Rfp 5174 - Design-Build - County Administration Center Waterfront Park Development Project. Please See Attached Rfp Package For Additional Information.
Closed
RFP 5174State & Local
Submission Closed
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
HighAI Summary for Asbestos/Lead Prework Survey: CAC Central Plant: Dated September 22, 2011, this report from the County of San Diego Department of Environmental Health details the results of an asbestos and lead-based paint survey at the CAC Central Plant (1600 Pacific Highway). The survey was conducted in preparation for planned demolition. Key findings include the presence of asbestos in pipe gaskets and gray mastic, and high concentrations of lead in wood components of the Gardner Shop. The document provides technical data and recommendations for contractor compliance with Cal/OSHA and Cal/EPA regulations.
PDF
PDF, High priority: read this firstsow
HighAI Summary for County Administration Center Waterfront Park Development - Basis of Design: Dated October 11, 2011, this document provides the Basis of Design and bridging documents for the County Administration Center Waterfront Park Development for the County of San Diego. It includes a detailed project description, scope of work, performance specifications for subsurface improvements, LEED silver certification strategies, and comprehensive lists of architectural, mechanical, electrical, and landscape design drawings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for County Administration Center Waterfront Park Development - Basis of Design Vol 2 Part 6: Dated October 11, 2011, this document provides the Basis of Design and Project Outline Specifications for the County Administration Center Waterfront Park Development for the County of San Diego. It includes a comprehensive table of contents covering project descriptions, LEED strategies, and detailed outline specifications across multiple divisions (1-16), as well as extensive indices for architectural, mechanical, plumbing, electrical, and landscape design drawings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Project No. 06850-22-01: Update Geotechnical Investigation - County Administration Center: Dated March 29, 2002, this report by Geocon Incorporated provides an updated geotechnical investigation for the County Administration Center Waterfront Park in San Diego, CA. It includes soil and geologic conditions, groundwater monitoring, seismic hazard analysis, and technical recommendations for grading, foundations, and liquefaction mitigation to support the construction of two new parking structures.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 5174 Addendum 8 - Bridging Documents Drawings Revisions: This document is Addendum 8 for RFP 5174, pertaining to the San Diego County Administration Center Waterfront Park. It contains revised bridging documents and drawings provided by the Landscape Architect (Legend Associates) for the project.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 5174 Addendum No. 10 - Waterfront Park Development Project: Addendum No. 10 dated November 30, 2011, for the Waterfront Park Development Project (RFP 5174). It provides a tentative new proposal due date of December 19, 2011, cancels previously scheduled presentations from Addendum No. 9, and notifies bidders of a forthcoming addendum regarding cost control and constructability.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 5174 Addendum No. 11 - County Administration Center Waterfront Park Development: Addendum No. 11, dated December 8, 2011, for RFP 5174 regarding the Design-Build County Administration Center Waterfront Park Development Project. This document provides critical design revisions and clarifications, including modifications to subsurface structures, fountain basins, architectural finishes, paving/surfacing materials (granite and concrete), lighting fixtures, and site drainage.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 5174 Addendum No. 12 - Waterfront Park Development Project: Addendum No. 12 to RFP 5174 for the County Administration Center Waterfront Park Development Project. This document provides design revisions and clarifications regarding CAD electrical drawings, drawing labels, granite cladding specifications, and extended guarantee requirements. It also outlines the agenda for the 3rd Mid Course Review/Presentation, focusing on cost impacts and the $34 million GMP.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 5174 Addendum No. 13 - County Administration Center Waterfront Park: Issued December 27, 2011, Addendum No. 13 modifies RFP 5174 for the Design-Build County Administration Center Waterfront Park Development Project. Key changes include design revisions regarding cost-saving strategies, fountain basins, and paving material substitutions. It also updates the price proposal forms, establishes a new submission deadline for Additive Alternates (February 7, 2012), and provides a revised project timeline. The document includes updated Price Proposal and Additive Alternates Price Proposal forms.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 5174 Addendum No. 14 - Waterfront Park Development Project: Addendum No. 14 dated December 28, 2011, for the County Administration Center Waterfront Park Development Project (RFP 5174). It provides clarifications regarding fountain basin requirements in the GMP proposal and Additive Alternate #7, notes the availability of AutoCAD bridging documents, and includes a revised Additive Alternates Price Proposal form for the Design-Build Entity (D-BE).
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 5174 Addendum No. 15 - County Administration Center Waterfront Park Development Project: Addendum No. 15 for RFP 5174 regarding the County Administration Center Waterfront Park Development Project. This document updates the proposal due date to January 25, 2012, extends the questions deadline to January 13, 2012, cancels previous presentation dates, and establishes a new presentation schedule for Webcor Builders, C.W Driver, Inc., and McCarthy Building Companies, Inc. for February 2-3, 2012.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 5174 - Addendum No. 16 (County Administration Center Waterfront Park Development Project): Addendum No. 16 dated January 18, 2012, for RFP 5174 regarding the County Administration Center Waterfront Park Development Project. This document provides critical clarifications on site demolition (Askew Building), material requirements for Additive Alternates #4, #5, #7, and #10, and electrical panel location requirements for Additive Alternate #8.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 5174 Addendum No. 1 - County Administration Center Waterfront Park: Addendum No. 1 dated October 21, 2011, for RFP 5174 regarding the Design-Build County Administration Center Waterfront Park Development Project. This document updates the schedule for the Mandatory Pre-proposal Conference and the Mandatory Site Tour, both rescheduled for October 25, 2011.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 5174 Addendum No. 2 - County Administration Center Waterfront Park Development Project: Addendum No. 2 dated October 26, 2011, for RFP 5174 regarding the County Administration Center Waterfront Park Development Project. This document schedules a second non-mandatory site tour for October 28, 2011, and outlines the schedule for the first Mid Course Presentations on November 1, 2011, for three qualified Design-Build Entities: C.W. Driver, Inc., McCarthy Building Companies, Inc., and Webcor Builders.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 5174 Addendum No. 3 - County Administration Center Waterfront Park Development Project: Issued October 31, 2011, Addendum No. 3 modifies RFP 5174 for the County Administration Center Waterfront Park Development Project. This amendment provides the Design-Build Contract as an attachment to Section C (Contract Requirements) and includes a detailed draft of the agreement, defining key terms such as GMP, Cost of the Work, and project specifications.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 5174 - Addendum No. 4: County Administration Center Waterfront Park Development Project: Addendum No. 4 to RFP 5174, dated November 4, 2011, provides guidelines and requirements for Design-Build Entities (D-BE) to conduct geotechnical testing at the County Administration Center Waterfront Park project site. It specifies submission deadlines (November 9, 2011), operational hours for testing, and coordination requirements with the Project Manager. The document also includes a Right of Entry Permit Agreement for the geotechnical investigation.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 5174 Addendum No. 5 - CAC Waterfront Park Development Project: Issued November 4, 2011, Addendum No. 5 to RFP 5174 provides instructions for Design-Build Entities to obtain electronic bridging documents via a Digital Data Transfer (DDT) agreement. It includes a corrected fax number for communications, contact information for Water Fountain Permit Fees, and a Digital Data Licensing Agreement that outlines the terms, conditions, and confidentiality requirements for using the provided digital files.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 5174 Addendum No. 6 - County Administration Center Waterfront Park Development: Addendum No. 6 dated November 7, 2011, for RFP 5174 regarding the County Administration Center Waterfront Park Development Project. This document schedules a third non-mandatory site tour of the Chiller Room, Cooling Tower, and Electric Room for qualified Design-Build Entities on November 9, 2011.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 5174 Addendum No. 7 - County Administration Center Waterfront Park Development Project: Addendum No. 7 to RFP 5174 for the County Administration Center Waterfront Park Development Project. This document provides critical revisions to the Basis of Design (including EV charging stations and structural mat slab details), updates to RFP instructions regarding submittals and CSI Master Format, and introduces Exhibit F (Insurance and Bonding Requirements). It also provides clarifications on DVBE requirements, BIM scope, parking standards, and soil depth specifications, while replacing the Price Proposal Form (Page A-4) and updating geotechnical reference materials.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 5174 Addendum No. 9 - County Administration Center Waterfront Park: Addendum No. 9 dated November 17, 2011, for RFP 5174 regarding the County Administration Center Waterfront Park Development Project. Key changes include a new proposal due date of December 7, 2011, an extended questions deadline of November 28, 2011, and a revised GMP limit of $34,000,000. It also outlines a new schedule for mid-course reviews and final presentations for Webcor Builders, C.W. Driver, Inc., and McCarthy Building Companies, Inc.
PDF
PDF, High priority: read this firstpresolicitation
HighAI Summary for RFP 5174: CAC Waterfront Park Development Pre-Proposal Conference: Presentation slides from the October 25, 2011, pre-proposal conference for the County of San Diego's CAC Waterfront Park Development project. The document outlines the two-step solicitation process, key dates (proposals due Nov 22, 2011), mid-course presentation requirements, and evaluation criteria for a design-build contract with a GMP of $34,000,000. It includes a detailed price proposal structure across four phases and various additive alternates.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 5174: CAC Waterfront Park Development Project: Issued October 19, 2011, by the County of San Diego, this Request for Proposals (RFP) seeks a Design-Build Entity (D-BE) to design and construct a 12-acre County Administration Center (CAC) Waterfront Park. The project includes a 254-stall underground parking garage and surface architectural elements with a LEED-NC Certified minimum requirement. The procurement is a second-step process for pre-qualified firms, with a Guaranteed Maximum Price (GMP) of $4,000,000. Proposals are due November 22, 2011.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 5174 - County Administration Center Waterfront Park Development Project - Addendum 8: Addendum No. 8, dated November 15, 2011, modifies RFP 5174 for the County Administration Center Waterfront Park Development Project. Key changes include revisions to subcontractor identification, updated bonding capacity requirements, expanded IT/communications scope, revised proposal stipend from $5,000 to $10,000, and updates to LEED certification and site management requirements. It also includes technical revisions to the Basis of Design regarding electrical equipment, concrete specifications, and the addition of an allowance for East Garden Renovation.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 5174 - County Administration Center Waterfront Park Development Project - Addendum No. 12: Addendum No. 12 to RFP 5174 for the County Administration Center Waterfront Park Development Project. This document provides design revisions and clarifications regarding CAD electrical drawings, drawing references, and granite cladding specifications. It also updates the extended guarantee requirements in the Contract Requirements section and outlines the agenda for the 3rd Mid Course Review/Presentation, focusing on cost impacts and the $34 million GMP.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 5174 Utility Survey 1983: A Request for Proposal (RFP) for a utility survey, dated 1983, provided for reference purposes.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for S16965 RFP 5174 Bridging Documents Appendix A: Technical bridging documents for the San Diego County Administration Center Waterfront Park. The file contains conceptual mechanical floor plans, equipment schedules (sound attenuators, cooling towers, and pumps), and a directory of project engineers. These documents are designated as 'not for construction' and serve as technical specifications for the procurement process.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for S17405 RFP Appendix B - Surface Park Design Drawing (Addendum 11): This document consists of revised design drawings for a surface parking area, provided as Appendix B and updated via Addendum No. 11 for solicitation S17405. It contains critical technical specifications and layout drawings necessary for bid preparation.
PDF
PDF, Low priorityother
LowAI Summary for CAC Waterfront Park Sewer and Storm Drain Easement Documents: A collection of historical records including a 2002 transmittal letter, a 1966 Board of Supervisors resolution, and a legal easement agreement granting the City of San Diego rights of way for sewer and storm drain infrastructure across County Administration Center property.
PDF
PDF, Low priorityother
LowAI Summary for County of San Diego Administrative Manual Item 0050-01-7: An administrative policy document from the County of San Diego, effective October 26, 2001, outlining guidelines for energy conservation in county buildings. It establishes standards for HVAC, lighting, and appliance procurement in alignment with Board Policy G-15 and Title 24, and assigns oversight responsibilities to the Department of General Services.
PDF
PDF, Low priorityother
LowAI Summary for County of San Diego Board of Supervisors Policy B-53: Small Business Policy: This document outlines the County of San Diego's Board of Supervisors Policy B-53 regarding Small Business Policy (SBP). It establishes guidelines to maximize the participation of small business enterprises (SBE) in County procurement activities, defines qualifying small business criteria (e.g., 100 or fewer employees, <$12M annual gross receipts), and mandates fair treatment and the breaking down of large contracts into smaller segments when feasible.
PDF
PDF, Low priorityother
LowAI Summary for County of San Diego Board of Supervisors Policy B-67: Board of Supervisors Policy B-67 regarding Recycled Products Procurement for the County of San Diego. The policy mandates the preference of products meeting EPA or California Recycled Content Product Directory standards, establishes a price preference of up to 5% for recycled products, and outlines guidelines for paper product procurement and waste reduction.
PDF
PDF, Low priorityother
LowAI Summary for County of San Diego Board of Supervisors Policy G-15: This document is a Board of Supervisors Policy (G-15) for the County of San Diego, California. It establishes general principles and objectives for the design, construction, and improvement of County-owned or leased facilities, with a heavy emphasis on green building standards, LEED certification, energy efficiency, and resource conservation.
PDF
PDF, Low priorityother
LowAI Summary for County of San Diego Board Policy B-39a: Disabled Veterans Business Enterprise Program: This document is a Board of Supervisors Policy (B-39a) for the County of San Diego, California. It establishes the Disabled Veterans Business Enterprise (DVBE) program to facilitate the participation of disabled veteran businesspersons in County procurements. The policy sets a 3% DVBE subcontracting participation goal for applicable contracts and outlines the scope, general requirements for compliance, and implementation methods for public works and service contracts.
PDF
PDF, Low priorityspecifications
LowAI Summary for Preliminary Geologic Fault Investigation - County Administration Center Waterfront Park: A geotechnical report dated October 28, 2011, prepared by Geocon Incorporated for BRG Consulting, Inc. The document provides a preliminary geologic fault investigation and soil analysis for a proposed underground parking structure and park development at 1600 Pacific Highway, San Diego, CA. It details soil conditions (undocumented fill, bay deposits, and old paralic deposits), groundwater levels, and liquefaction risks.
PDF
PDF, Low priorityspecifications
LowAI Summary for Project No. 06850-52-02: Limited Geologic Fault Investigation - County Administration Center: A geologic fault investigation report dated September 27, 2011, prepared by Geocon Incorporated for BRG Consulting, Inc. The document provides a preliminary evaluation of seismic hazards, soil conditions (undocumented fill, bay deposits, and old paralic deposits), and groundwater levels for the proposed County Administration Center Waterfront Park in San Diego, California.
PDF
PDF, Low priorityother
LowAI Summary for RFP 5174 - CAC Waterfront Park Development Project Sign-In Sheet: Attendee sign-in sheets from the Pre-Proposal Conference for RFP 5174, regarding the CAC Waterfront Park Development Project. The document contains names, company affiliations, and contact information for representatives from various firms including McCarthy Bldg Co, Soltec Pacific, and Webcor.
PDF
PDF, Low priorityother
LowAI Summary for RFP 5174 County Administration Center Events Reference List: A reference list of past events and parking assignments at the County Administration Center, including events such as EarthFair, Gator by the Bay, and the Sicilian Festival.
TXT
TXT, Low priority1 page · award
LowAI Summary for RFP 5174 - Notice of Intent to Award (Waterfront Park Development): Notice of Intent to Award for RFP 5174, Design-Build County Administration Center Waterfront Park Development Project. The Department of General Services has selected McCarthy Building Companies, Inc. as the recommended offeror. The notice was posted from March 16, 2012, to March 23, 2012.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for RFSQ 5174 - Notice of Qualified Firms (CAC Waterfront Park): Dated September 6, 2011, this notice announces the results of the design-build prequalification (RFSQ 5174) for the CAC Waterfront Park Development Project. The qualified firms identified are C.W. Driver, Inc., McCarthy Building Companies, Inc., and Webcor Builders.
PDF
PDF, Low priorityother
LowAI Summary for Savings By Design 2010-2012 Participant Handbook: A participant handbook detailing the policies and procedures for the Savings By Design (SBD) program (2010-2012 cycle). The program is a statewide nonresidential new construction energy efficiency initiative funded by California utility customers and administered by various utilities under the CPUC. It provides design assistance and financial incentives for projects that exceed energy efficiency thresholds.
PDF
PDF, Low priorityother
LowAI Summary for SDPD Neighborhood Policing Resource Memo - Waterfront Park Master Plan: A memorandum dated April 17, 2002, from Ted Parker of the SDPD Neighborhood Policing Resource Team to Project Manager Nick Marinovich. The document provides security recommendations and area crime statistics for the San Diego County Administration Center Waterfront Park Master Plan, focusing on crime prevention through environmental design (CPTED) for parking garages, graffiti mitigation, and skateboarding deterrence.
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
ZIP
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.