Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

RFP 26-13 Waterline and Curb Stop Upgrades project

Active
234620International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The District of Fort St. James is soliciting proposals for the Waterline and Curb Stop Upgrades project, which involves the replacement of water service lines and associated infrastructure in British Columbia. The scope of work spans two years, with 2027 activities scheduled between May 1st and August 1st. Key deliverables include the replacement of 170 water service lines, 11 hydrants and 5 hydrant valves, and 86 sanitary sewer pipe connections across 2027 and 2028. The District will supply all primary materials, including pipes, valves, and aggregates, while the successful proponent is responsible for on-site hauling of materials and the disposal of old components. To ensure quality control, a site Superintendent or Project Manager must be present for the duration of the project, and water disruptions are strictly limited to the hours of 9:00 am and 3:00 pm. Proposals must be submitted in English by October 30, 2026, and must include a signed Submission Declaration, the completed Proposal Response Form, and proof of liability insurance and WCB/WorkSafe coverage. Mandatory criteria for consideration include meeting the minimum specifications in Appendix C and providing evidence of relevant experience and qualifications. The contract will be awarded to the proponent who meets all mandatory requirements and achieves the highest overall ranking, with reference checks conducted on a pass-fail basis. Invoicing for the project must be submitted based on actual quantities performed.

General Info

Proposals for water service line and infrastructure upgrades in Fort St. James.

Documents

3

District of St. James Water Distribution System Record Drawings

PDF, High priority: read this firstspecifications
High

RFP26-13 Water Service Line and Curb Stops 2027-2028

DOCX, High priority: read this firstrfp
High

RFP26-13 Waterline and Curb Stop Upgrades - App B

DOCX, Low prioritysubmission-form
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyProvince of British Columbia → District of Fort St James
ContactsNo contacts available
OfficeCAN
Office AddressCAN
ContactsNo contact information available

Full Description

Show more
RFP 26-13 Waterline and Curb Stop Upgrades project

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and pump system, the construction of two soil cement lined sludge dewatering ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is set aside for small businesses, including certified DBE, MBE, and WBE firms, across a wide range of NAICS codes related to heavy and specialty construction. Interested parties must submit their responses by October 21, 2026. Primary coordination for this solicitation is handled by Christina Pauls at GSE Construction Co., Inc.
GSE Construction Co., Inc.

POSTED

about 6 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch DIP water mains, gate valves, fittings, water services, and fire hydrant assemblies on Walnut Street, Ebony Lane, and 247th Place. The scope of work includes the abandonment of existing water mains and requires the provision of all necessary materials, tools, and equipment. W.A. Rasic Construction Company, Inc. is soliciting subcontractor quotations for various trades, including waterworks, ready-mix concrete, PCC and AC paving, AC grind and cap, striping, traffic control, hot taps, trucking, and soil and material testing. The response deadline for quotations is October 19, 2026, at 1:00 PM. This opportunity is specifically set aside for DBE, MBE, WBE, and SBE firms, with the prime contractor encouraging maximum participation through economically feasible task breakdowns or consortia. Eligible subcontractors must possess a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. Additionally, subcontractors may be required to provide payment and performance bonds totaling 100 percent of their bid, with bond premiums reimbursed up to 1.5 percent. All selected subcontractors must execute the standard subcontract agreement and meet general insurance requirements.
W.A. Rasic Construction Company

POSTED

about 6 hours ago

DEADLINE

in 16 days
View Details

More opportunities from Province of British Columbia → District of Fort St James

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS