This Solicitation opportunity from California was posted on July 24, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for County of San Diego Board Policy G-15 Flagpole Policy: An agenda item dated December 6, 2011, regarding the amendment of Board Policy G-15 (Design Standards for County Facilities and Property). The document establishes guidelines for the installation of flagpoles at new County buildings, including a sizing standards table that correlates building height (stories) to pole height and flag size.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for County of San Diego Design-Build Contract: A design-build contract agreement between the County of San Diego and a Contractor for the design and construction of a specified facility. The document includes a detailed table of contents covering scope of responsibility, payment terms, bonds, insurance, warranties, and legal provisions, and references various exhibits including the Statement of Work and RFP.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP #9032 Southeastern Live Well Center - Exhibit J Energy Requirements: Exhibit J of RFP #9032 for the Design-Build Southeastern Live Well Center. This document outlines the Zero Net Energy (ZNE) requirements, including energy efficiency standards, all-electric fuel type mandates, Title 24 compliance targets, and a requirement for net-positive electricity production capacity of 110% (minimum 1,170 MWh per year). It details expectations for the proposal and schematic design phases, including whole building energy modeling and peer review processes.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 9729 Addendum No. 1 - Design-Build Southeastern Live Well Center: Issued August 14, 2019, by the County of San Diego, this addendum modifies RFP 9729 for the Design-Build Southeastern Live Well Center. It includes revisions to parking stall dimensions and sustainability strategy mechanical requirements, provides additional reference materials (Electronic Certified Payroll and Civil Survey drawings), and includes a Q&A section addressing cost proposals, GMP budget priorities, and City of San Diego street improvements.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 9729 Addendum No. 2 - Design-Build Southeastern Live Well Center: Issued September 6, 2019, by the County of San Diego Department of Purchasing and Contracting, this addendum modifies RFP 9729 for the Design-Build Southeastern Live Well Center. It includes revisions to the Owners Design Criteria Report regarding program adjacencies (Food Pantry, Conference Center), public entry design, CEQA mitigation requirements for transportation/traffic, and sustainability strategy language. Additionally, it provides a Q&A section addressing fault hazard evaluations, grading limits, and GMP requirements for sewer and water connection fees.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 9729 Addendum No. 3 - Design-Build Southeastern Live Well Center: Issued September 11, 2019, by the County of San Diego Department of Purchasing and Contracting, Addendum No. 3 modifies RFP 9729 for the Design-Build Southeastern Live Well Center. The document includes revisions to the project schedule, mechanical design criteria (NC levels), vibration control standards, and facility security lighting. Additionally, it provides a detailed Q&A section addressing technical clarifications on insurance, building codes (2019 CBC), HVAC requirements, and plumbing material specifications.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 9729 Addendum No. 4 - Design-Build Southeastern Live Well Center: Issued September 23, 2019, this addendum modifies RFP 9729 for the Design-Build Southeastern Live Well Center. It includes technical revisions to electrical, mechanical, and security design criteria, updates to the public health equipment list, and replaces workstation typicals. Notably, it updates the terminology from 'Owner's Authorized Representative' to 'Contracting Officer's Representative' and reschedules proposal presentations to October 21, 2019. The document also provides a Q&A section addressing traffic mitigation and median construction requirements.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 9729 Addendum No. 5 - Design-Build Southeastern Live Well Center: Addendum No. 5 dated October 4, 2019, for RFP 9729 regarding the Design-Build of the Southeastern Live Well Center for the County of San Diego. Key changes include a revised proposal due date of October 16, 2019, updates to energy code requirements (15% better than current California Energy Code), revisions to the Building Automation System (BAS) submittal requirements, and a revised Evaluation Factors table. It also includes a Q&A section addressing equipment installation, pedestrian pathway modifications, and lighting loads.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 9729 Addendum No. 6 - Design-Build Southeastern Live Well Center: Issued October 9, 2019, by the County of San Diego, Addendum No. 6 modifies RFP 9729 for the Design-Build Southeastern Live Well Center. Key changes include revised requirements for Local Business/Worker Participation (Item 3.12 and 3.10), introducing a minimum 3% at-risk commitment of the GMP for local participation, a new Community Communications Plan requirement, and updated Evaluation Factors and Building Automation System (BAS) requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 9729 - Attachment A: Parcel Maps and Survey: Attachment A to the Request for Proposals for the Design-Build Southeastern Live Well Center. This document provides parcel maps, legends, and survey data for APN 548-040-08 & 09 in San Diego, CA, including easement information and preliminary report data dated April 25, 2017.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 9729 - Attachment B: Geotechnical Report (Southeastern Live Well Center): A geotechnical evaluation report dated November 7, 2018, prepared by Rick Engineering for the proposed Southeastern Live Well Center in San Diego, California. The document provides subsurface evaluations, laboratory testing results, and detailed engineering recommendations for earthwork, seismic design, foundations, and drainage to support the design-build procurement process.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 9729 - Attachment E: Preliminary Title Report: A preliminary title report dated April 25, 2017, issued by First American Title Insurance Company for the Design-Build Southeastern Live Well Center project. The document provides the legal description of the property (APN 548-040-06 & 07) in San Diego, CA, identifies the vested owner as Jacobs Center for Neighborhood Innovation, and lists specific exceptions to coverage, including tax liens and various easements.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for RFP 9729 Attachment F: Labor Compliance and Prevailing Wages Guidelines: Dated January 2019, this document provides guidelines for Labor Compliance and Prevailing Wages (LCPW) for a Design-Build Entity. It outlines the responsibilities of the County Department of General Services (DGS) and the contractor regarding DIR registration, monitoring of prevailing wages, and the submission of required labor compliance forms (such as DAS 140, DAS 142, and eCPRs). It specifies that invoices will not be approved until all labor compliance documentation is complete.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 9729 Design-Build Southeastern Live Well Center: Issued July 24, 2019, by the County of San Diego, this Request for Proposals (RFP) seeks a design-build entity to construct the Southeastern Live Well Center. The project involves an 80,000 sq ft building with a GMP estimate of $58 million, targeting LEED Gold and Zero Net Energy certification. This is the second step of a two-step procurement process, open only to pre-qualified entities from RFSQ 9032. Proposals are due October 10, 2019.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 9729 Exhibit F - County Networked BAS System Requirements: Technical specifications for the County of San Diego's networked Building Automation System (BAS) dated December 20, 2018. The document outlines requirements for BACnet protocol compliance, systems integration (HVAC, lighting, metering), metering specifications for water, electric, and gas, JACE equipment standards, and integration protocols using the Niagara 4 framework.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 9729 Exhibit G - County FAACS Guidelines: Dated June 2019, this document provides technical guidelines and brand-specific requirements for Fire Alarm, Access Control, and Security (FAACS) systems for the County of San Diego, specifically for the Southeastern Live Well Center project. It details requirements for CCTV (Bosch), Call Systems (AIPhone), Access Systems (Continental), and Security Systems (Bosch), emphasizing compatibility with existing County infrastructure.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 9729 Exhibit H - Facility Security Design Guidelines: Exhibit H provides comprehensive facility security design guidelines for the County of San Diego, specifically for the Southeastern Live Well Center project. It outlines a five-layer progressive security model and provides detailed technical specifications for site layout, fencing, bollards, streetscape elements, and vehicle barriers to ensure a secure and integrated facility.
PDF
PDF, High priority: read this firstindustry-day
HighAI Summary for RFP 9729 Pre-Proposal Conference Slides - Southeastern Live Well Center: Presentation slides from the August 1, 2019, Pre-Proposal Conference for RFP 9729 regarding the Design-Build of the Southeastern Live Well Center for the County of San Diego. The document outlines the two-step procurement process, proposal submission deadlines (October 10, 2019), evaluation criteria (totaling 200 points), and project overview for the 80,000 SF facility with an estimated GMP of $58,000,000.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 9729 Section C Attachment H - Local Zip Code Map: Attachment H of Section C for RFP 9729 (Design-Build Southeastern Live Well Center), providing the local zip code map used to determine local business and worker participation.
PDF
PDF, High priority: read this firstsow
HighAI Summary for RFP 9729 Section C Attachment I - Civil Survey: This document is Attachment I to Section C of RFP 9729, detailing the technical requirements and scope for a Civil Survey. It provides specific instructions and standards for the survey work to be performed under the contract.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 9729 Section C Exhibit D - County Public Health Equipment List: This document is Exhibit D of RFP 9729, detailing the specific equipment and furniture requirements for a County Public Health facility. It includes detailed lists for Vaccine Rooms, Treatment Rooms, and Exam Rooms, as well as specific technical specifications for medical equipment such as Medline exam tables, McKesson incubators, centrifuges, and Nuline specimen refrigerators. It also outlines spatial requirements and workflow changes for nursing and clinician workstations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 9729 Section C Exhibit E - General Requirements: This document contains technical specifications for RFP 9729, specifically Section 011000 (Summary) and Section 013233 (Photographic Documentation). It outlines general requirements including site access, coordination with occupants, BMP compliance for the City and County of San Diego, and detailed administrative requirements for pre-construction and periodic photographic and video documentation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 9729 Section C Exhibit I - Document Submittal Requirements: This document outlines the specific submittal requirements for the Schematic Design (SD) phase of a design-build project. It details the necessary deliverables across multiple disciplines, including civil site plans, architectural floor plans, structural, MEP, code analysis, and cost estimates. It also specifies the required number of copies and the 30-day review period for the County.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for RFP 9729 Section C Exhibit M - Signage: This document establishes the standards and guidelines for capital project construction signage and dedication plaques for the County of San Diego. It defines policies for listing Board of Supervisors, elected officials, and executive staff on signage, provides specific requirements for major capital project banners, and includes detailed technical specifications for bronze dedication plaques, including materials, fonts, and dimensions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for S50973 Exhibit K - County Network Cabling Standards: This document (SnP.Network.007, Rev 1.0) defines the technical standards for structured cable plants supporting Local Area Networks (LAN) and voice connectivity for the County of San Diego. It provides detailed specifications for materials, design, installation, and certification of cabling systems, including riser cabling, fiber optics (single-mode and multi-mode), patch panels, and grounding. The document is intended for use by the County's outsourced IT contract vendors to ensure uniformity across all facilities.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Southeastern Live Well Center - Attachment C CEQA Mitigated Negative Declaration: This document is Attachment C to a Request for Proposals for the Design-Build of the Southeastern Live Well Center (Project No. 1021148). It contains the Final Mitigated Negative Declaration (MND) under the California Environmental Quality Act (CEQA), detailing Applicant Proposed Measures (APM) and required mitigation measures for biological and cultural resources to ensure no significant environmental effects occur during project implementation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Southeastern Live Well Center - Attachment G: WELL Certification Requirements: Dated January 4, 2019, this document outlines the WELL Building Standard certification requirements for the Southeastern Live Well Center design-build project. It details the core concepts of WELL v2, certification levels (Silver, Gold, Platinum), a feasibility study, estimated implementation costs, and the project timeline for performance verification. It includes a partial scorecard identifying specific air quality and ventilation features required for certification.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Southeastern Live Well Center - Exhibit B County Furniture Standards: Dated December 2018, this document outlines the County Furniture Standards for the Southeastern Live Well Center design-build project. It provides detailed technical specifications for various office configurations, including Private Office standards (A, B, Manager, and Upper Management) and Systems Furniture cubicles, specifically referencing Steelcase products, finishes, and hardware requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Southeastern Live Well Center - Exhibit C: County Fitness Equipment Standards: Dated December 2018, this document establishes the fitness equipment standards for the Southeastern Live Well Center design-build project. It provides detailed technical specifications, product features, and dimensions for approved equipment, specifically highlighting Precor cardio machines including the TRM 731 Treadmill, EFX 731 Elliptical, and RBK 835 Recumbent Bike.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Southeastern Live Well Center - Owner's Design Criteria Report: Owner's Design Criteria Report (ODC) dated 06.06.19 for the Southeastern Live Well Center (SELWC) in San Diego. The document outlines the vision, program requirements, and technical design criteria for an approximately 80,000 sq ft office building and parking structure. It includes specific requirements for trauma-informed and restorative justice design, LEED Gold/Zero Net Energy sustainability goals, and detailed design criteria across multiple disciplines including civil, architectural, mechanical, and electrical.
TXT
TXT, Low priority1 page · award
LowAI Summary for PO 562055 - PCL Construction Services Inc: Purchase Order 562055 issued to PCL Construction Services Inc for DGS FY20/21 Phase 1 funding regarding the Southeastern Live Well Center in the amount of $134,059.00. Performance period is from 10/21/2020 to 12/20/2020.
PDF
PDF, Low prioritysupporting-documents
LowAI Summary for RFP 9729 - Attachment D: County Holidays: Attachment D of the Request for Proposals for the Design-Build Southeastern Live Well Center, providing a schedule of recognized County of San Diego holidays for the years 2020, 2021, and 2022.
LowAI Summary for RFP 9729 - Notice of Intent to Award - Southeastern Live Well Center: Notice of Intent to Award issued by the County of San Diego on February 18, 2020, for RFP 9729 (Design-Build Southeastern Live Well Center). The County intends to award the contract to PCL Construction Services, Inc., subject to successful negotiations. The notice remains posted for five business days until February 24, 2020.
PDF
PDF, Low priorityother
LowAI Summary for RFP 9729 Pre-Proposal Conference Sign-in Sheet: A sign-in sheet for attendees of the pre-proposal conference associated with RFP 9729. The document contains a table for capturing names, company names, emails, and phone numbers of participants.
ZIP
ZIP
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.