RFP 25-024 Aeration Equipment Replacement - Belton, MO
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Belton is seeking proposals for RFP 25-024 to procure and install new equipment for two aerators at its wastewater treatment plant. The scope of work requires the contractor to provide two 30 HP motors, 64 aerator discs, two pillow block bearings, two gearboxes with mounting hardware, and two gearbox/shaft adapter assemblies including belts. The contractor is also responsible for all crane rentals, start-up, and testing, while city staff will handle the removal and disposal of existing equipment. Interested bidders must attend a mandatory pre-bid meeting on either November 13 or November 18, 2025, to be eligible for submission. Sealed proposals must be delivered to the City of Belton Public Works Facility by 10:00 a.m. on the deadline date. Each bid must include a bid bond or certified check for at least 5 percent of the maximum total bid price, and bids remain valid for 60 days following the opening.
General Info
Place of Performance
Belton, MO, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (12)
See All 12 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
Sealed proposals will be received by the Assistant City Manager/Public Works Director of the City of Belton at the City of Belton Public Works Facility located at 700 Seabee Road, Belton, Missouri, 64012 at the Administration Building (Building A) until the above time. All bids will be opened and read aloud. A late Proposal Packet is one received after 10:00 a.m., local time, at the time and place of the opening as stated. The decision as to the correct time for the openings shall be made by the Assistant City Manager/Public Works Director of the City of Belton and that decision shall be final. Proposals received after the deadline date and time will be returned unopened. It shall be the responsibility of those submitting a proposal to assure themselves that their proposal has been received by the City of Belton.
Project Description
This project involves the selection of a Contractor to procure and install all new equipment for two aerators at the wastewater treatment plant. The scope includes providing two (2) new 30 HP motors, sixty four (64) aerator discs, two (2) pillow block bearings, two (2) gearboxes, two (2) gearbox mounting hardware, and two (2) gearbox/shaft adapter assemblies including belts. The Contractor shall include all necessary crane rental, start-up, and testing of each unit. Removal and disposal of existing equipment will be completed by City staff.
The Contractor shall bid on all work. All equipment, materials, and workmanship must be in accordance with the Specifications and other Contract Documents.
RFP documents can be seen (viewing low resolution images online is free) or purchased for a non-refundable fee online at www.drexeltech.com in their online Plan Room. For access assistance, please contact Drexel directly by phone at +1 (555) 000-0000 or by email at contact@example.gov. Information regarding this RFP can be found in the “Public Jobs” link on Drexel’s website.
A copy of the City of Belton Design and Construction Manual may be downloaded at no cost from the City’s website at https://www.belton.org/Departments/Public-Works-Department/Design-and-Construction-Manual.
A mandatory Pre-Bid Meeting will be held on November 13, 2025, at 10:00 a.m., local time, and November 18, 2025, at 10:00 a.m., local time, at the City of Belton Wastewater Treatment Plant located at 21200 South Mullen Road, Belton, MO, 64012. Due to the importance of all bidders having a clear understanding of the specifications and scope of work requirements, bids will only be accepted from those who are represented at one of the Pre-Bid Meetings. Attendance at the Pre-Bid Meeting will be evidenced by the representative’s signature on the attendance roster. All bids must be accompanied by a Bid Bond from a surety or certified check from a bank acceptable to the Assistant City Manager/Public Works Director in the amount equal to or greater than 5% of the maximum total bid price. Prior acceptability of the proposed surety or bank furnishing the bid security before the bid date is recommended. An unacceptable bid security may be cause for rejection of the proposal. No bidder may withdraw his bid for a period of sixty (60) days after the date of opening of bids.
On all requests and correspondence, please reference RFP Number 25-024.
Requests for information related to this RFP should be directed to:
Matthew Wilson, Assistant Operations Superintendent
Telephone: +1 (555) 000-0000
E-Mail: contact@example.gov
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS