Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on May 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFP 2026-03 Charman Creek Restoration Phase 2

Closed
BC229594International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Sanitary Sewer & Recycled Water Project in CA
Solicitation # sanitary-sewer-recycled-water-project-ca
The Sanitary Sewer and Recycled Water Project in Colusa, California, involves the installation of approximately 13,000 linear feet of new sewer gravity mains, recycled water mains, and sewer force mains. The scope of work also includes the construction of sewer manholes and necessary surface restoration through pavement grinding and overlay. Garney Pacific, Inc. is acting as the contracting entity for this project, which is owned by the City of Colusa. The solicitation, categorized under NAICS code 237990 for heavy and civil engineering construction, is specifically designed to solicit subcontractor quotes and emphasizes participation from various small and disadvantaged business enterprises, including WOSB, HUBZone, VOSB, and SDVOSB firms. Subcontractors interested in bidding must submit their quotes electronically through the Garney Pacific website by the deadline of September 1, 2026, at 3:00 PM PT. Key contractual requirements include the mandatory use of union labor and the provision of 100% payment and performance bonds from a U.S. Department of the Treasury Circular 570 listed surety company, though the prime contractor has agreed to reimburse bond premiums. Bidders are required to use Garney’s standard purchase order and subcontract forms, with the option to submit redlines for review. While specific evaluation factors and total contract value are not disclosed in the solicitation, the project places a strong emphasis on meeting or exceeding Disadvantaged Business Enterprise (DBE) participation goals.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 10 days
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project is a firm-fixed-price solicitation issued by the U.S. Army Corps of Engineers Honolulu District. The scope of work includes mobilization and demobilization, dredging and ocean disposal of approximately 4,260 cubic yards of material, and repairs to the revetted mole involving clearing, grubbing, stone rework, and the installation of new stone. The project is located in Haleiwa, Oahu, Hawaii, and has an estimated contract value between $1,000,000 and $5,000,000. The performance period is set for 200 calendar days from the date of the Notice to Proceed. This solicitation is a sealed bid process intended for small businesses, including various set-asides such as Small Disadvantaged Business, Women-Owned Small Business, HUBZone, and Veteran-Owned Small Business. Contractors are required to provide several key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom are subject to government approval. Strict adherence to safety standards, specifically USACE EM 385-1-1, is mandatory, and contractors must submit an Accident Prevention Plan and monthly exposure reports. Quality control is managed through a three-phase inspection process, and materials like stone must meet specific ASTM international standards. Additionally, bidders must furnish a bid guarantee and provide performance and payment bonds. The contract is subject to the Davis-Bacon Act regarding prevailing wages, and liquidated damages are set at $2,297 for each calendar day of delay.
Healy Tibbitts Builders, Inc.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is soliciting subcontractor bids for the SBWRP Reverse Osmosis System project located in San Diego, California. The project, owned by the City of San Diego, involves the design and removal of existing trailer-mounted Electrodialysis Reversal (EDR), slab-mounted Membrane Filtration (MF), and Reverse Osmosis (RO) units. These will be replaced with new slab-mounted MF and RO units to create a demineralization facility at the South Bay Water Reclamation Plant, specifically aimed at reducing the total dissolved solids in reclaimed water. The estimated bid value for this project is $19,300,000.00. Garney Pacific is seeking quotes for a wide range of trades, including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. As a general contractor, Garney Pacific, Inc. is actively seeking participation from SLBE and ELBE firms, including those with DBE, MBE, WBE, or SBE certifications. The solicitation includes various set-aside categories such as Small Business, Women-Owned Small Business, and Veteran-Owned Small Business. All selected subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. While Garney will reimburse subcontractors for required bond premiums, bidders must provide their bond rate at the time of their quote. The basis of contracting will be the Garney Standard Purchase Order and Subcontract forms. The deadline for bid submissions is August 27, 2026, by 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The Town of Gibsons is seeking a proponent to deliver Phase 2 of the Charman Creek Restoration project, involving the removal of existing concrete weirs and channelized structures, followed by the ecological restoration of the creek using natural cobbles and boulders. The scope includes replacing two 1200 mm circular concrete culverts with 2100 x 1200 mm embedded box culverts supplied by the owner, the removal of invasive plant species and select trees, and the planting of native riparian vegetation to enhance habitat and stream stability. A key requirement is the retention of a qualified Environmental Monitor by the successful bidder to ensure strict adherence to all applicable permits, environmental reports, and municipal bylaws throughout construction. Mobilization for instream work must be ready to commence no later than August 1st, 2026, to align with the least risk hydrological window. Proposals must be submitted by June 12th, 2026, under solicitation number BC229594, with all technical and compliance details to be reviewed via the provided municipal tender portal.

General Info

Ecological restoration of Charman Creek with culvert replacement, habitat enhancement, and environmental monitoring.

Agency

Government of Canada → Town of Gibsons

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Town of Gibsons
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Town of Gibsons
Office AddressN/A
Contacts
Contracting Authority

Full Description

Show more
Removal of concrete weirs and channelization, restoration of creek with natural cobbles and boulders, replacement of existing 1200 mm circular concrete culverts with Owner supplied 2100 x 1200 mm embedded box culverts, invasive plant removal, tree removal, and riparian planting. This work will require retention of a project Environmental Monitor by the successful proponent to ensure compliance of construction with relevant permits, reports, and bylaws. The chosen proponent will need to be able to mobilize to start instream works for the start of the least risk window on August 1st, 2026. Please refer to the following link:https://urbansystems.bidsandtenders.ca/Module/Tenders/en/Tender/Detail/1d011f1b-2404-45ea-a7c4-46f99672b9c1#