using a best suited negotiate methodology, evaluating price alongside past performance and corporate relevant experience. The contractor is required to provide performance and payment bonds equal to 100 percent of the contract price and must adhere to strict federal standards, including ADA accessibility guidelines, Buy American requirements, and Davis-Bacon wage determinations. All proposals must be submitted electronically to the contracting officer by November 9, 2026, organized into separate price and technical volumes.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 15 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, and compressed air systems. Additionally, the work includes a full NFPA-compliant fire suppression system, electrical distribution and lighting upgrades, building automation controls, and site improvements such as paving, drainage, and hazardous materials abatement. The estimated contract value is between 10 million and 25 million dollars, with a performance period of 730 days after award. The award will be based on the lowest price, evaluated by combining the costs for building renovation and paving removal and replacement. Bidders must adhere to the Davis-Bacon Act and Buy American requirements. Bonding requirements are tiered, with proposals exceeding 150,000 dollars requiring bid, payment, and performance bonds. Technical compliance is mandatory across various standards, including ADA accessibility, MIL-STD-101 for piping identification, and specific cybersecurity requirements for facility-related control systems. Invoicing must be processed through Wide Area Work Flow and requires certification by a Quality Control Manager. Final acceptance is contingent upon on-site inspections and functional testing of fire protection and life safety systems.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 29 days
View Details
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation for DBE subcontractors issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency. Located in California, specifically within the Riverside or Los Angeles project areas, the solicitation is designated as a set-aside for Disadvantaged Business Enterprises. The response deadline is November 4, 2026, with the solicitation having been posted on October 25, 2026. To ensure project financing and bid responsiveness, contractors must strictly adhere to mandatory Good Faith Effort (GFE) requirements. Bids will be deemed non-responsive if proof of GFE #2, requiring online solicitation postings for 30 consecutive days and a one-day print newspaper posting, and GFE #5, requiring the utilization of the Small Business Administration and Minority Business Development Agency, are not submitted with the bid package. Additionally, documentation for GFE #1 regarding DBE outreach may be submitted up to three business days after the bid closing. Prime contractors are further required to ensure that any subcontractors they award also follow these GFE steps.
RT CONTRACTOR CORP

POSTED

about 3 hours ago

DEADLINE

in 9 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, standing-seam roofing, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business entities. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and project documents via Building Connected before the November 30, 2026 deadline.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted dormitory rooms, offices, and medical areas across three floors. The scope of work includes architectural repairs such as drywall replacement, painting, ceiling tile and flooring installation, rubber wall base installation, and electrical and plumbing repairs to restore the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days of the Notice to Proceed and final completion within an additional 15 days. The contract is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Award will be based on best value, evaluated through price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026, including a detailed cost breakdown, a 90-day bid guarantee, and proof of a Massachusetts Contractor's License. Compliance with the Davis-Bacon Act, NFPA-101 life safety codes, ADA, OSHA, and EPA regulations is mandatory. Final acceptance requires a one-year workmanship warranty, a 20-year product warranty for LVP flooring, and a release of liens from all subcontractors.
Grafton Job Corps

POSTED

about 3 hours ago

DEADLINE

in 22 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site preparation such as clearing, rock excavation, and grading, as well as the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building. Specialized requirements include rigid inclusions, load transfer mats, intrusion detection systems, and lightning protection, along with the demolition of 18 existing magazines and two buildings. The contract covers a wide array of trades, including demolition, abatement, concrete, masonry, structural steel, roofing, electrical, plumbing, and mechanical work. Infrastructure improvements involve the installation of primary and secondary electrical distribution systems, telecommunications, access roads, and paved loading areas, with specific requirements for wetland mitigation. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must contact Rahul Maheshwari by the response deadline of October 31, 2026, to receive bid invitations and access necessary documentation.
J & J Contractors, Inc

POSTED

about 3 hours ago

DEADLINE

in 5 days
View Details

More opportunities from Michigan → DTMB

Same awarding agency

NAICS: 561622
New
SLED
RFQ-171-260000000476-3 | 472/23158.TYC; Carson City C.F. - Lock and Controls Upgrades
Solicitation # 472/23158.TYC
Solicitation 472/23158.TYC is a State of Michigan construction project managed by the Department of Technology, Management and Budget for cell door locks and controls upgrades at the Carson City Correctional Facility. The scope of work includes selective demolition, the replacement of cell door controls and locks in Level IV Housing and Segregation Units, and security booth and control station upgrades. Technical requirements involve the installation of new ADA cell doors and the repurposing of doors from the Standish Correctional Facility, while utilizing temporary demountable partition systems to maintain facility occupancy during construction. The project also encompasses interior painting and the provision of training for maintenance personnel on the operation of the new hardware. Bids must be submitted electronically via the SIGMA VSS portal by October 28, 2026. Responsive bidders are required to provide a bid bond, non-collusion affidavit, and asbestos abatement attestation, with post-bid requirements including a current EMR rating and a project reference list of at least three similar projects completed within the last three years. Due to the secure nature of the facility, all personnel must obtain LEIN clearance and DTMB security approval. Award evaluation is based on the lowest responsive and responsible bidder, considering technical capability, financial resources, and past performance. The contract mandates compliance with prevailing wage rates and requires performance and payment bonds upon award.
Locksmiths

POSTED

1 day ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award