RFP - AC Interference Mitigation System Construction

Active
2026C-00004International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Saskatchewan Water Corporation is seeking a proponent for the AC Interference Mitigation System Construction project, identified as solicitation 2026C-00004. This work follows the completion of the BPNPWSS-Regina Regional Pipeline and subsequent design revisions finalized in July 2026. The selected contractor will be responsible for supplying and installing corrosion-protection materials for the mitigation system according to the issued for construction designs, which includes mobilizing all necessary personnel and equipment to the specified locations in Saskatchewan. Interested parties must submit their responses by September 22, 2026. The procurement process includes an optional site visit, and all inquiries should be directed to the procurement contact. The project aims to finalize the interference mitigation requirements that were developed by Associated Engineering, CorrPro, and Commonrow Consulting.

General Info

Saskatchewan Water Corporation seeks contractor for AC interference mitigation system construction by September 2026.

Agency

Saskatchewan Public Sector → Saskatchewan Water CorporationView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

SK, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencySaskatchewan Public Sector → Saskatchewan Water Corporation
Contacts1 person available
OfficeN/A
Organization / Agency
Saskatchewan Public Sector → Saskatchewan Water Corporation
View Agency Profile
Office AddressN/A
Contacts

Full Description

Show more
The BPNPWSS-Regina Regional Pipeline project was completed and successfully commissioned in September 2025. After completing most of the deficiency list, the Contractor turned over the project to SaskWater by the end of October 2025. After the pipeline contract was completed, the AC interference mitigation design continued, with Associated Engineering (Sask) Ltd. managing the design work of CorrPro and Commonrow Consulting for the Regina Regional pipeline project. The design was completed in March 2026 and was further revised due to land control concerns stemming from the need to relocate two (2) locations. The revised design was completed in July 2026. The successful Proponent will supply and install corrosion-protection materials for an AC interference mitigation system in accordance with the design documents and IFC designs. The successful Proponent will be primarily responsible for supplying and mobilizing personnel, including necessary equipment, to the identified locations to complete the scope of work described in the RFP documents.
An optional site visit is also scheduled for interested Proponents. Please get in touch with the RFP contact as described in the RFP documents.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a comprehensive infrastructure initiative managed by James W. Fowler Co. for the Metropolitan Water District of Southern California. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of various contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins between 54 and 145.5 inches. Additional construction requirements include four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and associated piping systems. The project also encompasses critical civil and site work, including the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. James W. Fowler Co. provides specific support for M/W/DBE subcontractors, including assistance with bonding, insurance, lines of credit, and the procurement of equipment and materials. Bids are due by September 29, 2026, with all negotiations required to be finalized 24 hours prior to the bid opening.
James W. Fowler Co.

POSTED

about 2 hours ago

DEADLINE

in 8 days
View Details

More opportunities from Saskatchewan Public Sector → Saskatchewan Water Corporation

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS