This Solicitation opportunity from California was posted on July 20, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for RFP 6999 Addendum 1 - Mills Building Tenant Improvement: This document is Addendum No. 1 to Request for Proposals (RFP) 6999 for Construction Manager at Risk with a Guaranteed Maximum Price for Mills Building Floors 2,4,5,6 and 8 Tenant Improvement Project by County of San Diego. Dated August 12, 2015, it revises the project description, contract duration, and Guaranteed Maximum Price details. It replaces the Price Proposal form and adds Insurance and Bonding Requirements. The addendum clarifies the County's estimate for Direct Pass-Through Costs and includes updated insurance coverage minimums and limits for contractors.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 6999 Addendum 2 - Mills Building Tenant Improvement: This document is Addendum No. 2 to the Request for Proposals (RFP) 6999 for the Mills Building Floors 2,4,5,6 and 8 Tenant Improvement project. Issued by the County of San Diego Department of Purchasing and Contracting on August 20, 2015, it revises the proposal due date to August 26, 2015, at 3:00 pm PDST. The addendum provides updated submission instructions and contact information for questions regarding the addendum.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for RFP 6999 Addendum 3 Mills Building Tenant Improvement: This document is Addendum No. 3 dated August 21, 2015, for RFP 6999 concerning the Mills Building Floors 2,4,5,6 and 8 Tenant Improvement project. It revises the Essential Requirements questionnaire by deleting questions 20 and 21 and revising question 22. The addendum includes a revised questionnaire to replace pages 25 through 29 of the original solicitation. The document outlines disqualifying criteria related to licensing, insurance, financial strength, bonding, safety, and labor compliance for offerors. Contact information for the procurement officer is provided for questions regarding the addendum.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 6999 Construction Manager at Risk for Mills Building Tenant Improvement: This Request for Proposals (RFP) 6999, dated July 20, 2015, solicits qualified firms to provide Construction Manager at Risk services with a Guaranteed Maximum Price (GMP) for tenant improvements on floors 2, 4, 5, 6, and 8 of the Mills Building in San Diego, CA. The project includes preconstruction and construction phases with a GMP not to exceed $2,500,000. The RFP outlines submission requirements, a schedule including a pre-proposal conference on July 27, 2015, and a proposal due date of August 20, 2015. The document details project scope, evaluation criteria, and contractual conditions, emphasizing compliance with public contract codes and prevailing wage laws.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 6999 Mills Bldg 2015 Restack Preliminary Schedule: This document is a preliminary schedule for the Mills Building 2015 Restack project covering the 2nd, 4th, 5th, 6th, and 8th floors. It is associated with RFP 6999 and includes a CMAR tentative schedule outlining key tasks and timelines from November 2, 2015, to September 1, 2016. The schedule details phases such as project meetings, scope development, preconstruction meetings, mobilization, tenant improvement phases for various floors, and final punch list and turnover activities. This schedule is critical for understanding the project timeline and coordination requirements.
PDF
PDF, High priority: read this firstpresolicitation
HighAI Summary for RFP 6999 Pre-Proposal Conference Slides July 27, 2015: This document contains the pre-proposal conference slides for Request for Proposal (RFP) 6999 dated July 27, 2015, issued by the County of San Diego. It provides an overview of the Construction Management at Risk project with a Guaranteed Maximum Price for tenant improvements at the Mills Building floors 2,4,5,6, and 8. Key content includes project description, target schedule, solicitation process and schedule, proposal due date, evaluation criteria, and instructions for submitting questions and proposals. The document emphasizes the importance of adhering to the RFP format and requirements, and notes that addenda will be posted on BuyNet by August 10, 2015.
PDF
PDF, High priority: read this firstsow
HighAI Summary for RFP 6999 Section C Construction Documents: This document is part of the RFP 6999 package, specifically Section C, containing construction documents for a project managed by Michele Arnold Kush. It includes detailed reflected ceiling plans, lighting fixture specifications, and general construction notes for the County of San Diego HHSA building at 1255 Imperial Ave. The document outlines installation requirements for new LED lighting, suspended ceiling systems, seismic bracing, fire safety measures, HVAC modifications, and compliance with NEC and Title 24 standards. It serves as a critical technical specification for contractors to follow during construction.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for RFP 6999 Section C Division of Costs: This document is Section C of RFP 6999, titled 'Division of Costs.' It details the allocation of Direct Pass-Through Costs, Contractor's Fee, and Owner costs for the Scope of Services and any Change Orders. The document includes tables categorizing costs related to Project Jobsite Staff, Cost of the Work, Job Site Temporary Facilities, General Requirements, Temporary Utilities and Cleaning, and Indirect and Miscellaneous Costs. It specifies which costs are direct pass-through, which include contractor's fees, and which are paid by the owner. The document is a critical part of the solicitation, providing essential cost division information for contract pricing and management.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for RFP 6999 Section C Draft Contract San Diego County: This document is a draft contract agreement for RFP 6999, Section C, between the County of San Diego and a contractor for a project involving design and construction services. It includes recitals, definitions, and detailed articles outlining the scope of work in two phases: pre-construction services and construction. The contract specifies payment terms, contract timeframes, liquidated damages, compensable delays, and termination rights. The document serves as the formal agreement incorporating various contract documents and conditions, establishing the mutual obligations and terms for project execution.
PDF
PDF, High priority: read this firstgeneral-conditions
HighAI Summary for RFP 6999 Section C Draft General Conditions: This document is the draft of Section C General Conditions for RFP 6999, detailing the contractual provisions governing the construction project. It includes articles on general provisions, contractor and county responsibilities, contract administration, subcontractors, changes in the work, contract time, payments, protection of persons and property, insurance and bonds, correction of work, termination, statutory requirements, and miscellaneous provisions. The document defines key terms such as Legal Requirements, Application for Payment, Change Order, Claim, and Contractor's Fee. It serves as a critical part of the contract outlining rights, duties, and procedures for both the county and contractor to ensure compliance and successful project execution.
PDF
PDF, High priority: read this firstsow
HighAI Summary for RFP 6999 Section C Scope of Preconstruction Services: This document is Section C of RFP 6999, detailing the Scope of Preconstruction Services for a construction project. It outlines tasks during the Construction Documents phase including collaboration with County representatives and Architect/Engineer, preparation of construction cost estimate and schedule, investigation of existing conditions, identification of construction risk factors and mitigations, constructability review, and preparation of the Guaranteed Maximum Price (GMP) package. The GMP package includes a signed cover letter, GMP list, subcontractors and contract values, contractor's fee, general conditions fee, allowances, contract contingency, construction schedule, jobsite staff identification, and other related items. The document serves as a statement of work defining preconstruction responsibilities and deliverables.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for RFP 969 Pre-Proposal Conference Sign-In Sheet 7-27-15: This document is a sign-in sheet for the pre-proposal conference held on July 27, 2015, for RFP 969 regarding the Construction Manager at Risk with a Guaranteed Maximum Price for the Mills Building Floor R2-4.5, 6 and 8 Tenant Improvement Project. It lists attendees with their names, company names, emails, and phone numbers. The document serves as an attendance record for the conference related to the solicitation.
TXT
TXT
TXT
TXT
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this