This Solicitation opportunity from California was posted on April 16, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for County of San Diego Board Policy G-15 Amendment - Flagpole Policy: Agenda item dated December 6, 2011, regarding the amendment of Board Policy G-15 (Design Standards for County Facilities and Property). The document establishes requirements for the installation of flagpoles at new County buildings and includes a sizing standards table correlating building height to pole height and flag size.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for County of San Diego Design-Build Contract: A formal agreement between the County of San Diego and a Contractor for the design and construction of a project. The document includes a detailed table of contents covering scope of design-build responsibility, payment terms, bonds, insurance, warranties, and legal provisions. It references a primary RFP and incorporates several exhibits, including a Statement of Work and Proposed Plans.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Lakeside Branch Library Design-Build - Exhibit A Program Requirements: This document serves as the Basis of Design (BOD) and Program Requirements for the design-build construction of the new 16,900 SF Lakeside Branch Library. It details specific spatial requirements and functional needs for the Lobby, Community Room, Conference Room, Friends of the Library bookstore, and Great Room/Marketplace, including square footage allocations, A/V needs, and furniture, fixtures, and equipment (FFE) specifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Lakeside Branch Library Zero Net Energy Feasibility Analysis: A feasibility analysis dated December 10, 2018, for the Lakeside Branch Library to achieve Zero Net Energy (ZNE). The document provides technical specifications for photovoltaic (PV) requirements, estimating a need for 142,500 kWh/yr to achieve a net-positive goal. It includes energy consumption breakdowns, recommended RFP language for proposers, and detailed design assumptions regarding the building envelope and operational hours.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Lakeside Library Asbestos/Lead Pre-Demolition Survey Report: A February 4, 2019, hazardous materials report for the Lakeside Library (9839 Vine Street) conducted by the County of San Diego Department of Environmental Health. The report identifies asbestos in carpet mastic, plaster, window putty, and stucco, and assumes the roof contains asbestos. Lead levels were below 1.0 mg/cm2, though lead is still present. The document is intended for inclusion in bid proposal packages to inform contractors of necessary safety precautions and regulatory compliance (Cal/OSHA) prior to demolition.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Lakeside Library Audio Visual Scope of Work: Detailed Scope of Work (SOW) for the installation of Audio/Visual systems at the new Lakeside Library branch. The document specifies technical requirements for digital signage in the lobby, gaming areas, study rooms, conference rooms, and a community room, including specific hardware such as NEC displays, Crestron controllers, and Biamp servers.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Phase II ESA - San Diego County Library Lakeside Branch: A Phase II Environmental Site Assessment (ESA) report dated May 10, 2018, prepared by Kleinfelder for the proposed San Diego County Library Lakeside Branch (APN [phone hidden]). The document details the investigation of Recognized Environmental Conditions (RECs), including sampling methodology for soil, soil vapor, and groundwater to evaluate impacts from adjacent gas stations and historical agricultural use.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 9496 Addendum No. 1 - Lakeside Branch Library: Addendum No. 1 dated April 23, 2019, for RFP 9496 regarding the Design-Build Lakeside Branch Library for the Department of General Services. This document provides a revised schedule for proprietary meetings with Design-Build Entities (C.W. Driver, LLC, PCL Construction Services, Inc., and Turner Construction Company) scheduled for April 25, 2019.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 9496 Addendum No. 2 - Design-Build Lakeside Branch Library: Addendum No. 2 issued on April 24, 2019, for RFP 9496 regarding the Design-Build Lakeside Branch Library for the County of San Diego Department of General Services. This document revises the title of Exhibit D under Section C, 8.0 Technical Requirements and Specifications to 'Phase II Environmental Site Assessment and CEQA Mitigation and Reporting Program' and notes that Exhibit D has been reissued on BuyNet.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 9496 Addendum No. 3 - Design-Build Lakeside Branch Library: Issued May 3, 2019, by the County of San Diego, this addendum modifies RFP 9496 for the Design-Build of the Lakeside Branch Library. It includes four specific revisions regarding signage, battery storage infrastructure, safe room categories, and load growth factors. Additionally, it provides a detailed Q&A section addressing site permits, street improvements, ZNE modeling, building codes, acoustical requirements, and environmental mitigation.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 9496 Addendum No. 4 - Lakeside Branch Library: Addendum No. 4 dated May 6, 2019, for RFP 9496 (Design-Build Lakeside Branch Library). This document provides the schedule for Mid-Course review meetings on May 13, 2019, including specific time slots for PCL Construction Services, Turner Construction Company, and C.W. Driver, LLC. It specifies that agendas must cover Design Development of Site and Building and GMP Development.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 9496 Addendum No. 5 - Design-Build Lakeside Branch Library: Issued May 8, 2019, by the County of San Diego Department of Purchasing and Contracting, this addendum modifies RFP 9496 for the Design-Build Lakeside Branch Library. It includes a revision to indoor air quality standards (ANSI/ASHRAE 62.1-2007) and provides a detailed Q&A section addressing structural performance levels, roof loads, deflection criteria, geotechnical recommendations, subcontractor identification, and the scope of infrastructure installation for AV, IT, and RFID systems relative to the Guaranteed Maximum Price (GMP).
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 9496 Addendum No. 6 - Design-Build Lakeside Branch Library: Issued May 21, 2019, by the County of San Diego, this addendum modifies RFP 9496 for the Design-Build of the Lakeside Branch Library. Key revisions include updates to structural design specifications, Title 24 energy requirements, program requirements for study rooms and catering kitchens, and the scheduling of second mid-course review meetings for specific DBE teams. It also includes a Q&A section addressing FF&E allowances, material testing scope, and mechanical system requirements.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 9496 Addendum No. 7 - Design-Build Lakeside Branch Library: Issued May 24, 2019, by the County of San Diego Department of Purchasing and Contracting, this addendum modifies RFP 9496 for the Design-Build Lakeside Branch Library. It includes a revision to ventilation requirements (prohibiting mechanically designed naturally ventilated openings) and provides answers to seven proposer questions regarding parking stall lengths, floodplain status, contract duration, trash enclosures, window treatments, acoustic requirements, and utility surveys.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 9496 Addendum No. 8 - Design-Build Lakeside Branch Library: Addendum No. 8 dated June 4, 2019, for RFP 9496 regarding the Design-Build Lakeside Branch Library. Key changes include increasing the Guaranteed Maximum Price (GMP) to $14,350,000.00 and rescheduling proposal presentations to June 14, 2019. The document also provides clarifications via Q&A regarding HVAC energy use, design milestones, EV charging stations, indoor temperature requirements, and storm water management.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 9496 Addendum No. 9 - Design-Build Lakeside Branch Library: Addendum No. 9 dated June 5, 2019, for the County of San Diego's RFP 9496 regarding the Design-Build Lakeside Branch Library. This document provides clarifications via a Q&A format concerning LEED v4 compliance, Value-Added Enhancements, allowance processing procedures, and Zero Net Energy (ZNE) calculations for electric vehicle charging stations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 9496 Attachment A - Parcel Map: This document is Attachment A to RFP 9496, providing a parcel map as part of the technical specifications for the procurement.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 9496 Attachment B - Geotechnical Report (Lakeside Library): A preliminary geotechnical investigation report prepared by Construction Testing & Engineering, Inc. for the County of San Diego. The document details subsurface conditions, field investigations (borings and percolation tests), and laboratory testing for the proposed construction of a one- to two-story library and associated improvements in Lakeside, California.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 9496 Attachment E: Lighting and Acoustics Design and Planning: This document provides technical design and planning specifications for lighting and acoustics in library environments. It details standards for bookstack illumination (minimum 6 ft-c), compares lighting schemes (parallel, perpendicular, indirect, and hybrid), and provides guidelines for general reading and staff areas, including glare reduction and ceiling height requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 9496 Attachment G - Library Built Casework: This document is Attachment G for RFP 9496, providing detailed specifications and descriptions for various interactive library panels and casework items from Burgeon Group. It describes educational tools such as the 'Counting Shapes' wheel, 'Word Maker', 'Mirror Mosaic', and 'LEED Panel', focusing on child development, sensory exploration, and literacy.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 9496 Attachment J - Document Submittal Requirements: This document outlines the detailed deliverables and submittal requirements for the Design Development (DD) and 60% Construction Documentation (CD) phases. It specifies required components for civil site plans, building floor plans, roof plans, sections, elevations, structural, MEP, and specialty consultant reports, as well as code analysis and energy reports.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 9496 Attachment T - Facilities Turnover Requirements: This document outlines the facilities turnover requirements for project close-out. It specifies the mandatory documentation required at substantial completion, including the System & Equipment List, as-builts, warranties, and O&M manuals. It provides detailed instructions on the organization of manuals, operating procedure documentation, and the submission process to the Facility Operations SMART Team, including a sample System Equipment List form.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 9496 - Design-Build Lakeside Branch Library: Issued April 16, 2019, by the County of San Diego, this Request for Proposals (RFP) seeks qualified design-build entities to construct a new 17,000 square foot branch library in Lakeside. The project has a Guaranteed Maximum Price (GMP) of $14,000,000. This is the second step of a two-step process, open only to pre-qualified firms from RFSQ 9030. The document includes detailed submittal requirements, evaluation factors, a statement of work, and a project timeline with a proposal deadline of June 12, 2019.
PDF
PDF, High priority: read this firstpresolicitation
HighAI Summary for RFP 9496 Design-Build Lakeside Branch Library Pre-Proposal Conference: Presentation slides from the April 25, 2019, Pre-Proposal Conference for RFP 9496 regarding the Design-Build of the Lakeside Branch Library for the County of San Diego. The document outlines the two-step procurement process, submission deadlines (June 12, 2019), evaluation criteria totaling 230 points, and project specifications including a $14M GMP and ZNE certification requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 9496 Exhibit E: County Networked Building Automation System Requirements: Technical specifications for the County of San Diego's networked Building Automation System (BAS) dated March 18, 2019. The document outlines requirements for BACnet protocol compliance, wiring standards, systems integration scope for electrical, gas, and water submetering, and a responsibility matrix for M&V infrastructure.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 9496 Exhibit F - Security and Life Safety: Dated November 14, 2018, this document serves as Exhibit F for RFP 9496, detailing technical specifications for security and life safety systems. It includes a comprehensive list of required security features (e.g., CCTV, access control, bollards) and specific hardware requirements for Fire Alarm Systems (FireLite, Notifier), Access Systems (Continental), Security Systems (Bosch), and CCTV Systems (Bosch).
PDF
PDF, High priority: read this firstsow
HighAI Summary for RFP 9496 - Q Woodside Street Improvements: The document is an attachment to RFP 9496 regarding the Q Woodside Street Improvements project, detailing the scope of work and technical requirements for the procurement.
PDF
PDF, High priority: read this firstsow
HighAI Summary for RFP XXXX Lakeside Branch Library - Basis of Design (BOD): This document establishes the Basis of Design (BOD) for the design-build construction of the Lakeside Branch Library. It outlines the overall design intent, operational requirements, and technical performance criteria, including a target size of 17,000 SF, Zero Net Energy (ZNE) goals, LEED Gold Certification requirements, and specific construction constraints such as noncombustible materials. It also details the Design-Build Entity's responsibilities regarding permitting, stormwater management, and coordination with the County Department of Public Works for street improvements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for S49293 - County of San Diego Signage Standards: This document establishes the policy and technical specifications for capital project construction signage and dedication plaques for the County of San Diego. It defines the requirements for listing elected officials and executive staff, provides guidelines for major capital project banners, and details the material specifications for bronze dedication plaques (e.g., Garamond font, satin bronze raised finish).
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for SnP.Network.007 - County Network Cabling Standards: This document (Revision 1.0) defines the technical standards for structured cable plants supporting Local Area Networks (LAN) and Voice connectivity for the County of San Diego. It specifies requirements for materials, infrastructure, design, installation, and certification, covering copper and optical fiber cabling, backbone distribution, and quality assurance in accordance with ANSI/TIA/EIA and IEEE standards.
PDF
PDF, Low priorityother
LowAI Summary for County of San Diego Board of Supervisors Policy F-23: This document outlines the County of San Diego's policy (F-23) regarding the inclusion of original works of art in public buildings with construction costs of $10 million or more. It establishes an artwork allowance of 0.5% of project costs (up to $500,000) and defines the committee-based procedure for selecting artists and approving designs.
PDF
PDF, Low priorityother
LowAI Summary for County of San Diego Board of Supervisors Policy G-15: This document outlines the County of San Diego Board of Supervisors Policy G-15, which establishes general principles and design standards for the construction and improvement of County-owned or leased facilities. It emphasizes green building practices, LEED certification for projects over 5,000 square feet, energy efficiency, resource conservation, and the creation of safe, healthy, and sustainable work environments.
PDF
PDF, Low priorityspecifications
LowAI Summary for Lakeside Community Plan: A community planning document for Lakeside, part of the San Diego County General Plan. Adopted August 3, 2011, it outlines goals and policies regarding land use, housing, circulation, public services, and conservation for the Lakeside community planning area.
PDF
PDF, Low priorityspecifications
LowAI Summary for RFP 9496 Attachment N - County Holidays: This document is Attachment N to RFP 9496, detailing Article 5.9 regarding County holidays. It lists the specific observed holidays, rules for holidays falling on weekends, and eligibility requirements for paid holiday compensation for regular biweekly employees.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for RFP 9496 Attachment O - Organizational Conflict of Interest Policy: This document outlines the County of San Diego's Organizational Conflict of Interest (OCI) policy for design-build projects. It defines what constitutes an OCI, lists specific instances of conflicts, and details the disclosure obligations for proposers and contractors to ensure impartial assistance and fair competition.
PDF
PDF, Low priorityother
LowAI Summary for Savings By Design Participant Handbook (2017-2018): The 2017-2018 Participant Handbook outlines the policies and procedures for the statewide Savings By Design (SBD) program in California. Administered by various utilities (PG&E, SDG&E, SCE, SoCalGas, SMUD, and LADWP), the program provides design assistance and financial incentives for nonresidential new construction projects that exceed Title 24 energy efficiency standards. The document defines key terms, eligibility requirements, and the different program approaches (Whole Building vs. Systems Approach) to promote energy-efficient building practices.
TXT
TXT
TXT
TXT
PDF
PDF
PDF
PDF
PDF
PDF
ZIP
ZIP
ZIP
ZIP
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.