Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on December 8, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RFP #25-183 Design/Build Services for Spivey Trail Drainage Improvement Project

Closed
PE-63100-NONST-2026-000000078State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 11 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 12 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

Clayton County, Georgia is issuing a Request for Proposals (RFP) for qualified Proponents to provide Design/Build Services for the Spivey Trail Drainage Improvement Project. The RFP outlines a detailed Scope of Services for the project, with the county collaborating alongside the current medical examiner services contractor to develop the proposal requirements. The solicitation, identified as RFP #25-183, aims to address drainage issues in the specified area to improve infrastructure and manage stormwater effectively. The official posting date for the RFP was December 8, 2025, and proposals must be submitted by January 22, 2026, at 8:00 PM. The contracting agency is the Clayton County Board of Commissioners, and the project location is in Georgia. Interested parties can direct inquiries to the primary point of contact, Melissa Aguilar, by phone or email. Additional information and submission details are accessible through the state’s procurement website.

General Info

Clayton County seeks Design/Build proposals for Spivey Trail Drainage Improvement due January 22, 2026.

Documents

6

Exhibit A General Requirements for Clayton County Contract

PDF, High priority: read this firstsow
High

General Requirements Exhibit A for Contract 202512

PDF, High priority: read this first31 pages · supporting-docs
High

RFP 25-183 Design/Build Services Cost Proposal Form for Spivey Trail Drainage Improvement

XLSX, High priority: read this first1 page · rfp
High

RFP 25-183 Design/Build Services for Spivey Trail Drainage Improvement Project

PDF, High priority: read this firstrfp
High

RFP 25183 Design/Build Services for Spivey Trail Drainage Improvement Project

PDF, High priority: read this first111 pages · rfp
High

RFP 25-183 Proposal Cost Form for Spivey Trail Drainage Improvement Project

XLSX, High priority: read this firstproposal-cost-form
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Clayton County Board of Commissioners
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
This Request for Proposals (RFP) from qualified Proponents (Proponent or Proponents) is for Design/Build Services for Spivey Trail Drainage Improvement Project for Clayton County (County), Georgia. A detailed Scope of Services (SOS) is set forth in this RFP. The County has partnered with the current designated contractor for medical examiner services to develop this Request for Proposal.

More opportunities from Georgia → Clayton County Board of Commissioners

Same awarding agency

NAICS: 541614
New
SLED
RFP #26-149 Freight Cluster Plan for Clayton County, GA
Solicitation # 26-149
The Clayton County Board of Commissioners is soliciting proposals under RFP 26-149 for the development of Freight Cluster Plans for Clayton County, Georgia. The project focuses on a study area extending from Tara Boulevard in the west to Mt. Zion Boulevard in the east, and from State Route 138 in the south to Interstate 75 in the north. Key deliverables include a Project Management Plan, Stakeholder Engagement and Outreach Plan, Inventory and Assessment Report, Traffic Study Report, a fiscally constrained short-term action plan, and a long-term vision project list. The work is supported by the Atlanta Regional Commission (ARC) and is contingent upon funding from the Georgia Department of Transportation. Proposals must be submitted electronically via Bidnet by November 19, 2026. The evaluation process is weighted toward understanding the scope of services (25%), organizational qualifications (30%), and project management and personnel (30%), with financial capability (10%) and cost (5%) making up the remainder. Awardees must comply with E-Verify requirements, Title VI of the Civil Rights Act of 1964, and specific bonding and insurance standards. While the county encourages the use of small local businesses, there is no specific SLBE subcontracting goal for this project. Selected proponents will be required to provide comprehensive progress reports to the ARC and may be asked to participate in oral presentations between December 28 and December 31, 2026.
Process, Physical Distribution, and Logistics Consulting Services

POSTED

5 days ago

DEADLINE

in 23 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS