This Solicitation opportunity from California was posted on November 6, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for RFP 4223 Addendum No. 1 - San Pasqual Residence Reconstruction: Addendum No. 1 dated March 15, 2010, for RFP 4223 regarding the Design Build San Pasqual Residence Reconstruction. The document confirms the RFP due date remains May 12, 2010, and schedules mid-course presentations for D-BE teams (Clark, Citymark/Highland, and Legacy) on March 29, 2010, to clarify programmatic and performance requirements.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 4223 Addendum No. 2 - San Pasqual Residence Reconstruction: Addendum No. 2 for RFP 4223 regarding the Design Build San Pasqual Residence Reconstruction. This document confirms that the RFP due date remains May 12, 2010, at 3:00 p.m. and provides requested TOPO cad drawings as Attachments A and B.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 4223 Addendum No. 3 - San Pasqual Residence Reconstruction: Addendum No. 3 for RFP 4223 regarding the Design Build San Pasqual Residence Reconstruction. The document confirms the RFP due date remains May 12, 2010, provides instructions for picking up CAD files on CD (replacing voided attachments from addendum two), and schedules an additional non-mandatory site visit for March 25, 2010.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 4223 Addendum No. 4 - San Pasqual Residence Reconstruction: Addendum No. 4 for RFP 4223 regarding the Design-Build San Pasqual Residence Reconstruction. The document confirms the RFP due date of May 12, 2010, introduces three new attachments (Visionary Plan, LEED Prerequisites, and Fire Hydrant Locations), provides guidance on Major Use Permit compliance for square footage, and includes a Q&A section addressing county fees, tax, code compliance, and pricing forms.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 4223 Addendum No. 5 - Design Build San Pasqual Residence Reconstruction: Addendum No. 5 for RFP 4223 regarding the Design Build San Pasqual Residence Reconstruction. The document confirms the RFP due date remains May 12, 2010, and provides ten critical clarifications, including building height restrictions (single story), roofing requirements, and site plan revisions. It further defines specific housing unit types (Staff, Grandparent, Transitional, and Alumni) and provides guidance on the Administration and Community building types and the delineation of public versus private building fronts.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 4223 Addendum No. 6 - Design Build San Pasqual Residence Reconstruction: Addendum No. 6 for RFP 4223 regarding the Design Build San Pasqual Residence Reconstruction. The document confirms the RFP due date of May 12, 2010, and provides critical clarifications on water and sewer studies, power lines, DPLU fee waivers, and prevailing wage requirements. It includes revised technical requirements for floor plans, elevations, and sections, and provides Q&A responses regarding the Administration Building, housing types, and unit specifications.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 4223 Addendum No. 7 - San Pasqual Residence Reconstruction: Addendum No. 7 for RFP 4223 regarding the Design-Build San Pasqual Residence Reconstruction. The document provides nine technical clarifications, including temperature differential considerations, unit accessibility, appliance requirements, and revised unit configurations. It includes updated Technical Requirements (Section C) with functional data sheets for various residential unit types and specifies that the RFP due date remains May 12, 2010.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 4223 Addendum No. 8 - Design Build San Pasqual Residence Reconstruction: Addendum No. 8 for RFP 4223 regarding the Design Build San Pasqual Residence Reconstruction. The document confirms the RFP due date remains May 12, 2010, and provides a detailed Q&A section addressing technical design requirements, housing unit counts (minimum 30 units), construction schedules (14-month period), budget line item instructions, LEED certification responsibilities, and specific acoustic and material standards.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 4223 - Design-Build San Pasqual Academy Housing Reconstruction: The County of San Diego is soliciting proposals from pre-qualified Design-Build Entities to reconstruct approximately 14 LEED Silver certified residential buildings (30 units) and associated infrastructure at the San Pasqual Academy. The project includes a GMP of $4.5M for residences and $2M for infrastructure, with an optional $1M set-aside for an administration center. This is a best-value procurement requiring separate technical and pricing submissions.
PDF
PDF, Low priorityq-and-a
LowAI Summary for RFP 4223 Q&A No. 1 - San Pasqual Residence Reconstruction: Question and Answer document No. 1 dated April 5, 2010, regarding RFP 4223 for the Design Build San Pasqual Residence Reconstruction. This specific page lists contact information for design-build teams including Clark Builders, Highland Partnership, and Legacy Builders.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for RFSQ 4223 - Notice of Qualified Firms: Notice dated February 16, 2010, announcing the qualified firms (Citymark and Highland Clark Legacy) following the evaluation of responses to RFSQ 4223 for the San Pasqual Academy Residences Reconstruction Design-Build project.
TXT
TXT
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.