Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 1, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rfp 191700 Open Space Trail Maintenance

Closed
RFP 191700State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, and subsurface investigation; pipeline and utility work involving tunneling, boring, jacking, and cathodic protection; and surface improvements including asphalt paving, landscaping, and the installation of traffic signals and lighting. Additional requirements encompass environmental compliance through Storm Water Pollution Prevention (SWPPP), trucking, hauling, and the supply of materials such as ready mix and precast concrete. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise (DBE) firms, including MBE, VBE, and OBE certifications. Responsive bidders must hold a valid California Contractor's license and provide acceptable insurance. Furthermore, subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system, with a final bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

34 minutes ago

DEADLINE

in 20 days
NAICS: 237310
New
SLED
The Chickasaw County Board of Supervisors will receive sealed bids in the office of the County Purchase Clerk, 146 County Road 412, Houston, Mississippi 38851, until 10:00 A.M., 30, October, 2026, and thereafter publicly opened for the furnishing, haulin
Solicitation # 3170036833
The Chickasaw County Board of Supervisors is soliciting sealed bids for the furnishing, hauling, placing, and compacting of bituminous hot mix, as-needed base repairs, and the removal and replacement of roadway cross-drains within Chickasaw County, Mississippi. Under solicitation number 3170036833, the scope of work includes hot mix asphalt overlays and leveling using MDOT approved mixes, as well as minor and major base repairs and the installation of HP pipes ranging from 12 to 48 inches. Bids must be submitted by 10:00 A.M. on October 30, 2026, either electronically via Agencybidbank.com or delivered to the County Purchase Clerk in Houston, Mississippi. Physical submissions must be sealed and labeled with the specific bid title and the contractor's Certificate of Responsibility number. The contract will operate on a quantity unit pricing basis, with work assigned through individual work orders that must be completed within 45 calendar days of issuance. Accepted bid prices will remain valid for a 12-month period from November 2, 2026, to November 2, 2027. Contractors are required to coordinate with Mississippi 811 for utility location prior to any excavation and must adhere to the latest Mississippi State Highway Department Special Provisions for asphalt fuel adjustments. The Board of Supervisors reserves the right to reject any bids or waive formalities to serve the county's best interests. Primary administrative contact for this solicitation is Purchase Clerk Courtney Gann.
MPTAP

POSTED

about 2 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The contract involves trail maintenance work within several natural preserves managed by the City of Palo Alto, including the Palo Alto Baylands Preserve, Pearson Arastradero Nature Preserve, and Foothills Nature Preserve. The scope encompasses a variety of tasks such as grooming and reshaping existing trails, installing and repairing drainage features like dips, water bars, and culverts, and closing unauthorized trails through earth berms or other methods. Additionally, the work includes seeding and mulching disturbed areas, brushing and limbing vegetation, constructing wooden footbridges, and spreading crushed rock or oyster shells on trail surfaces. The project requires furnishing all necessary labor, equipment, supervision, and incidentals, with the project manager determining the specific trail tread materials at each site. The total project budget ranges from $500,000 to $1,500,000, and the work spans approximately 35 miles of trail across three preserves. The solicitation, titled RFP 191700, was posted on August 1, 2024, with a response deadline of August 15, 2024. The contract is managed by the Palo Alto Community Services Department under the NAICS code 237310, which pertains to highway, street, and bridge construction. The primary point of contact is Alice Harrison, reachable via email or phone. The project emphasizes flexibility in material selection, allowing for alternative proposals that meet the original specifications' intent, subject to approval by the City. The contract also references insurance requirements necessary for related work, including workers’ compensation, general liability, and automobile liability coverage, ensuring compliance with safety and risk management standards.

Documents

7

Attachment A - Proposer's Information Form

PDF, High priority: read this firstproposer-form
High

Attachment E - Cost Proposal: Open Space Trail Maintenance

PDF, High priority: read this firstspecifications
High

City of Palo Alto - Attachment F: Insurance Requirements

PDF, High priority: read this firstspecifications
High

City of Palo Alto - Sample Agreement for Professional Services

PDF, High priority: read this firstcontract-document
High

RFP 191700: Open Space Trail Maintenance

PDF, High priority: read this firstrfp
High

RFP 191700 Scope of Work - Open Space Trail Maintenance

PDF, High priority: read this firstsow
High

Attachment D - Firm Experience Qualifications

PDF, Low priority1 page · past-performance
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Palo Alto Community Services Department
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The specifications or scope of work included have been prepared to describe the standard of quality, performance, and other characteristics needed to meet City requirements.  The City will accept alternative proposals of a designated material, product, thing, “or equal”, and will determine if such alternative proposals are satisfactory in meeting mandatory requirements or specification, and if the proposed alternative meets the intent of the original mandatory requirement. Contractor shall perform trail maintenance in the Palo Alto Baylands Preserve, the Pearson Arastradero Nature Preserve and in Foothills Nature Preserve. This includes furnishing all labor, equipment, supervision, transportation, tools, operating supplies, and incidentals to perform the work in accordance with the specifications and provisions of the contract. The Palo Alto Baylands trail system is approximately 10 miles of compacted dirt, crushed rock or oyster shells. The Foothills Nature Preserve trail system is 15.0 miles long and includes approximately 40 drainage dips. Pearson-Arastradero Nature Preserve trail system is 10.3 miles long and includes approximately 15 drainage dips and water bars. The work will consist of, but is not limited to (1) grooming existing trails, (2) reshaping existing drainage dips, (3) installing new drainage dips, water bars and culverts, (4) closing “outlaw trails” using earth berms and other methods as described below, and (5) seeding and mulching disturbed areas outside of the travelway, (6) brushing and limbing, (7) construction of replacement wooden foot bridges, and (8) spreading and compacting crushed rock and oyster shell on trail treads.  The project manager will make the determination of trail tread material to be used at each site.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS